charging schedule 中文意思是什麼

charging schedule 解釋
裝料程序
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. Tank size, supports, acid concentrations, charging schedule, plate alignment, etc. are the same as described.

    槽的尺寸,支架,酸的濃度,充電時間,極板的排列等與所描述的一樣。
  2. A ( iv master system is an auto - - contro1 system dimed to di spatch thc ciirr l crs acc ( ) rding to the conveying task, to fulfill the task efficiently along the r ( ) ut e under inte1lectual ized traffic management, and schedule the c % lrri ers for auto - - charging

    自動導向車( agv )地面系統是根據接收到的物料搬運任務,合理調度車輛,在智能交通管理控制下,沿規定的路線自動高效地完成物料搬運任務,並及時調度小車自動充電的自動控制系統。
  3. In the research case of 11 tapping during night shift on december 31, 2000, optimized schedule strategy can cut down 65 minutes at most used for processing from charging into converter to slab out of caster for each tapping. with the model, it is possible to dynamically adjust schedule and reorder or reorganize production process

    以煉鋼廠2000年12月31日中班11爐連鑄鋼的生產調度計劃為例,利用模擬模型制定和優化的調度計劃使鋼水從煉鋼到連鑄的作業時間最大可以節約65分鐘;利用煉鋼連鑄生產調度時間petri網模型,還可以根據實際生產條件的變化(譬如設備故障)對生產進行動態調整,以方便組織生產。
  4. During the process of foundry charging mixing. the information of loss ratio and consistent chemical composition have been considered which can aid technologists to get the minimum cost mixing schedule for the foundry charging mixing

    該系統使用方便,在配比過程考慮到了元素的燒損,這樣一方面實現了準確的爐料配比,另一方面在保證化學成分在控制要求的條件下實現了成本的最低化對實際的鑄件生產有著重要的作用。
分享友人