conduit system 中文意思是什麼

conduit system 解釋
(電車的)地下電線[管道]系統;(電燈的)暗線裝置[系統]。

  • conduit : n. 導管 (=conduit pipe);水管,水道,溝渠,暗渠;【電學】導線管,管道(電纜)。
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  2. Clamp connecting conduit and accessories for air system

    空氣系統導管與附件連接卡箍
  3. Specification for clamp connecting conduit in air system

    空氣導管連接快卸卡箍通用規范
  4. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  5. The transient simulation of power system uses usually simplified models of conduit system and hydro turbine. similarly the simplified models of synchronous generator and power system are used in transient simulation of hydraulic system

    電力系統模擬往往採用粗略的輸水系統?水輪機模型,而水力系統模擬則往往採用粗略的同步電機?電力系統模型。
  6. Many of the buildings are of cement block construction and would have required extensive drilling or surface conduit installation for a hard - wired system

    校園內建築大多由水泥磚構建,如果採用傳統布線系統,需要進行大量的鉆孔和墻面導線管的鋪設。
  7. To the inferior trap of rock - bottom building, ought to want special attention the following problem : ( 1 ) notice indoor moistureproof design, the ground outside basically observing indoor ground is compared wants tall how many, moistureproof measure how, judge thereby, the building fights damp ability, whether to live aptly ; ( 2 ) notice indoor facilities is designed, conduit of indoor fluctuation catchment is reasonable, observe whether conduit distribution is equitable, expedite, jam not easily ; ( 3 ) notice the establishment outdoor is designed, whether is the system such as room of the raceway groove outside be like, cesspool, water pump, catchment designed reasonable, accessary establishment leaves living room whether too close, this basically is to prevent to be all round the building generation seeper, especially after big rainstorm, be like catchment not free, the excessive outside possible sewage, by water adj / lit wide

    對于底層房屋的劣質陷阱,應當要非凡注重以下問題: ( 1 )注重室內地面防潮設計,主要觀察室內地面比外地面要高多少,防潮措施如何,從而判定,房屋抗潮濕的能力,是否適宜居住; ( 2 )注重室內設施設計,室內上下排水管道是否合理,觀察管道布局是否合理,是否暢通,不易堵塞; ( 3 )注重室外設施設計,如外溝道、化糞池、水泵房、排水等系統是否設計合理,附屬設施離居住房是否太近,這主要是為了防止在房屋四周產生積水,非凡是大暴雨後,如排水不暢,有可能臟水外溢,被水淹。
  8. The main products became a shortlist of national pipeline bureau in 2000 ; passed through iso9001 - 2000 international standard quality system certification in 2001 ; ranked as recommended products by china petrol - chemical group and successively obtained physical market entrance permissions awarded by major oil fields within nationwide in 2002 ; audited to be a membership of china petroleum distribution corp. ( energy ahead ) in 2003 ; gained pressure conduit component manufacture license ( for products such as insulation joint, fast - opening blind, receiver & launcher, etc. ) awarded by the general administration of quality supervision, inspection and quarantine of the prc in 2004 ; and obtained pressure vessel manufacture license in 2005

    公司主要產品於2000年成為國家管道局入圍產品; 2001年通過了iso9001 - 2000國際標準質量體系認證; 2002年被中國石油化工集團列為推薦產品,並先後獲得國內各大油田的物質市場準入證; 2003年經審核成為中國石油銷售總公司(能源一號網)會員單位; 2004年遼寧省首家獲得(絕緣接頭、快開盲板、收發球筒有關產品)中華人民共和國質量監督檢驗檢疫總局頒發的壓力管道元件生產製造許可證; 2005年取得了壓力容器生產製造許可證。
  9. Central - mid - levels escalator and walkway system : opened in 1993, the central - mid - levels escalator and walkway system consists of covered walkways, 20 reversible one - way escalators and 3 travelators. it starts at des voeux road central, passes through narrow streets and ends at conduit road

    在1993年啟用的中環至半山自動扶梯系統,是由有蓋行人道、 20條可轉換方向的單向自動扶梯和3條自動行人道組成,以德輔道中為起點,貫穿中環多條狹窄的街道至干德道止。
  10. For many years after the series of banking crises in the eighties, the banking system has been serving as a reliable conduit for absorbing domestic as well as international savings, and channelling them to those who borrow funds

    年代一連串銀行風潮后,多年來已成為可靠的中介渠道,幫助吸納本地及國際儲蓄資金,然後中轉至需要融資者手中。市場競爭加劇,尤其放寬利率管制,更增加這方面的成效,使借款人受惠。
  11. But this system is vulnerable to becoming a conduit for worthless information that is passed on for no other reason than tradition

