control stream 中文意思是什麼

control stream 解釋
控制流
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • stream : n 1 河流,小河;川,溪。2 流出,流注;一連串,(人物等的)輩出。3 (事件等的)連續;(財富等的)...
  1. This paper discusses the designing and making of the dynamic testing systems of engine electronic control system. base on the construction and operation principle of santana 2000gsi m3. 8. 2 engine electronic control systems, design and manufacture led circuit of dynamic testing and fault imitating electronic control unit. on the inspect board, design and equip with motronic 3. 8. 2 ecu i / o measuring joints, design and set up obd - ii diagnostic communication link, design and install fuel pressure inspecting meter. depend on the obd - ii diagnostic communication link and ecu i / o measuring joints, this dynamic testing system can inspect engine electronic fuel injection system, distributorless ignition system, idle speed control system and evaporative emission control system, and can inspect m3. 8. 2 sensors, ecu and actuators, and can interrogate fault memory and erase fault memory ; and can analyse data stream ; and can carry out fault imitating. besides, this paper analyses sensors and actuators typical fault w aves

    2電控單元電路連接器設計製成輸入輸出電子控制檢測端子,並在檢測面板上布置了obd -診斷插座和燃油壓力表。使該動態測試系統能實現對電噴發動機的燃油系統、直接點火系統、怠速控制系統和燃油蒸氣排放控制系統的動態檢測;並通過obd -診斷座、 ecu輸入輸出檢測端子和故障模擬處理單元實現對電噴發動機電控系統各傳感器、電控單元、執行器進行故障碼讀取與清除;動態數據讀取和波形測試和故障模擬等。此外,本論文還分析了傳感器和執行器典型故障波形。
  2. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  3. Abstract : the fuzzy control technology in fuzzy control roller washing machine is introduced. the water level, water stream, washing time, rinse times and dehydration time can be determined according to clothes weight, temperature and turbid. the automation of washing clothes is realized through the application of fuzzy control technology

    文摘:介紹了模糊控制全自動滾筒洗衣機的模糊控制技術:通過傳感器檢測被洗衣物的布量、洗滌液的渾濁度和溫度,利用模糊推理的方法自動確定水位高低、水流強度、洗滌時間、漂洗次數和脫水時間.模糊控制技術的應用實現了衣物洗滌過程的全自動化,具有一定的智能功能
  4. Northeast faults control the spread of the anhui riverway, and eastwest faults resulted in the widening of the river and the occurrence of nodes, then the stream raised and the riverway turn into goose pattern braided river. northwest faults and northsouth faults influence the evolvement of partial riverway, for example, the northwest lujiang - zhongming fault influence the evolvement of tongning shoals, and the northsouth faults passing through zongyang - digang make the riverway ' s direction from north - east to north - south

    北東向斷裂構造控制了皖江河型的展布;東西向斷裂構造影響河道的拓寬,形成磯頭,磯頭挑流進一步使河道形成穩定的鵝頭型;北西、南北向斷裂影響局部河道的發育演變,如北西向廬江-鐘鳴斷裂影響銅陵沙洲的發育演變,南北向斷裂影響樅陽、銅陵、獲港河道使其延伸方向由北東轉向南北向。
  5. The test - bed has the functions of accurate and direct - viewing showing data stream and fault codes of electronic engine control system, and faults could be set in this bed

    本故障實驗臺,能準確直觀地顯示發動機電控系統的數據流和故障碼,並能設置故障。
  6. Step - nc ( iso14649 ) expends step into the area of cnc and renews the data interface between cax and cnc, which helps cnc system to use data models of products in three dimensions according with step directly in order to output nc programs then control machines directly, eliminate choke points of the information stream between cax, such as cad, capp, cam, cae, ped, erp and so on, connect the design product information and manufacturing product information on the base of step in the form of object - orientation, and change the traditional movement and switch control - orientation numerical programs into object - orientation programs

    Step - nc ( iso14649 )將step擴展至cnc領域,重新規定了cax與cnc之間的介面,其目的是: cnc系統能夠直接使用符合step標準的cad三維產品數據模型,直接產生加工程序來控制機床;在step的基礎上以面向對象的形式將產品的設計信息與製造信息聯系起來,消除cax (如cad 、 capp 、 cam 、 cae 、 ped 、 erp等)與數控系統之間信息流瓶頸;將傳統的面向運動和開關控制的數控程序改變為直接面向加工對象的數控程序。
  7. The input stream is decoded and passed through a digital volume control to an 18 - bit over - sampling, multi - bit, sigma - delta dac

    採用fameg獨創性的nand flash保護技術,可使fs7824擁有特定的存儲區域read only區。
  8. The pseudo - muscle method is used to implement all the low level faps which mimic the elastic deformations of the skin in each region and the rigid motions of the face. to generate the face animation freely, we construct a multi - level control model of face animation which is complex to simple, low level to high level from the bottom up. last, we develop a 3d face animation system compliant to mpeg - 4. in our system, fdp stream is imported to personalize the generic face model

    該方法首先根據mpeg - 4人臉模型規范對人臉模型進行功能區域的劃分,每個功能區域都有一些與fap相關的控制點;然後採用偽肌肉模型的方法,實現了fap集中所有的低級動畫參數,這些動畫參數模擬了每個功能區域的肌膚彈性形變以及臉部的剛性運動;建立了一個從下至上由復雜到簡單,由低級到高級的多層次的人臉動畫控制模型,這種控制方式方便了人臉動畫的生成。
  9. The tuen mun river is in the north western water control zone, while kai tak nullah and two minor streams are situated in the victoria harbour water control zone, and another minor stream near sham tseng is in the western buffer water control zone. photo of tuen mun river in the 1980s

