comparison of schemes 中文意思是什麼

comparison of schemes 解釋
方案比較
  • comparison : n. 1. 比較,對照;類似。2. 【語法】比較法;【修辭學】比喻。
  • of : OF =Old French 古法語。
  • schemes : 驚世陰險
  1. Comparison of cooling schemes for air cooled chiller

    風冷冷水機組全年供冷方案的比較
  2. The gravity analysis is carried out especially for the synthetic fused silica and calcium fluoride used in 193nm lithographic objective as well as the optical elements with structural sizes of ( 200mm ~ ( 300mm. large numbers of analysis data for surface shape error are obtained by using algor finite element analysis software. then these data are plotted into curves and comparison analysis will be carried out, finally the measures and schemes for reducing gravity deformation are proposed

    因此,本論文重點對大口徑光學系統在高精度光學鏡頭裝校中,因重力變形進行了詳細的分析研究,特別針對193nm光刻物鏡系統所使用的材料sytheticfusedsilica和caleiumfluoride以及用到的結構尺寸200mm ~ 300mm光學零件進行了重力變形分析,使用algor有限元分析軟體獲得了大量的面形誤差分析數據,然後將這些數據繪成曲線進行對比分析,最後提出了減小重力變形的措施與方案,並進行了實驗,驗證了分析結果是正確的,減小重力變形的方法是有效的。
  3. Comparison on cold source schemes of central air - conditioning in one hotel of shaoxing district

    武漢地區集中空調系統節能對策的探討
  4. Comparison and selection of schemes of construction of sunken tunnel tubes in drydocks

    模型在日照港總平面設計方案可行性研究中的應用
  5. A 2 - d hydrodynamic - numerical model was applied to typical rocky rapids called jiyutan by comparing different computational models. based on the comparison of different schemes, the change of the discharge and the flow current in a branch were analyzed, and the relationship between the flow condition and excavation area, scope as well as mode was discussed, the conclusions show : ( 1 ) in a branching rocky rapids, the velocity may be reduced and flow condition can be improved by excavating one channel partly

    本文在對各種數學模型比較的基礎上,應用二維水動力數學模型研究典型石質汊流灘? ?廣西潯江鯽魚灘航道整治工程方案,通過各方案計算結果比較,分析了不同汊道的開挖及汊道內不同開挖面積、開挖范圍以及開挖方式所引起的分流比及工程區域航道水力條件的變化規律,研究結果表明: ( 1 )對于石質汊流灘來說,在某一汊道通過局部開挖河槽,擴大過水斷面面積,可以達到降低工程段流速、改善局部水流條件的目的。
  6. It mainly include theory introduction and development status of container crane ' s electrical control speed adjustment system, technical advantages of full frequency control speed adjustment system, and the usage condition of large - size container crane ' s electrical control system by our national port machinery industry, represented by shanghai port machinery plant. the third chapter of this article introduces the choosing methods of crane electrical transmission schemes, comparison of common used electrical speed adjustment schemes, the application of the frequency control speed adjustment on port machines, etc. the fourth chapter of this article gives an investigation about the principle and implement method of on - vehicle and remote management system on large - size container crane

    主要包括集裝箱起重機電控調速系統的原理簡介以及發展狀況、全變頻調速系統的技術優勢、以及以上海港口機械製造廠為代表的我國港口機械行業在大型集裝箱起重機電控系統的使用情況;本文的第三章重點介紹了起重機電氣傳動方案的選擇方法、常用電氣調速方案的比較、變頻調速在港口起重機上的應用等。
  7. In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data

    為得出適合本段工程的最佳施工路線,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、水平旋噴長度、臺階長度及crd工法施工的c 、 d部相錯長度進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個施工方案的三維有限元動態施工模擬,得出了較優的施工方案,並利用施工后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方的煤氣管線的安全性進行了分析,得出了利用此施工方案施工不會造成此處煤氣管線破壞的結論。
  8. The application and existing condition of explosion proof air conditioning unit made in china are introduced and comparison of technical economy situations in different schemes is given

    敘述了汞的理化特性、制燈對汞材的要求及目前制燈用汞存在的問題,提出了高純汞制備新工藝,並實施真空封裝,提高了燈管的內外在質量
  9. Comparison of class systems between china and us medical schemes

    中國和美國著名醫學類表類目體系的比較研究
  10. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  11. Comparison of air - conditioning refrigeration schemes for an intelligent building