    然而,這一系統卻容易淪為傳輸無用信息之管道,這些信息僅因為屬于傳統慣例而被代代相傳。
  12. In order to resolve the question, in the thesis a simulation arithmetic of hydro - electrical system is put up. the equations of hydro - electrical system are divided to two parts, one of which consists of the differential equations of conduit system, hydro turbine and generator ' s rotator and is solved by characteristic equation arithmetic, the other of which consists of the differential equations of generator, magnetic system and grid and is solved by longge - kuta arithmetic or covert integrated arithmetic. through the alternative solving of the two parts, the simulation results of the large - disturbance transient could be abstained eventually

    為解決這一問題,本文提出了一種將水力系統和電力系統方程交替求解的水電系統聯合模擬演算法,即將包括輸水系統、水輪機以及機組轉子等部分的水力系統差分方程作為一部分,將包括同步發電機、勵磁系統以及電網等部分的電力系統微分方程或差分方程作為另一鄭州大學工學碩士論文部分,對前一部分採用特徵線法求解,對后一部分根據模型形式採用龍格一庫塔法或隱式積分法等演算法求解,這兩部分的求解過程交替進行,最終即可得到水電系統大擾動過程的模擬結果。
  13. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩水電站的設計方案,對水輪機調節系統,按長引水管道復雜引水系統、彈性水擊、調速器為pid調節規律,在小波動情況下,對包括引水道、調壓井、尾水管、水輪機、發電機、調速器在內的水輪機調節系統建立數學模型,並計及引水管道水力摩阻損失,對水輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。
  14. Research on water hammer with gas in pressure conduit system through physical experiments, researches on pressure conduit system with gas releasing and liquid column separating, which consist of observing flow patterns, testing the conditions under which liquid column separation brings into existence and the water hammer in water interception collision, and studying effects resulting from gas content and different water velocities in pipeline, was done

    3 、輸水管道系統中含氣水錘研究通過物理試驗,對有壓輸水管道系統中的氣體釋放與液柱分離進行了研究,觀察其流態、測試液柱分離發生的條件及斷流彌合水錘壓力,研究了含氣量、流速等參數對液柱分離的影響。
  15. The characteristics of compaction curves, the evolution of organic matter, the direction of migration and assignment, conduit system, fluid potential are studied it is concluded that the low maturity of the source of the eogene age is the main factor to control the entrapment. it controls the direction of the primary migration, confines the location of mature source rock and the special carrier rock, controls the time of expulsion and the amount of petroleum, therefore ; the effective traps should be near to oil kitchen and on the pathways of migration

    認為下第三系油灶的低熟是影響其運聚成藏的關鍵因素,生油巖低熟決定油氣初次排烴的方向指向沙三下段;生油巖低熟決定成熟生油巖分佈的局限性和輸導體的特殊性;生油巖低熟決定起排烴時間晚、生烴量不足,從而決定有效的圈閉應是近源的、在運移主路線上。
  16. The principal pipe or conduit in a system for conveying water, gas, oil, or other utility

    主要管道輸送水、天然氣、石油系統中的主要管道或溝渠或其他公用事業設備
  17. The method was applied to measure the hydraulic losses of inlet and outlet conduit of bulb tubular pump system of the pumping station respectively

    採用本文的方法對某泵站前置燈泡和後置燈泡貫流泵的進、出水流道分別進行了模型試驗,測試了流道水力損失。
  18. To serve the optimum hydraulic design for a large pumping station, a new method to separate inlet and outlet conduit from tubular pump system was put forward for measuring their hydraulic baa, by the way to design a special measuring system

    摘要為了配合某大型泵站貫流泵裝置的優化水力設計研究工作,本文提出了設計專用模型試驗裝置,將貫流泵裝置進水流道和出水流道從水泵裝置模型中分離出來分別進行模型試驗及水力損失測試的方法。
  19. Optimum design of key process parameters for waste collection system by vacuum conduit

    真空管道垃圾收集系統關鍵工藝參數優化設計
  20. Experiments were carried with under the conditions that involve three initial rates of flow, three kinds of conduit lengths jnd three sorts of valve, and the transient characteristics brought by valve adjusting were studied. for the first time does there have such an overall transient flow investigation of the whole system under valve adjusting condition

    對系統在三種初始流量、三種管長情況下進行三種閥的關閉實驗和在三種初始流量、三種管長情況下進行管路切換實驗,對這些條下閥調節引起的系統瞬變進行實驗研究。
分享友人