concrete piers 中文意思是什麼

concrete piers 解釋
混凝土基墩
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • piers : 扶垛
  1. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角度進行了初步研究: 1 、縱槽向抗震性能分析1 )湯峪河吊桿拱支承結構的縱槽向地震效應較小;吊桿式拱架結構動力特性取決于槽墩和主拱圈的剛度,以及結構的整體性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建築高度和重心,在構件連接和變截面處增設梗脅,按照約束混凝土的要求來加強箍筋的配置,增加砼的延性,以克服地震時構件連接和變截面處的應力集中造成的坡壞,並吸收大量的地震能量,從而起到隔震,減震的效果。
  2. Summarizing the conclusions of computation in available literatures and analyzing synthetically actual experimental data, the paper established an interaction model of beam and rail, and by adopting fem and a program compiled by c + + language, this paper studied and calculated the rupture forces in the continuously welded rails ( cwr ) on a specially - designed simply - supported reinforced concrete bridge, and the distribution of rupture forces in rails as well as the law of their transmission to bridge piers and abutments

    摘要在總結已有文獻計算結論的基礎上,綜合分析實際測試數據,建立橋上無縫線路梁軌相互作用的力學模型,採用有限元方法和c + +語言編程,研究、計算特殊設計的混凝土簡支梁橋上無縫線路鋼軌斷軌力的分佈及其對橋梁墩臺的傳遞規律。
  3. This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field

    摘要主要研究了採用裝配式公路鋼橋桁架(通常稱為貝雷架)做為支架進行連續梁橋現澆箱梁混凝土的施工方法;研究了跨河施工支架的技術方案,特別是施工支架在橋墩上的剛性斜撐,同時結合現場試驗研究了施工支架的分析計算方法及變形。
  4. Custom - built boats, redundant piers and concrete fenders are used in building the artificial reefs

    人工魚礁的物料是特別建造的船隻、棄置碼頭和石屎防撞躉。
  5. This paper gives an account of the construction schemes of building artificial islands and sinking concrete cofferdams for shoal piers no. 53 and no. 59, and the construction schemes double - wall steel cofferdams for deep water piers no. 54 ~ 58 of hengyang xiangjiang river bridge on wuhan - guangzhou passenger dedicated railway

    摘要介紹武廣客運專線衡陽湘江特大橋53號、 59號淺灘墩採用的築島、下沉混凝土圍堰施工方案,以及54 ~ 58號深水水中墩採用的雙壁鋼結構圍堰施工方案。
  6. Study on impact coefficient of braking force for gravity piers of railway bridges with simple supported concrete beams

    重力式橋墩混凝土簡支梁橋制動力沖擊系數研究
  7. This paper aims at bridge with high pier and long span adopting single or double featheredge piers, the stability of bridge in the whole construction process is analyzed combined with research conclusion of bridge stability and concrete creep and shrinkage, bridge construction period is divided according to actual construction - process and concrete creep and shrinkage regularity and structure is analyzed as plane truss at each time increment

    本文針對常用單、雙薄壁墩的高墩大跨徑橋梁,結合國內外對橋梁結構穩定與混凝土徐變收縮的研究成果,對節段法施工的橋梁進行穩定性全過程分析方法研究。根據實際施工過程及混凝土徐變收縮規律對施工全過程劃分時段,對每個具體計算時刻採用平面桿系結構進行計算分析,不同計算時刻具有不同的結構體系。
  8. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍堰與鉆孔樁相結合的復合基礎。
分享友人