concrete pile driving 中文意思是什麼

concrete pile driving 解釋
打混凝土樁
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  • driving : adj. 1. 推動的,起推動作用的。2. 【機械工程】傳動的;主動的。3. 猛沖的。4. 精力充沛的,有上進心的;(監工等對工人)苛刻的。5. 駕駛的,操縱的。
  1. The experiential formula between kc and base resistance q from cpt and, the relationship between ke and c # ( strength of concrete ) are also created by fitting 94 pressed pile testing date. based on analyzing the compacting effects caused by driving pile in loess and it ' s influence on bearing capacity and settlement, another two disturbance parameters, c and e, are proposed for multiplying respectively the parameters of soil cohesive c and deformation modulus es to reflect this effect. by fitting 51 driven pile testing date, we created an experiential formula between the e and r ( the modulus ratio between pile and surrounding soil ), also an experiential formula between the c and base friction resistance fs / pa from cpt of pile surrounding soil

    在本文中分析了靜壓樁的沉樁擠土效應對其承載力與沉降特性的影響,在計算模型中引入了樁周土粘聚力c的修正系數k _ c和樁周土變形模量e _ s的修正系數k _ e來體現這種影響,通過對94根靜壓樁試樁資料進行擬合,建立了k _ c與樁端土靜力觸探的端阻q _ c之間經驗公式以及k _ e與c # (混凝土標號)之間的對應關系。
  2. Based on the analysis of the inadequacy of the lifting capacity of piling barge in large - diameter prestressed concrete pipe pile driving construction, the measure of applying buoyancy generated by cavity drainage to remedy the inadequacy is put forward

    摘要針對混凝土大直徑管樁沉樁施工時打樁船吊裝能力存在不足的問題進行了分析,提出了利用管樁空腔排水產生的浮托力來彌補的措施。
  3. The main causes of breakage were concrete tube pile instability of foundation pit or failure of its bracing, soil squeeze due to pile driving, incorrect excavation and incorrect heap of soil

    摘要造成混凝土管樁傾斜與斷裂的主要原因為基坑邊坡失穩或支護結構破壞、沉樁擠土效應以及挖土與堆土不當等。
分享友人