completion damage 中文意思是什麼

completion damage 解釋
完井損害
  • completion : n. 1. 成就,完成,實現;【數學】求全法。2. 期滿;畢業。
  • damage : n 1 損害,損傷;〈口語〉傷害,毀壞。2 〈口語〉費用,代價。3 〈pl 〉 【法律】 賠償損失;賠償金。vt...
  1. This product possesses good properties in cleaning, permeation, oil suspension and oil - water separation with good compatibility with completion fluid. in addition, it only causes little damage to the environment

    該產品具有良好的清洗、油污懸浮、油水相分離能力,並與完井液有良好的配伍性,對環境污染小。
  2. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  3. Construct the light well point pipe after completion the east two - line side piling, to prevent the pipe movement or damage by soil pressure during piling

    輕型井點管應在東側的兩排邊樁施工完畢後方可施工,防止壓樁過程中,土的擠壓力使井管位移或損壞井管
  4. Jwy is a new generation of intensive completion pipe string cleaning agent. it possesses the good property in cleaning, oil contaminant suspension and oil - water separation with little damage to the environment

    Jwy完井管柱清洗劑是新一代強力清洗劑,具有良好的清洗、油污懸浮、油水相分離能力,對環境污染小。
  5. Abstract : under - balanced drilling ( ubd ) technology has beenwidely used in oil drilling to improve oil recovery, minimize formation damage and eliminate drillingtroubles, while completion fluid technology is one ofthe key technologies

    文摘:欠平衡鉆井完井技術是保護油氣層、提高採收率、克服各種鉆井復雜問題的重要技術措施。
  6. The basic uneven settlement problem were controlled well, also the anti - liquefied problem of sand layer nearly was solved in this plan. when increasing the basic gravity after the project completion, the proportional lowering of seepage damage of sand in overburden foundation are greatly improved

    基礎不均勻沉降問題也能得到較好控制,防砂層液化問題也基本解決,在工程完建后增加基礎壓重的情況下,覆蓋層基礎中砂層的滲透破壞坡降也大大提高。
分享友人