    某智能大廈空調系統冷源方案比較
  12. Comparison of coldness and heat fountain schemes for air conditioner in

    項目空調冷熱源方案比較
  13. In light of the special natural conditions and project layout characteristics of xiangjiaba hydropower station, a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout, late - stage flood control, navigation during the construction, and the construction period before the commissioning of the first hydropower generating unit

    摘要針對向家壩水電站特殊的自然條件和工程布置特點,其施工導流經過對多個方案進行比較,從施工布置、後期度汛、施工期通航、發電工期等方面考慮,選擇了第一期圍左岸、第二期圍右岸的分期導流方案。
  14. The structure, working mechanism, design schemes, calculation methods and performance testing of small and medium - sized under - bin vibrating feeders are presented. improvement measures are suggestod on the basis of the comparison of several under - bin feeding devices

    介紹了中小型倉底振動給料機結構和工作原理,以及設計方案、計算方法和性能測試;對幾種倉底給料裝置進行了比較,並提出了改進措施。
  15. Simulation and experimental results in that the novel converter is feasible. through the comparison of three schemes, the novel zvs isolated boost converter is the best dc link topology of the modulariation aviation static converter

    通過對三種電路方案的比較,最後確定新型隔離型zvsboost電路是模板化航空靜止變流器直流環節的最佳拓撲方案。
  16. The technical and economic evaluation of thin - type spunbond nonwoven project has mainly finished the following research work : ( 1 ) utilize the theory and method of < marketing > for market investigation, research and forecast, analyze the developing trend and market requirement of the nonwocen abroad and at home, conduct quantitative forecast for raw materials and product price, and explain that during the essential period when liaoyang petrochemical company regulates the structure of industries and product and remodels the main business items, selecting to build up the production device for thin - type spunbond nonwoven is suitable. ( 2 ) introduce techniques of different companies to form different schemes. after analyzing the features of various schemes in the thesis, through building up the target system of four levels and utilize technical comprehensive evaluating way to conduct technical evaluation of four schemes for the thin - type spunbond nonwoven project and get the prior sequence from schemes d, b, a to c. ( 3 ) different technical schemes have various cash circulation amounts, economic evaluation is first based on evaluating and confirming feasibility of each scheme by the single scheme finance, select and use the method of multiple schemes comparison selecting - inutual repelling type multiple schemes optimization, select introducing the scheme of d company technique as the optimum, then conduct undetermined analysis to further test and verify feasibility of schemes

    闡明了遼化公司在調整產業結構和產品結構、重塑主營業務的關鍵時期選擇建設8000噸年薄型紡粘非織造布生產裝置是適宜的; ( 2 )引進不同公司的技術形成了不同的方案,論文在分析了各方案的特點后,通過建立四個層次的指標體系,運用技術綜合評價的方法,對薄型紡粘非織造布項目的四個方案進行技術評價,確定了丁方案、乙方案、甲方案到丙方案的優先順序; ( 3 )不同的技術方案有不同的現金流量,經濟評價首先在單方案財務評價確認各方案可行的基礎上,選用多方案比選? ?互斥型多方案選優的方法,選擇引進丁公司技術的方案最優,而後,又進行了不確定性分析,進一步驗證方案的可行性。
  17. Numerical comparison of fifth - order weno schemes and second - order godunov schemes

    的數值測試與定量比較
  18. The article advanced technology schemes on cooperation of heating and power and cooling of natural gas in one residential area of nanjing, schemes choose three different equipment unit, and fix on design index base on the actual demand of cold and heat and most capability of gas turbine of two scheme, the article analysis on technical and economic performance, comparison of technical and economic performance on different equipment unit and different scheme

    摘要針對南京某一居民小區,進行了天然氣熱電冷聯產方案設計,選取了3套熱力設備,並按實際冷熱需求和燃機最大能力兩種設計方法確定了設計指標,進行了技術經濟性能的計算和分析,對比不同熱力設備的技術經濟性能和各方案的優缺點。
  19. The evaluation in this paper is quite correct and impersonal. ( 2 ) this paper also presents two schemes of the alternation project and gives detailed comparison of the two schemes

    針對其行業特點和技術改造的特點展開了詳細的調研和市場預測,使評價過程基本避免了主觀傾向性的錯誤和偏差。
  20. Comparison of air - conditioning refrigeration schemes between air - cooling unit and water - cooling unit

    風冷與水冷製冷方案的比較
分享友人