concrete pillar 中文意思是什麼

concrete pillar 解釋
混凝土標石
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • pillar : n 1 柱;紀念柱;(柱)墩,柱腳;【礦物】(礦井中硬炭層或巖石形成的)礦柱,煤柱。2 柱狀物〈水柱,...
  1. Crack - control of aeolotropic hollow slabs in orthogonal in - site concreting deck floors in the construction of large - pillar - net structure of reinforced concrete

    大柱網現澆混凝土框架正交異性空心大板樓蓋的裂縫控制
  2. Considering the special structure of multi - ribbed slab, founding diphase body mechanical model of compound material, strengthening rib beam and rib pillar by equivalent volume ratio of concrete and slice brick, the paper drew elastic compution constant and shear constant. based on the things, the paper simplified isotropy compution model to wall, gave practical design formula of elastic mold and shear mold, provided necessary parameter for practical design formula of elastic rigidity. finally the calculating results agree well with the text results

    結合密肋復合墻板的特殊構造,建立墻板的復合材料二相體力學模型,按照混凝土與砌塊體積比不變原則對肋梁肋柱同時加強,得出墻板的彈性計算常數及剪切常數,在此基礎上,進一步將墻板簡化為各向同性的計算模型,給出墻板彈性模量及剪切模量實用計算公式,為密肋復合墻板的實用彈性剛度計算公式提供必要的參數。
  3. The stress distribution of the back bearing pillar in blasting demolishing reinforced concrete frame structures

    鋼筋混凝土框架爆破拆除時后承重柱的應力分佈
  4. For meeting the related nantional standards and avoiding demolishment of the building, the underpinning and strengthening methods are used, with which the loads of center column are underpined by the diagonal steel strut and the cross - sectional areas of side pillar are strengthened, both ends of shear wall are chiseled in turn and then concrete is poured again

    通過採用斜向鋼支撐荷載轉移法實現對中柱的托換,採用剪力墻兩端分批鑿除后再澆搗實現對剪力墻的托換,採用增加截面法對邊柱進行加固,使建築物經托換和加固后能滿足國家有關規范的要求。
  5. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  6. A valve box, a valve pillar and a water meter basin shall be of cast iron, synthetic resin, and concrete, etc

    閥門箱,閥門柱和水表井應由鑄鐵,合成樹脂和混凝土等構成。
  7. She was thrown down at the foot of a concrete pillar, eyes closed

    她被留在混凝土石柱底下,雙眼緊閉
  8. Prestressing technic and control of barbed wire steel bar concrete pillar

    刺線網鋼筋混凝土柱預制工藝及質量控制
  9. Practice of consolidating the fractured zone in the permanent pillar by steel reinforced concrete shear hole

    鋼筋混凝土剪力洞加固永久礦柱中破碎帶的實踐
  10. On the other hand, we have imitated the pillar and taken the finite element method to simulating it. as a result, dynamic function of steel fiber polymer concrete pillar is obviously better than cast iron, and static function better than polymer concrete

    並對這種配比的鋼纖維聚合物混凝土立柱進行模擬分析,結果表明用該種材料製作機床基礎件其動態性能明顯優于鑄鐵,而且靜態性能優于聚合物混凝土。
  11. The prestressed concrete floodgate pillar may simplify the structure of buildings, to shorten the use of steel largely and to make the construction conveniently, therefore it is used more and more popularly

    摘要預應力混凝土閘墩可以簡化建築物結構、節省大量鋼筋和方便施工,因此被越來越多地採用。
分享友人