complex foundation 中文意思是什麼

complex foundation 解釋
復雜地基
  • complex : adj 1 復雜的,錯綜的。2 合成的,綜合的;【化學】絡合的。3 【語法】復合的;含有從屬子句的。n 1 復...
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  1. The article is based on nation nature science foundation of china, " biogeochemical cycling of pollutants in complex environments of tidal flats in the yangtze estuary " ( no. 40131020 ). the author chose open tidal flat of dong tang chongming yangtze estuary as research object and set up typical section plane so that under the good condition, the author measured hydrology element, total nitrogen and total phosphor index

    本文依託國家自然科學基金重點項目「長江口濱岸潮灘復雜環境條件下物質循環研究」 (批準號: 40131020 ) ,選擇了長江口崇明東灘敞開型潮灘為研究對象,設置典型斷面,在平靜天氣條件下,實測了水文、地球化學要素,獲得了水位、流向、流速、 tn及tp等指標6000多個實測數據,著重對長江口潮灘水動力過程、 tn和tp的動力輸移過程進行研究。
  2. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  3. With the developing of vlsi in recent years, high function dsp has been produced ( such as tms320 series dsp produced by ti ) and their cost is dropping. thus, this established the foundation for making complex speech coder practical and producible. the paper researched and discussed the fix - point real implementation of g. 728 by dsp tms320c5402 chip

    但是,近幾年來,隨著大規模集成電路( vlsi )的發展,已生產出高性能數字信號處理晶元(例如ti的tms320系列dsp晶元) ,而且其成本在不斷降低,這就為復雜的語音編碼器的實用化和產品化奠定了基礎。
  4. The characteristics of high pressure gyratory sprayed pumping discusses is presented, which is applicable in wide range of scope and ground layers, convenient for construction, long durability, wide source of materials. mechanism for subgrade strengthening : complex foundation of cement solid and earth between piles was formed by pulsant load of flowing pressure and spraying flow, water wallop, cavitation phenomenon, water wedge effect, extrusion force and air flow agitation etc so as to enhance foundation bearing force and reduce settlement and deformation

    高壓旋噴注漿技術具有適用范圍、適用地層較廣,施工方便,耐久性好,材料廣闊等特點;其加固地基機理主要是通過流動壓、噴射流的脈動負荷、水塊的沖擊力、空穴現象、水楔效應、擠壓力、氣流攪動等效應形成水泥固結體與樁間土的復合地基,從而提高地基承載力,減少沉降變形。
  5. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋鉆孔壓灌混凝土成樁技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成孔困難的問題,適應地質條件范圍廣,成樁速度較快,工期短、工效高;與復合地基成樁時的泥漿護壁成孔工藝、振沖樁工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入鉆桿內的混凝土為泵送免振混凝土,因此樁體質量易於保證;與泥漿護壁和干作業成孔工藝相比,螺旋鉆孔壓灌混凝土成樁的側阻和端阻都有相應的提高,樁的承載性能較好,復合地基的變形較小。
  6. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。
  7. Supporting system of foundation pit for a complex building in beijing

    中國石油工程公司綜合樓工程基坑支護的設計與監測
  8. Deep foundation shoring monitor and urgent remedy for a complex building in nanjing

    南京市某綜合樓深基坑支護安全監測與搶險
  9. Informationized construction and emergency repair of a complex building ' s deep foundation pit

    南京市某綜合樓深基坑支護的搶險
  10. The research reveals that in the complex foundation, the application of screw drill press concrete stake technology is feasible. it has notable effects in reducing the sedimentation of the complex foundation, ensuring the stake quality of the basic stake, improving the weight bearing capacity, saving costs, and cutting time limit

    研究表明,螺旋鉆孔壓灌混凝土成樁技術在復合地基中的應用是可行的,它在減小復合地基的沉降量,保證基樁的成樁質量,提高承載力,節約工程造價,縮短工期等方面均有顯著作用。
  11. In the resent years, our state invests much for important engineering projects, irrigation works, expressway, underground and so on. as huge engineerings deal with complex foundation condition, there are often poor foundation, and because the engineerings are very important, the their request for stress is more rigorous than common ones

