completion time 中文意思是什麼
completion time
解釋
完工時間- completion : n. 1. 成就,完成,實現;【數學】求全法。2. 期滿;畢業。
- time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
-
A dynamic task allocation mechanism is presented which reduces communication traffic and resolves the problem of task deadlock on the basis of shortening task completion time
提出了一種動態任務分配機制,在縮短任務完成時間的基礎上減少了系統通信量並解決了任務死鎖問題。 -
In 1978, an algorithm for minimizing total weighted completion time with a series - parallel precedence was given by lawler
1978年lawler給出當任務間的優先約束關系為串並有向圖時,加權總完工時間問題的演算法。 -
We show that under the consideration of discounted factor, jobs in the p - maximal initial set / * of module m should be processed prior to other jobs in module m, and the schedule is the optimal if the jobs in i * are n ' t be preempted by the jobs in n i *. this result is a extension of lawler ' s method for minimizing total weighted completion time with a series - parallel precedence
證明了在考慮折扣因子的條件下,模塊m的因子最大初始集合i中的任務優先於模塊m中的其他任務,並且被連續加工所得的排序為最優排序:該結果推廣了lawler用來求解約束為串並有向圖的單機加權總完工時間問題的由底向上搜索分解樹的方法。 -
The objectives are to minimize a linear function of total completion time and total variation of completion time, a linear function of total waiting time and total variation of waiting time, a cost function based on earliness, tardiness, window size, window location, and a linear function of the due date, the earliness and tardiness for all jobs
目標函數分別為極小化完工時間和與完工時間偏差和的線性組合,極小化等待時問和與等待時間偏差和的線性組合,極小化提前時間、延誤時間、最早交貨期及窗口長度的加權和,極小化提前時間、延誤時間及公共工期的加權和。 -
Completion time of the collective communication operation is optimal in the grid environment. in this paper, we gave an example about broadcast, analyzed and compared a topology - unaware broadcast algorithm ( e. g. a binomial tree broadcast ), a two - level topology - aware broadcast ( e. g
在這篇論文中,我們以廣播通信為例,分析比較了未知拓撲型的廣播演算法,兩層的已知拓撲型廣播演算法(例如ma吵人以及多層的已知拓撲型廣播演算法(例如mh0十02l並重點研究了網格環境下的多層已知拓撲型廣播演算法。 -
However, to minimize the maximum completion time for the wafer probing scheduling problem ( wpsp ) is very important for equally utilizing the capacity of parallel - machine, while satisfying the requirements of product types, product family, sequence dependent setup time, product - type dependent processing time, due dates of jobs, and capacities of machines
然而求解晶圓針測排程問題最大完工時間的最小化以均勻的利用平行機臺的產能是非常重要的,該問題尚考慮以下的問題特性:產品別與產品族、順序相依設置時間、決定於產品別的工作處理時間、工作交期與機臺產能限制等。 -
Semi on - line scheduling problem for maximizing the minimum machine completion time on m identical machines
臺同型機極大化最小機器負載的半在線問題 -
The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory
初步探討了以下幾方面的應用: 1 )用隸屬度劃分金剛石鉆進「打滑」地層; 2 )綜合評判在金剛石鉆頭評價、巖石可鉆性分級及鉆探造漿粘土評價中的應用; 3 )用模糊聚類分析進行「硬巖石」分類; 4 )用模糊數進行鉆孔竣工時間預估及地下水質評價; 5 )模糊模式識別在新礦區類型識別和最佳水源地選擇中的應用; 6 )模糊相似選擇及其改進演算法在金剛石鉆頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水量預測中的應用; 8 )優化理論模型在金剛石鉆頭和深基坑支護方案綜合評價中的應用。 -
A completion time algorithm for the multiproduct batch scheduling problem in mixed intermediate storage ( mis ) policy is proposed. the transfer time, sequence - dependent setup time of equipment, and the effect of double transferring are considered in the algorithm
提出了混合中間存儲策略下多產品間歇生產過程調度問題的一種完成時間演算法,該演算法考慮了產品傳輸時間,與產品生產順序有關的設備準備時間,中間存儲清洗時間以及中間存儲「雙傳輸」對完成時間的影響。 -
If the completion time is actually similar, the short - term advantage of building the lng terminal at soko is greatly diminished
若兩者的竣工時間相約,在大鴉洲興建液化天然氣接收站的短期優勢隨即消失。 -
Based on this completion time algorithm, the aco _ stag and aco _ norm algorithms are applied for the optimal scheduling of multiproduct batch processes
採用aconorm和acostag演算法用於解決多產品間歇生產過程的優化調度問題。 -
Single - machine scheduling with maintenance to minimize the total weighted completion time
目標函數為加權完成時間和的單機維護調度問題研究 -
The problem of scheduling jobs with non - identical sizes on parallel batching machines is considered ; the objective is to minimize the maximum completion time ( makespan )
摘要考慮并行批加工機上不同尺寸工件的調度問題;目標是極小化最大完工時間。 -
Minimizing total completion time of orders with multiple job classes
崇明上實現代園區農業生態環境評價 -
Given that the black point reclamation is small, and could probably be reduced, wwf questions whether the completion time for building the lng terminal adjacent to the black point gas - fired power station would really be significantly slower than building the terminal at a remote island site with no road access, in addition to a 38 km pipeline
鑒于鼓灘的填海范圍細小,而且更有縮減的空間,本會質疑在現有的天然氣發電廠旁興建天然氣接收站的工程,是否真的會比在無路可達的荒島上進行同樣工程,兼另建一條38公里長的輸氣管緩慢得多。 -
Measure call completion time ( post dial delay )
測量呼叫完成時間(撥號延遲之後) 。 -
A commentary summary of studies on the completion time of er ya and its author
的成書時代和作者問題研究評述 -
The arithmetic of the average completion time based on stochastic petri nets
網的產品任務平均完成時間演算法研究 -
Inverse scheduling problem on a single machine stochastic scheduling to minimize the total completion time
單臺機器總完工時間隨機排序問題的反問題 -
Patients had a median of two blocks and the median completion time for the blocks was nine minutes
病人平均需要兩次麻醉,麻醉的平均起效時間為9分鐘。
分享友人