center cap 中文意思是什麼

center cap 解釋
防塵罩
  • center : n vt vi 〈美國〉=centre n 1 中心;中心點;圓心;中央;中樞,核心;中心人物;根源,起源。2 〈常C ...
  • cap : n 1 無邊帽,便帽;制服帽;軍帽;頭巾。2 鞘,(筆)套,蓋,罩子;(鞋)尖。3 【建築】柱頭;【礦物...
  1. We shall start the block from rest at the center point of the track and force them apart by exploding the cap with an electric spark.

    開始時,將兩個滑塊靜止置放在槽的中心,然後利用電火花引爆雷管,迫使它們分開。
  2. We shall start the blocks from rest at the center point of the track and force them apart by exploding the cap with an electric spark.

    開始時,將兩個滑塊靜止置放在槽的中心,然後利用電火花引爆雷管,迫使它們分開。
  3. We shall start the two blocks from rest at the center point of the track and force them apart by exploding the cap with an electric spark.

    開始時,將兩個滑塊靜止置放在槽的中心,然後利用電火花引爆雷管,迫使它們分開。
  4. The ascend and descend of work bench by screw pole and it can control the rough adjust effectively, and micro - adjust by screw cap of power head, the center hole of bench are coaxial with the spindle, and it put the holder available, and added the aerosol lubricate system in the air current it has the function of filter

    該機應用有國際先進的徑向鉚接技術外,同時採用絲桿升降式工作臺機頭部分固定,臺面具有夾具梯形槽,工作臺中心孔徑與主軸軸線同軸,可用於夾具定位。電控部分加裝數顯時間繼電器,數顯計數器,方便操控。
  5. In this paper, in order to solve the difficulties in the rain pipe construction in jianyu road of yulin city, the pipe - pushing technique for the hand - type tool pipe in the sand soil layer has been researched by experiments in which many practice problems were considered such as the movement and deformation of sand soil, the difficulties for the pipe to enter the scheduled work soil, the collapse of excavation surface, the departure of pipe center and the difficulties to correct this departure. by both the calculations for the stabilities of back - supporting soil body and excavation surface and the theoretical analysis on the reasons for the departure ' s producing, some construction techniques were introduced and adopted in this paper which include not only the change and reinforcement to both the back - supporting soil body and the scheduled work soil body but also the settings of pipe cap, lattice and correcting system on the head of the tool pipe

    本文針對榆林市建榆路雨水管道中遇到的技術難題,進行手掘式工具管砂土層頂管法施工技術試驗研究,在研究中考慮砂土層存在的后靠土體移位、變形,工具管難以進入出洞土體,挖掘面易坍塌、管道中心易偏差及難糾偏等問題,通過對后靠土體和挖掘面的穩定計算及偏差產生原因的理論分析,提出並採用后靠土體換填加固,出洞土體換填加固,以及在工具管頭部設置管帽、格柵、糾偏系統等技術措施
  6. Bm12 t is a kind of medium sized orbital riveting machine and driving by hydraulic. its adopted the advanced orbital technology, process by cold rolling. the ascend and descend of power by screw pole and it can control the rough adjust effectively, and micro - adjust by screw cap of power head, the center hole of bench are coaxial with the spindle, and it put the holder available

    Bm12t是液壓類中型徑向鉚接機,該機應用有第五代擺輾鉚接技術外,同時採用絲桿升降式動力頭機頭部分不固定,臺面具有夾具梯形槽,工作臺中心孔徑與主軸軸線同軸,可用於夾具定位。
  7. Its adopted the advanced radial technology, the motion path of riveting - head resembles 11 pieces plum blossom s shapes. the ascend and descend of power by screw pole and it can control the rough adjust effectively, and micro - adjust by screw cap of power head, the center hole of bench are coaxial with the spindle, and it put the holder available

    Jm9t是液壓類中型徑向鉚接機,除應用有國際先進的11瓣梅花徑向鉚接技術外,該機加大了工作臺面,並具有夾具梯形槽,工作臺中心孔徑與主軸軸線同軸,可用於夾具定位。
  8. Jm6tq is developed in foundation of jm6t, its adopted the advanced radial technology, the motion path of riveting - head resembles 11 pieces plum blossom s shapes. the ascend and descend of power head by screw pole and it can control the rough adjust effectively, and micro - adjust by screw cap of power head, the center hole of bench are coaxial with the spindle, and it put the holder available, and added the aerosol lubricate system in the air current it has the function of filter

    Jm6tq氣動是在jm6t基礎上發展而來的氣動z中小型徑向臺式鉚接機,除應用有國際先進的11瓣梅花徑向鉚接技術外,該機應用有國際先進的徑向鉚接技術外,同時採用絲桿升降式工作頭,臺面具有夾具梯形槽,工作臺中心孔徑與主軸軸線同軸,可用於夾具定位。
分享友人