    近幾年,國家投資建設了許多重要工程,水利水電工程,高速公路,地鐵工程等等,由於大型工程涉及的地質條件會復雜些,往往會遇到軟弱地基,由於工程的重要性,對于變形的控制要比一般工程嚴格一些。
  12. When the foundation and the intake tower are both important analytical objects, and the geological condition of foundation is very complex, the slope is meshed with tetrahedral element, while the intake tower is meshed with hexahedral element

    本文針對百色水電站的地基和進水塔均是主要分析對象,而地基的地質條件十分復雜,提出了非一致網格位移協調解法。地基採用四面體單元和進水塔採用六面體單元。
  13. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  14. The thesis retrospects some primary management theories and ideas of reference value, and definition of complex system is introduced ; also the conception, theoretical foundation and method of cas are reviewed ; and description of adaptive agents, the seven basic points and main characteristics of cas are systematically introduced

    回顧了對本研究有借鑒價值的主要管理理論、管理思想,並介紹了復雜系統理論的定義,系統地回顧了cas的概念、理論基礎和方法,並概括了cas理論的7個基本點和主要特點,把適應性分子進化模型及其相關理論引入到了復雜適應系統。
  15. In the 5th chapter, aiming at the case part of complex structure, the information description method based on foundation - structure - unit and azimuth - structure - unit - tree is presented, and hierarchical information model of case part is defined

    第五章針對復雜結構的箱體類零件,建立了基礎結構單元與方位結構單元樹信息描述方法,定義了層次結構的箱體零件信息模型。
  16. In addition, some references and suggestions on choosing design parameters of screw drill press concrete stake in complex foundation have been provided in this research

    另外,本次研究對復合地基中螺旋鉆孔壓灌混凝土樁的設計參數的選取提供了參考和建議。
  17. Based on the screw drill press concrete stake technology, via the practical application of this technology in complex foundation form stake, this thesis goes deeply into the screw drill press concrete stake equipment and technology parameter in complex foundation, the weight bearing of the formed stake, the factors that affect the stake quality, and its practical application in the project and its social and economic benefits

    本次研究是在螺旋鉆孔壓灌混凝土成樁技術的基礎上,通過該技術在復合地基成樁中的具體應用,對復合地基中螺旋鉆孔壓灌混凝土樁的成樁設備及工藝參數、成樁后樁體的承載性狀、影響成樁質量的因素及該技術在工程中的具體應用和社會經濟效益等問題進行了研究。
  18. The visualization theory and parameterization technique for fem, and secondary developing technique for ansys were studied. the parameterization principle for fem modeling of arch dam and the implementation technique were introduced. by fully using of the powerful graphic functions of autocad and of the secondary developing techniques provided in ansys, such as uidl, apdl etc, a fem simulation analysis system of arch dam based on ansys was developed, by means of which arch dams on complex foundation can be modeled and analyzed conveniently

    首先,研究了有限元中的可視化理論、參數化技術和ansys軟體的二次開發技術,介紹了拱壩有限元可視化建模的參數化原理和實施技術,以ansys為平臺,並結合autocad軟體強大的圖形處理功能,利用ansys提供的uidl 、 apdl等二次開發技術,開發了具有水工特色的拱壩模擬分析系統,利用它可較方便地對復雜地基上的拱壩進行有限元建模和模擬分析。
  19. The complex foundation of the rigid pile coexisted with the flexible pile is a new technical way of the foundation bed treatment and it is a studying hot point for the academic and engineer circles about this aspect

    摘要剛性樁與柔性樁共同作用的復合地基是一項新的地基處理技術,是現在學術界和工程界研究的熱點。
  20. Reliability : combined with actual examples of gyratory sprayed piles and complex foundation piles this chapter describes selection of gyratory sprayed pumping, scope, spraying materials, determination of gyratory spraying parameters, quality inspection and detailed construction process. based on the results the article summarizes settlement laws through analysis of ground base settlement observation materials and this shows that after treatment ground base settlement was reduced greatly and the method is effective

    本文結合工程實例分析了注漿以後形成的旋噴樁以及復合地基的力學特徵,然後對旋噴注漿方案的選擇、注漿邊界范圍、注漿材料、旋噴參數的確定、旋噴質量檢驗方法等具體施工過程進行了詳細描述,通過對工程處理后地基沉降觀測資料的分析,表明處理后地基沉降量有了明顯降低,說明該方法在控制沉降方面非常有效。
分享友人