coordination of insulation 中文意思是什麼

coordination of insulation 解釋
絕緣配合
  • coordination : n 同等,同位,對等;同等關系;調整;配合;協作,協調;【生理】(器官等的)共同調濟,協調(一致)...
  • of : OF =Old French 古法語。
  • insulation : n. 1. 隔離,孤立。2. 【物理學】絕緣,絕熱。
  1. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv電網接地故障的形式、消弧線圈接地的應用范圍、兩種運行方式供電可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以電纜為主的城區10kv電網中性點接地方式的選擇問題進行研究。論文首先對10kv電網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變電站10kv電網的實際參數來建立數值計算模型,在考慮了電網接地電容電流變化、中性點電阻取值大小、接地點接地電阻值變化等多種影響因素的情況下,對中性點經消弧線圈接地和經小電阻接地方式下電網的過電壓水平和接地點短路電流大小進行了數值計算,其計算結果與電科院所作現場試驗進行了比較。
  2. Insulation coordination for equipment within low - voltage systems part 3 : use of coating, potting or moulding for protection against pollution

    低壓系統內設備的絕緣配合第3部分:利用塗層罐封和模壓進行防污保護
  3. Insulation coordination for equipment within low - voltage systems - use of coating, potting or moulding for protection against pollution

    低壓系統內設備的絕緣配合.防污染用塗覆灌封和模壓的應用
  4. Insulation coordination for equipment within low - voltage systems - part : use of coating, potting or moulding for protection against pollution

    低壓系統內設備的絕緣配合.第3部分:防污染用塗層封裝或模壓的使用
  5. Insulation coordination for equipment within low - voltage systems - part 3 : use of coatings, potting or moulding for protection against pollution

    低壓系統內設備的絕緣配合.第3部分:防污染用鑄封或壓模塗層的使用
  6. Insulation coordination for equipment within low - voltage systems - part 4 : considerations of high - frequency voltage stress

    低壓系統內設備絕緣協調性.第4部分:高頻電壓應力問題
  7. In the light of new type tower and corresponding insulation coordination problem of three - gorges power transmission project, the live line replacement of middle - phase v - string insulators including the electrical clearance of tower head, combined gap, equal potential approach and operation method of replacement was discussed in detail

    摘要針對三峽電力外送線路中出現的新型桿塔及相應的絕緣配置問題,從塔頭電氣間隙、等組合間隙、電位方式以及更換操作方法等方面對此類桿塔帶電更換中相v串絕緣子進行了探討。
  8. Based on instance of mania project, the article raises an insulation coordination method for high elevation zone and the criterions fulfilling the insulation coordination conditions. it also has calculated the demanding values of withstanding voltage of all voltage levels equipment, and the results of outer insulation coordination. at the mean time, it proves the success of applying " humidity ratio " integrated emendation method in the mania project

    文中又根據滿拉工程實例,提出適合高海拔地區使用條件的絕緣配合方法及滿足絕緣配合條件的判據;採用「比濕」綜合校正法計算了滿拉工程各級電壓設備耐受電壓要求值及外絕緣配合成果,同時也證明「比濕」綜合校正法在滿拉工程應用的成功。
  9. Lead the team to do the research on electro - magnetic transient overvoltage calculation and insulation coordination of power system, lightning overvoltage calculation of substations and transmission lines, protection, operation and test of arresters, overvoltage limiter and other lightning protection equipment

    帶領團隊從事電力系統電磁暫態過電壓計算及系統絕緣配合研究,變電站和輸電線路雷電過電壓計算及防護技術研究,避雷器及過電壓限制器等防雷保護設備的運行技術和試驗技術研究等。
  10. Guide for the application of insulation coordination

    絕緣配合的應用指南
  11. Guide for insulation coordination of hvdc convertor stations

    高壓直流換流站絕緣配合導則
  12. Insulation coordination for equipment within low - voltage systems - part 3 : use of coating, potting or moulding for protection against pollution iec 60664 - 3 : 2003 ; german version en 60664 - 3 : 2003

    低壓系統內設備的絕緣配合.第3部分:防污染用塗層罐
  13. According to the practice on gezhouba to shanghai hvdc transmission project and in consideration of condition on three gorges hvdc project, some suggestions on protection of overvoltage and insulation coordination for outer insulation, against pollution - wet, dc neutral bus over - voltage and dc & ac filter are technically presented. it may be a reference in design of three gorges converter station

    根據葛南直流工程的經驗並結合三峽工程的情況,在換流站的外絕緣、直流耐污濕技術、直流中性母線過電壓防護、交直流濾波器的過電壓防護等方面提出了過電壓和絕緣配合的技術要求,供設計參考。
  14. Application of insulation coordination

    絕緣配合的應用
分享友人