construction budget 中文意思是什麼

construction budget 解釋
工程投資預算
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • budget : n 1 預算,預算案。2 經營費;生活費;(有限制的)供應,來源。3 〈古語〉〈方言〉小皮包;小皮包中的...
  1. The required levels of construction cost estimates vary at different stages of project development , ranging from ball park figures in the early stage to fairly reliable figures for budget control prior to construction

    ?建築成本估算要求的精確程度在項目發展的不同階段發生著變化,從早期的相近數字到施工前預算控制時相當準確的是數字。
  2. Article 34 with respect to major public construction projects and major policy implementation plans, before the budget estimates and budget proposals are compiled, a cost efficiency analysis report on the alternative measures and substitute measures must be first drawn up and attached with a description of the financing and capital employment. and the report should be forwarded to the legislative yuan for its files and reference

    第34條重要公共工程建設及重大施政計畫,應先行製作選擇方案及替代方案之成本效益分析報告,並提供財源籌措及資金運用之說明,始得編列概算及預算案,並送立法院備查。
  3. With the development of the west region and beijing ' s successful application to host the 2008 olympic games, together with the accession to the wto, china is faced with an emergent demand for the construction of energy and other infrastructure projects. so it is wise for china to adopt bot in infrastructure projects, both for the purpose to modify the pressure on public budget, and for the benefit of importing advanced technology and management methodology

    隨著我國西部大開發戰略的提出及2001年北京申辦奧運會成功和我國加入世界貿易組織多年夙願的實現,大量的能源、基礎設施建設的需求顯得極為緊迫,而為了減輕政府基礎設施和公共工程預算資金的壓力,並更好的引進技術和管理經驗,採用bot方式來完成這一大批基礎設施項目的建設無疑是十分明智的選擇。
  4. Commodity house opens to booking need to have the following requirement : ( one ) open to booking a person to already obtained estate to develop intelligence letter, business charter ; ( 2 ) concern gold of sell one ' s own things of access of formulary consign land according to land management department, already obtained land access letter ; ( 3 ) licence of program of hold construction project and permit of construction project construction, already dealt with construction project quality and safety to control procedures ; ( 4 ) schedule of affirmatory already construction and complete consign use time ; ( 5 ) 7 achieve main body project below to seal a top ; 7 with what go up, the 2 / 3 above number of plies that main body project must build engineering budget to invest amount ; ( 6 ) already opened commodity house to open to booking a special account in project seat commercial bank ; ( 7 ) the other condition that law, code sets

    商品房預售需具備以下條件: (一)預售人已取得房地產開發資質證書、營業執照; (二)按照土地治理部門有關規定交付土地使用權出讓金,已取得土地使用權證書; (三)持有建設工程規劃許可證和建設工程施工許可證,並已辦理建設工程質量和安全監督手續; (四)已確定施工進度和竣工交付使用時間; (五)七層以下的達到主體工程封頂;七層以上的,主體工程須建到工程預算投資總額的三分之二以上層數; (六)已在項目所在地商業銀行開設商品房預售款專用賬戶; (七)法律、法規規定的其他條件。
  5. Talking about excess - budget problem of construction projects

    淺談建設工程項目超概算問題
  6. Editor - in - chief : rule for making water works budget jiangshu province ( edition in 2000 ) ; 2 ) editor - in - chief : auditing report for a key project - diverting cleaning water by qiangwei river ( first step ) ; 3 ) editor - participated : budget norm form water works construction and installation ( edition in 1999 ) ; 4 ) business consultation and management for water works budget

    主編江蘇省水利基本建設工程設計概算編制規定( 2000年修訂本) ; 2 ) 、主寫省重點水利工程(薔薇河送清水一期工程)審計報告; 3 ) 、參編江蘇省水利建築、安裝工程預算定額( 1999年修訂本) ; 4 ) 、全省水利工程造價管理業務咨詢。
  7. The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering, we should compare the connotations of plan price, float price and market price, we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost, analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid, we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost, not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid, carrying out bill quantity of construction works can advance the formation of cons truction - product market price, also is the outset and integrant route to close international, but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price, we also see it has lack and it should be amended

