contract change analysis 中文意思是什麼

contract change analysis 解釋
合同更改分析
  • contract : n 1 契約,合同。2 婚約。3 承包(合約)。4 【法律】契約法。5 【牌戲】定約,合約橋牌。6 〈主英方〉...
  • change : vt 1 改變,變更,變換,變革。2 交換;兌換;把(大票等)換成零錢;把(支票等)兌成現金。3 換(車、...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  1. 3, by the qualitative and quantitative analysis methods, the process of performing contract is studied. and the control theory based on the change of engineering contract status is raised. the contract status control optimum model which is used to realize the claim chance and the contract judging model which is used to judge the contract performance are also put forward

    3 、用系統論的方法對合同的執行過程進行了定性和定量的研究,提出了工程合同狀態變化的控制理論;給出了用於進行索賠機會識別的合同狀態最優控制模型和能對合同執行全過程進行評判的合同評判模型。
  2. Through the analysis on the process of change claim on construction of temporary cofferdam for the downstream leading channel of jinghong hydropower station, the full process of how to make the application for change of construction project based on the change between the actual construction condition and the construction condition during bidding and how to realize the approval of the quotation of contract change is described herein for the construction enterprise, and then some viewpoints on the management and utilization of the relevant talent resources are put forward as well

    摘要工程索賠是一項知識和技術面很廣,復雜而又系統性很強的工作,文中通過分析景洪水電站下游引航道圍堰變更索賠過程,說明施工單位如何根據實際施工條件和投標時施工條件的改變,提出變更立項申請,實現變更報價審批的過程,同時在人才資源的管理和利用上提出一些見解。