    其中包括位於西北部水質管制區的屯門河,維港水質管制區范圍內的啟德明渠及區內的另外兩條小河溪,此外環保署也定期監測位於西部緩沖區水質管制區內深井附近的一條小溪。
  10. A job control statement used in cataloged or in - stream procedures. it can be used to assign default values for symbolic parameters contained in a procedure. for in - stream procedures, it is used to mark the beginning of the procedure

    在編目或流內過程中使用的一種作業控制語句,可用來對包含在過程中的符號參數賦予系統設定值。對流內過程,用來標志過程的開始。
  11. The total size of the serialized string is 22 bytes : 2 bytes per unicode utf - 16 character, multiplied by the maximum number of characters, plus 2 control bytes of overhead incurred from serializing a binary stream

    序列化udt時,序列化字元串的總大小為22位元組:每個unicode utf - 16字元佔2個位元組,乘以最大字元數,再加上因序列化二進制流而導致的系統開銷2個控制位元組。
  12. The total size of the serialized string is 22 bytes : 2 bytes per unicode utf - 16 character, multiplied by the maximum number of characters, plus 2 control bytes of overhead incurred from serializing a binary stream. so, when determining the value of

    序列化該字元串時,序列化后的字元串的總大小為22個位元組:每個unicode utf - 16字元占據的位元組數2乘以最大字元數10 ,再加上序列化二進制流所引入的開銷佔用的2個控制位元組。
  13. Stream and river control works may have a serious local influence on accelerating channel erosion.

    水流及河流控制工程對加速河道沖刷有嚴重影響。
  14. Transmission of time code and control code in the ancillary data space of a digital television stream

    數字電視附屬數據空間內時間碼和控制碼的傳輸規范
  15. Abstract : a technical solution for the multi - channel random data stream by tsr receiving programming is presented. details about resident interrupt receiving, data buffer setup, data segment address keeping, buffer read / write operation and program resident / unresident are described , and information process programming with advanced language is discussed. the application of this technique in the control system for the automatic burdening of a cement production line is given. the debugging method and procedure is introduced. source program written in advanced language, include data buffer access and calling are listed

    文摘:給出了一種「多通道隨機數據流的中斷駐留接收技術方案」 ,詳細描述了內存駐留中斷接收、開設數據緩沖區、數據段地址保存、駐留/解除和數據緩沖區讀取,討論了高級語言程序信息處理,舉出了該技術方案在「水泥生產線微機全自動配料測控系統」中應用的實例,介紹了調試方法和步驟,給出了高級語言讀取數據緩沖區數據及調用源程序。
  16. Since boundary of the lower yellow river bed varies with the flow conditions, main channel of the stream continually shrank and flood control becomes rather difficult

    隨著黃河下游水沙條件的不斷變化,河道的邊界條件也隨之發生變化,主槽嚴重萎縮,泄洪能力日臻下降,防洪問題日益突出。
  17. The plans will be carried out in different stages, which involves 11 key projects, including : taipu river, wangyu river, dyke around the taihu lake, south - drainage in hangjiahu plain, water drainage and diversion in huxi, hongqitong, flood control in east - west tiaoxi, water drainage and diversion in wuchengxi, enlarging lanlugang, dredging liuhe and xietang, north drainage in hangjiahu, and flood prevention in the upper stream of huangpu river

    該方案以流域防洪除澇為主,統籌兼顧供水,航運和環境保護等方面的利益,計劃分期實施包括太浦河、望虞河、環太湖大堤、杭嘉湖南排、湖西引排、紅旗塘、東西苕溪防洪、武澄錫引排、擴大攔路港疏浚泖河及斜塘、杭嘉湖北排通道及黃浦江上游防洪工程等十一項骨幹工程。
  18. Satco taking up flying training in australia upon return form the overseas training, satco will be provided with specialized air traffic control training in either the area control or aerodrome control stream. the training programme include theories, practical exercises in the simulators and on - the - job training in the real operational environment under the supervision of qualified controllers

    見習航空交通管制主任完成海外訓練返港后,將會接受區域管制或塔臺管制其中一項訓練,訓練內容包括理論、模擬機實習訓練,以及在符合資格的管制人員監督下,于實際運作環境中接受在職訓練。
  19. Hydroelectric power exploitation can reduce sediment disposal, lengthen life of power plants in lower stream, control stream, better water quality, and reduce contamination etc. considering the structure of power of sichuan province and pointing out its six problems in power development, this thesis comes up with sustainale development strategy of sichuan hydroelectric power exploitation, that is, prefentially exploit large scale hydropower plant which has good water - adapting capability, comprehensively use water resource, try to reduce cost caused by drowning, stimulate rotating exploitation, well deal with settlement of people in hydroproject construction, and alleviate contamination

    論述水電開發在減緩泥沙淤積、延長下游水電站壽命、調控水流、提高供水量、改善水質、提供清潔能源、減少環境污染等方面對長江上游生態屏障建設的作用。本文研究分析了四川水電開發的可持續發展戰略,首先對四川省電力結構現狀進行了分析,指出目前四川電力發展存在的六個主要問題,從優先開發具有良好調節性能的大型水電站、綜合利用好水資源,盡最大可能減少水庫淹沒損失,積極推進流域梯級滾動綜合開發,處理好水庫移民關系,減輕對環境的不利影響等六個方面論述了水電開發的可持續發展戰略。
  20. After attaining qualification on both area and aerodrome control stream with a period of consolidation, atco iii are normally selected for further training on radar control

    在指揮塔模擬機作實習訓練在取得區域管制和塔臺管制這兩項資格后,他們必須繼續鞏固工作經驗。
分享友人