comparison of projects 中文意思是什麼

comparison of projects 解釋
方案比較
  • comparison : n. 1. 比較,對照;類似。2. 【語法】比較法;【修辭學】比喻。
  • of : OF =Old French 古法語。
  • projects : 各國電子佛典計畫
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. The author then expound the definition, function and advantages of the electronic b / l from the comparison between “ electronic b / l ” and “ b / l computerlizing ” to help the readers to acquaint themselves with some basic elements of the electronic b / l. “ the second chapter introduces the operation of the electronic b / l in practice basing on the above introduction. the general idea of its operation is given through the introduction of “ seadocs ” experiment 、 “ cmi ” rules and “ bolero ” system - - three of the most influential electronic b / l projects and some other representative ones

    第二章在對電子提單有所了解的基礎上較詳細地介紹了電子提單的應用情況,通過對「 seadocs試驗」 、 「 cmi規則」和「 bolero系統」這三個國際上最有影響力的電子提單實踐項目以及其他一些較有代表意義的電子提單實踐項目的介紹,讓讀者對電子提單的發展情況有一個主要的了解。
  3. This essay focuses its study and comparison on the tendering system of international financial organization, raises the necessity of foreign loan tendering system, considering the existing tendering situation in fields of capital construction, mechanical equipment, imported electrical and mechanical equipment, government purchasing and foreign loan purchasing, and gives constructive views in tendering and bidding procedure of project construction agencies and construction supply enterprises, so as to improve the construction level of the foreign loan projects in our country, increase the bidding ability of our enterprises for participating international projects, and promote the establishment and improvement of the tendering and bidding management system in our country after learning from tendering purchasing system abroad

    本文主要研究和對比國際金融組織的招標制度,結合我國在基本建設項目、機械成套設備、進口機電設備、政府采購、國外貸款采購等領域的招標投標現狀,提出研究國外貸款招投標制度的必要性並結合實際工作經歷,為我國項目建設單位和貨物與工程供應企業在招標投標環節提出建設性意見。以期提高我國利用國外貸款項目的建設水平,提高我國的企業參與國際工程投標能力,並借鑒國外招標采購制度,加快我國招投標管理體制的建立和完善。
  4. This paper analyzes various technical and economic characteristics and technologic calculations for gas transmission pipeline, and takes luojiazai depurative gas transmission pipeline as an example, introduces the technical and economic comparison of desiccation projects in detail and proposes a feasible dehydration and desiccation technical project

    摘要分析了各種天然氣管道乾燥方法的技術經濟特點及工藝計算方法,以羅家寨凈化氣外輸管道為例,介紹了其脫水乾燥方案的技術經濟比選,提出了切實可行的脫水乾燥技術方案。
  5. A drive method of unequalized clock counter in panel display which uses no dissimilarity @ subclass to achieve precision unequalized clock counter correction based on functions approximation theory is proposed. the new method is acquired based on the particular analysis results of the display drive design projects which adopted counter drive method in which the balance between the display image quality and the cost of drive circuit is given. finally, synthesis comparison examples are given

    針對目前以該方法為基礎普遍採用的不同技術方案進行詳盡的分析,根據分析的結果闡明了其在圖像顯示質量和驅動代價方面的優缺點,在此基礎上基於函數逼近理論提出了一種平板顯示器計數器非均勻時鐘驅動方法,該方法在計數器時鐘上採用非相異子集完成高精度的非均勻時鐘計數器校正。
  6. This paper outlines the design and construction conditions of the yangtze estuary deepwater channel regulation project, describes the comparison and selection of the design schemes for the 1st & 2nd phase projects, and expounds the construction organization and administration, the core of which is dynamic management

    摘要全面介紹長江口深水航道治理工程整治建築物工程和疏浚工程的設計條件和施工條件,並在此基礎上介紹一、二期工程設計方案的優選情況,以及工程實施過程中以動態管理為主要內容的施工組織管理情況。
  7. A comparison of the school projects under pwsc 2001 - 02 33, 34 35 against such typical figures

    Pwsc 2001 - 02 33 34和35號文件所載建校計劃的有關百分數與上述一般百分數的比較
  8. A comparison of the school projects under pwsc ( 2001 - 02 ) 33, 34 & 35 against such typical figures

    Pwsc ( 2001 - 02 ) 33 、 34和35號文件所載建校計劃的有關百分數與上述一般百分數的比較;
  9. Firstly, it designs the structure and functions of the system by the systematic analysis of the design work of the comparison of railway location projects. then, by analyzing the data involved in scrlid, the management of synthesis data in the design environment are proposed and implemented. finally, according to the conventional flow of the scrlid, the development of the subsystem of interactive design for railway location has been implemented

    本文主要完成了以下幾個方面的工作:以系統的觀點對線路方案比選工作做了詳細分析,設計了本系統的結構和功能;通過對線路方案比選過程中所涉及數據的分析,提出並實現了對線路方案比選綜合數據的管理;通過對線路方案設計過程的分析,完成了互動式線路方案設計子系統的開發。
  10. For details, the main contents are as follow : 1. the research is conducted on the confecting method of steel - slag concrete by indoor experiment. through comparison of the physical and mechanical properties between steel - slag concrete and plain concrete, it can analyze the advantages of using steel - slag concrete. based on the test results, empirical formulae is developed, which provides some bases for practical projects

    通過試驗研究了廢鋼渣作為原材料配製混凝土的方法,並將鋼渣混凝土與普通混凝土在配製過程中的某些性質指標作了比較,分析了其原因,並在試驗的基礎上建立了強度與灰水比經驗公式,為工程設計提供了依據。
  11. By virtue of the design features of the mania dam, this paper studies the dynamic characteristics of the dam materials. by comparison with other similar projects, it presents a curve for dynamic characteristics of clay core materials and rockfill materials, makes analysis on the dam ' s plane dynamic response by finite element method, calculates the dam ' s seismic acceleration, the dynamic shear stress of the rockfill, and the dynamic stress of the cutoff wall in the overburden layer

    本文針對滿拉土心墻堆石壩的設計特點,進行了築壩材料動力特性試驗研究,通過與相關工程對比給出了心墻料和堆石料的動力特性曲線,採用有限元方法進行了大壩平面動力反應分析,計算了大壩的地震加速度、堆石體動剪應力及覆蓋層防滲墻的動應力。
  12. The formation of jinma bridge, projects comparison, new design method and calculation both on static and dynamic and the detail problems were presented in this paper in order to investigate this new structure and analyze the detail problems of this design. the main contents and the final conclusions of this thesis are as follows : 1

    為了研究這種新型橋梁的結構形式,並對結構設計中一些問題做深入地分析,本文對金馬大橋的方案比選、設計思路、協作體系結構的形成過程、結構的靜力、動力計算以及局部構造等方面進行了全面地分析研究。
  13. At the same time, the uniqueness of the back - analyzed parameters is discussed. correctness and suitability are proved by the comparison the calculated with observed results through the practical foundation pit projects with different retaining structures

    通過對不同支護形式(無支撐、單道支撐、多道支撐)的實際基坑工程的計算與廣東工業大學工學碩士學位論文監測結果的比較,驗證了本文方法的正確性和適應性。
分享友人