cast-in-place pile 中文意思是什麼

cast-in-place pile 解釋
板樁結構物灌注樁
  • cast : vt (cast; cast)1 投,扔,擲,拋。 ★此義動詞通常用 throw cast 只用於若干特殊句子。2 丟棄,拋棄;...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • place : n 1 地方,場所,處;所在,位置;〈抽象名詞〉空間 (opp time)。2 (書中的)處所,頁。3 市區;市,...
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  2. Construction technique of cast in place pile - foundation used in grade separation bridge on beijing - chengde expressway

    京承高速公路立交橋旋挖樁基礎施工技術
  3. Rotatory boring cast - in - place pile

    深基礎回轉鉆孔灌注樁
  4. The quantity direct control and trouble treatment of drill hole and cast - in - place pile

    鉆孔灌注樁的質量監督控制及事故處理
  5. Since the pebble structure is of big pellet easy to be permeated ant it is difficult to smash and drill, the appliance with big diameter and deep cast - in - place pile has been greatly restricted

    卵石地基具有顆粒大、透水性強、進尺和破碎困難、容易垮孔等困難,限制了大直徑深孔鉆孔灌注樁在其中的應用。
  6. Construction of cast - in - place pile of hand dug hole for 1780 project

    1780工程人工挖孔灌注樁施工
  7. The grouting test result shows that this technique of pile foundation construction is effective, it can not only increase the upper and skin friction of the cast - in - place pile, but also improve the bearing capacity of the cast - in - place pile, and gain a larger economic benefit for whole project at the same time

    經樁端壓漿實驗結果表明,該技術可以增加鉆孔灌注樁樁端阻力和樁側壁摩阻力,是一項行之有效的樁基施工技術,它可有效提高鉆孔灌注樁的承載能力,同時提高經濟效益。
  8. Impact of bottom settlings and mud cake on vertical supporting capacity of large - diameter predrilled cast - in - place pile

    樁底沉渣與樁周泥皮對大直徑鉆孔灌注樁豎向承載力的影響分析
  9. Method to evaluate pile capacity precisely by using the coefficient of cleaning slime and coefficient of construction process and by controlling the total duration of construction is proposed herein after analyzing the influences of slime at pile bottom, thickness of mudcake by the side of pile, shape of hole wall, time of construction and construction process on the bearing capacity of large diameter cast - in - place pile

    本文通過分析樁底沉渣、樁側泥皮厚度、孔壁形狀、成樁時間及施工工藝等對大口徑灌注樁承載力的影響,提出了在樁承載力計算中引入清底系數及成樁工藝系數,並控製成樁總時間以較準確地評價單樁承載力的方法。
  10. Considering the engineering of trail pile in hubei jingzhou yangtze river highway bridge, the construction process of deep cast - in - place pile under pebble geological structure, the limit load - bearing capacity of single pile, side friction stress and head drag are researched in this thesis deeply

    論文結合湖北省荊州長江公路大橋的試驗樁工程,深入研究了江漢平原地區卵石地基深鉆孔灌注樁的施工工藝、單樁極限承載能力、樁側摩阻力和端阻力。
  11. Test and analysis of vertical load for clay excavation hole cast - in - place pile

    粘性土挖孔灌注樁豎向荷載測試與分析
  12. It is stated clearly by researching, the cast - in - place pile must be constructed according to strict technological process on condition that pebble geological structure, and more important that the drilling technology and the reasonable property index of mud are chose correctly on the basis of the condition of pebble geological structure

    研究表明,江漢平原地區卵石地基條件下,鉆孔灌注樁必須要按嚴格的工藝流程施工,最重要的是根據卵石地基的地質情況,正確選擇鉆孔工藝和合理的泥漿性能指標。
  13. Self - balanced capacity test of large cast - in - place pile at runyang major bridge

    潤揚大橋大噸位樁承載力自平衡法試樁研究
  14. This paper effectively deals with water inflow for excavated and cast - in - place pile under water with the constrained condition and strata of large water content during the course of forming hole and casting pile by using triple tubes directional jet as waterproof curtain, to decrease the compression for river channel, and ensure safety and quality in the phase of construction

    摘要針對水中施工挖孔樁,條件受到限制、地層中含水量較大,為盡可能避免造成對河道的佔用與影響,採用三重管定噴技術做止水帷幕,有效地解決了成孔成樁過程中涌水等問題,保證了工程施工的安全與質量。
  15. Diving casting cast - in - place pile

    深基礎沉管灌注樁
  16. Driven cast - in - place pile

    沉管灌注樁
  17. With practical instances, this paper introduces construction technology and matters needing attention of repeated - stroked vibrating driven cast - in - place pile

    摘要文章結合工程實例介紹復打法振動沉管灌注樁的施工工藝及注意事項。
  18. Based on four project cases of vibro casing cast - in - place pile in silty sand foundation, the liquefaction of sand and its consequent pile breaking are analyzed, and suggestions on how to adopt values of the design parameters of a single pile are presented

    摘要以4個在粉砂地基中均採用振動沉管灌注樁的工程為例,分析了施工中砂土的液化及由此引起的斷樁,並對單樁設計參數的取值提出了建議。
  19. Some means of ground treatment are discussed. all kinds of ground treatment methods are analysed. they are the deeping pile, prestressed tubular piles, diving casing cast - in - place pile, which are often used in shao xing. some problems about design and constrction are proposed

    另外,對紹興城區常用的各種地基形式如:水泥攪拌法、管樁、沉管灌注樁等進行了分析,提出了在設計和施工中應注意的問題。
  20. This paper expounds the application of the cast - in - place pile for its function and grouting technique in the foundation project of bridge construction

    摘要通過對鉆孔灌注樁地基處理的工作機理及樁端壓漿技術在橋梁建設地基工程中的應用。
分享友人