    針對以上問題,筆者認為:應該了解建築產品價格與工程造價、工程價格是如何界定的、比較建築產品的計劃價格、浮動價格與市場價格的含義,搞清楚工程造價的構成和建築安裝工程費用的構成以及竣工結算價格與決算價格的區別;通過分析、比較建築產品的「社會平均生產成本」和「企業個別生產成本」的計算依據和構成內容,從招標投標的設計機制的功能和實施招投標的目的來分析,確認在評標中剔除低於成本價標書的依據是投標企業的個別生產成本,而不是社會平均生產成本;筆者認為以定額為計價依據的施工圖預算方法與招標投標之間存在悖論,工程量清單計價的推行是對建築產品市場價格形成改革的推進,也是建築產品價格形成方式與國際接軌的開端與必經之路,但是也必須認識到雖然《建設工程工程量清單計價規范》具有推進建築市場價格形成的諸多優勢,但仍存在不足與需要完善的地方。
  8. Its main measures are : correct defining design - limited, ensuring accuracy of investment - appraised ; finishing works of optimally selected a tentative program - not exceeding investment - appraised ; by means of approved tentative program controlling design of constuction drawing ; concerning with investment of construction drawing not exceeding budget of tentative program ; managing changed - design, establishing assignment system of investment, reforming system of management of earning - way

    其主要措施有:正確確定設計限額,保證投資估算的準確性;加強設計管理,重視方案選擇,做好初步設計方案的優化和比選工作;嚴格按批準的初步設計控制施工圖設計,保證施工圖預算不突破批準的初步概算;加強設計變更的管理工作,控制不合理的設計變更;實行設計經濟責任制,建立投資分配考核制,改進設計收費方法。
  9. For a specific project, the construction cost of the project can be reasonably and scientifically analyzed and estimated by means of the reasonable planning for the resources allocation adaptable to the project made through the economic assessment on the conduction process ; by which the cost control indexes can be determined, the relevant internal checking mechanism and the budget system for construction cost control can be established, and then the avoidable measures for possible economic risk can be made as well, so as to obtain the benefit indexes adaptable to all the specific items to realize the management of the construction cost control for the whole construction process and build up the scientific and reasonable system of economic responsibility for making a basis for completing the project with better quality effectively, economically and reasonably

    摘要通過項目的過程經濟評佑,制定出適應工程項目的合理資源配置計劃,對具體工程項目的施工成本進行合理、科學的分析判斷,確定成本控制指標,建立施工成本控制內部考核機制和工程施工成本預算制度,找出具體子項的經濟風險源所在,建立相應的經濟風險規避措施,獲取適應每個具體項目的利潤指標,實現工程項目施工全過程的施工成本控制管理並建立科學合理的經濟責任制,以便調動項目部所有施工人員的創造性和主動性,為最終高效、經濟合理、保質保量地完成工程施工任務奠定基礎。
  10. The budget of the investment : the total investment capital is 20 million yuan rmb, the cost of the construction is 10. 5 million yuan rmb, the cost for purchasing the equipment is 7 million yuan rmb the foundation current capital is 2. 5 million yuan rmb

    投資預算:總投資2000萬元人民幣,建築工程費1050萬元人民幣,設備購置費700萬元人民幣,鋪底流動資金250萬元人民幣。
  11. The budget of the investment : the total investment capital is 14. 5 million yuan rmb, the construction cost is 9. 5 million yuan rmb, the investment of equipment fixing is 1 million yuan rmb, the cost for purchasing the equipment and tools is 1 million yuan rmb, the other costs are is 2 million yuan rmb, the current fund is 1 million yuan, the self capital is 4. 5 million yuan rmb and the capital importation is 10 million yuan rmb

    投資預算:總投資1450萬元人民幣,建築工程費950萬元人民幣,安裝工程費100萬元人民幣,設備工器具購置費100萬元人民幣,其他費用200萬元人民幣,鋪底流動資金100萬元人民幣,其中自有資金450萬元人民幣,引進資金1000萬元人民幣。
  12. Probe into the necessity of drawing up construction budget by designing institute

