close lining 中文意思是什麼

close lining 解釋
內殼板
  • close : vt 1 關(窗等),閉(眼等);蓋(蓋子等);鎖閉,封閉,塞,隔絕。 ★對 door box drawer 等,口語較...
  • lining : n. 1. (衣服等的)襯里,裡子;襯料。2. 〈古語〉內容。3. 裝襯里[襯套等]。4. 【機械工程】襯,襯套,套筒,襯墊;(汽機的)氣套。5. 【建築】隔板。
  1. The company has international equipment of advanced level machine, produce per year of all kinds lining cloth 27 million meters, and the series such as cloth of line of bosom of form a complete set, shoulder line, waist line, colophony line, pocket is close 100 breed, 10 million layette installs the productivity of complementary makings, become company of shuang baijiang of chinese garment industry, national level is new and high technical company, obtained self - supporting imports and exports to counterpoise, pass attestation of system of iso9002 international quality

    公司擁有國際先進水平機器設備,年產各類襯布2700萬米,以及配套胸襯、肩襯、腰襯、樹脂襯、口袋布等系列近百個品種, 1000萬套服裝輔料的生產能力,成為中國服裝行業雙百強企業,國家級高新技術企業,並取得了自營進出口權,通過iso9002國際質量體系認證。
  2. Plastics piping systems for renovation of underground non - pressure drainage and sewerage network - part 3 : lining with close - fit pipes

    地下非壓力排水和排污管網更新用塑料管道系統.第3部分:緊配合管用襯層
  3. Plastics piping systems for renovation of underground non - pressure drainage and sewerage networks - lining with close fit pipes

    地下無壓排水管網和污水管網翻新用塑料管道系統.緊密配合管加襯
  4. Plastics piping systems for renovation of underground gas supply networks - part 3 : lining with close - fit pipes ; german version en 14408 - 3 : 2004

    地下氣體供給網路的翻修用塑料管道設備.第3部分:緊配
  5. Plastics piping systems for renovation of underground water supply networks - part 3 : lining with close - fit pipes

    地下水供給網路的翻新用塑料管道設備.第3部分:緊配合管道襯
  6. Plastics piping systems for renovation of underground gas supply networks - part 3 : lining with close - fit pipes

    地下氣體供給網路的翻修用塑料管道設備.第3部分:緊配合管道襯
  7. Plastics piping systems for renovation of underground water supply networks - part 3 : lining with close - fit pipes ; german version en 14409 - 3 : 2004

    地下水供給網路的翻新用塑料管道設備.第3部分:緊配合
  8. Iraq braced for war, lining the streets of baghdad with fighting positions and foxholes, while the pentagon moved b - 2 stealth bombers from whiteman air force base in missouri to bases close to iraq. brace for, prepare oneself for something unpleasant or difficult

    伊拉克加緊備戰,在巴格達街道兩側布置了許多戰位和散兵坑,另一方面,五角大樓將數架b - 2隱身轟炸機從密蘇里州的懷特曼空軍基地派往接近伊拉克的基地。
  9. Plastics piping systems for renovation of underground non - pressure drainage and sewerage networks - part 3 : lining with close - fit pipes ; german version en 13566 - 3 : 2002

    地下非承壓排水排污網翻新用塑料管道系統.第3部分:緊
分享友人