    淺談設計部門編制施工圖預算的必要性
  13. Currently, many problems are as follows : some people and engineers sometimes confuse or mistake so many conceptions and meanings of the price of construction product as to lead to troubles ; the cost of the construction product in the construction - auction - bid cannot be ascertained definitely ; the method of shop - drawing budget which is based on budget - ration cannot form effective market competition and market price of construction product. the management system of construction cost is not perfect

    目前建築產品價格及價格形成中存在以下問題:有關主管部門和少數工程人員有時混淆建築產品價格相關概念及其內涵,產生諸多誤解,以致造成工作上的摩擦;對建築工程招標投標中建築產品成本內涵界定不清晰;以預算定額為依據的施工圖預算方式難以形成有效的市場競爭以及形成建築產品的市場價格;當前未能形成完善的工程造價管理體制。
  14. First of all, because of the presence of duality economy, according to the fashion of the construction auction - and - bid and the computing fashion of construction cost, there are two modes, that is inviting public bidding in shop drawing budget and in the technique of calculating price of bills of quantities

    本文研究主要內容是經濟體制轉型時期工程量清單招標實施方案和工程實物量清單招標的實施程序。首先,由於我國經濟體制轉型時期二元經濟並存,導致在工程招標投標報價的方法也為二元模式:施工圖預算招標、工程量清單招標。
  15. Latest construction cost estimate and budget provision for each contract package

    每份合同包的最新施工成本估算及預算準備。
  16. It has a budget of 3. 7 billion yuan about 446 million us dollars for construction. the asean comprises vietnam, thailand, singapore, brunei, cambodia, indonesia, laos, malaysia, myanmar and the philippines

    據丹東黃海相關人士透露,該車的設計主要基於衛星城市的興起,以及機關團體用車越來越多,所以該車主要用於城郊客運機關班車團體客運長途及中短途的城際間客運旅遊包車等。
  17. Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control, the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program, cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method, factor estimation method, wbs estimation method and comparison estimation method, the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation. meanwhile, comprehensive quality management theory is introduced in the project " s schedule program. aiming at subsidiary project bidding, equipment purchase, essential quality inspection, detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep

    ( 3 )針對川塔項目施工建設具體需要,在充分體現項目事前規劃與全面控制相結合管理思想和所進行的項目wbs結構分解基礎上,基於項目進度? ?費用成本? ?質量三者之間的關系,提出了基於cpm關鍵路線法的川塔項目進度計劃制定方案,實現了進度規劃與控制的緊密結合;在對比分析經驗估演算法、因素估演算法、 wbs估演算法、類比估算等方法和技術基礎上,制定了側重於預算的川塔項目成本基本規劃方法,以及結合市場經濟情況的成本控制策略;同時將全面質量管理思想,引入了項目施工方案中,針對子項目招標、設備采購、重點質量監控點等設立了詳細的質量保障機制和細則,以確保達到工程優質建設的目標。
  18. The company provide a broad range of professional service including registered capital verification, auditing accounting statement of enterprises, assets appraising, corporate merger, division, disbandment, bankruptcy and liquidation auditing, corporate accounting counselor, accounting consulting, training of financial accounting personnel, construction budget and final accounts

    事務所業務范圍包括:驗證注冊資本、企業會計報表審計、辦理各類資產評估、承辦企業合併、成立、解散、破產清理審計、司法鑒定、擔任企業會計顧問、提供會計咨詢、培訓財會人員、建設項目的預(決)算,標底的編制及審核等業務。
  19. Some key links should be paid more attention in compile of construction budget

    編制準確工程預結算應注意的幾個環節
  20. Project item feasibility study, project budgetary estimate and construction budget, protendetr estimate for public bidding, construction cost check and appraisal, construction inspection, construction management and assets evaluation

    工程項目可行性研究,編制工程概,預算和招標標底,審核和鑒定工程造價,工程建設監理,工程項目施工管理和資產評估
分享友人