crane-up 中文意思是什麼

crane-up 解釋
升高
  • crane : n 克蘭〈姓氏〉。n 1 鶴;〈口語〉蒼鷺,鷺鷥,鸛;〈C 〉【天文學】天鶴座。2 起重機,吊車,攝影升降...
  • up : adv (superl uppermost )1 向[在]上,向[在]上面;向[在]被認為處于上方的地方或方面〈如河流的源頭,...
  1. They crane up building material.

    他們以起重機舉起建築材料。
  2. The garret, built to be a depository for firewood and the like, was dim and dark : for the window of dormer shape, was in truth a door in the roof, with a little crane over it for the hoisting up of stores from the street : unglazed, anal closing up the middle in two pieces, like any other door of french construction

    閣樓原是做儲藏室堆放柴禾之類的東西用的,十分陰暗那老虎窗樣的窗戶其實是房頂的一道門,門上還有一個活動吊鉤,是用來從街而起吊儲藏品的。那門沒有油漆過,是一道雙扇門,跟一般法國式建築一樣,從當中關閉。
  3. The fifth chapter sums up the procedure of the crane outlook design, puts forward four projects on single - arm kickstand crane from it and compare them. by the help of autocad 2000, the article makes projection charts. the sixth chapter gives a conclusion on the research

    在前四章的基礎上第五章總結了門座起重機形態設計的程序,以此為依據,筆者做出了四套單臂架門座起重機形態設計的方案,並藉助autocad2000軟體作出了投影圖及效果圖,最後對四種方案進行了比較。
  4. Thedevelopment development hydraulic jack, the bearing heater, thebearing get up pulling out, the hydraulic pressure spanner, thehydraulic pressure pulls a horse, the hydraulic pressure small crane, nut broken cutting, the oil filter machine and the pipe bendingmachine and so on the advanced practical mechanical and electricalservice product has the world advanced level, the product and thetechnology widely applies to domain the and so on electric power, petrification, chemical industry, metallurgy, mine, spinning andweaving, papermaking machinery service department and the machinemanufacture unit, and in the daya bay nuclear power station, beijingsteel corporation, wuhan steel corporation, the baoshan steelcorporation, the daqing oil field, the victory oil field, the golmudoil field, the three gorges power plant, yangzi petrifies, qi and lupetrifies and so on in the national large and middle scale enterprisesand the project the comprehensive promoted use

    研製開發的液壓千斤頂,軸承加熱器、軸承起拔器、液壓扳手、液壓拉馬、液壓小吊車、螺母破切器,濾油機和彎管機等先進實用的機電維修產品有世界先進水平,產品和技術廣泛應用於電力、石化、化工、冶金、礦山、紡織、造紙等領域的機械維修部門和機械製造單位,並在大亞灣核電站、首鋼、武鋼、寶鋼、大慶油田、勝利油田、格爾木油田、三峽電站、揚子石化、齊魯石化等國家大中型企業和工程中全面推廣使用。
  5. It is a non - propelled crane ship after conversion, operating in ports and calm waters, deploying towing in chinas coastal class ii navigational area and suitable for salvage of sunken ships, harbour construction, lifting of bridge beams sections for erection, loading unloading heavy cargoes as well as offshore oil drilling production platform and other offshore hook - up

    本船改建后為非自航固定式起重船,以港口及平水區域作業為主,可在我國沿海ii類航區中調遺拖航,適用於打撈船舶港口建設橋梁吊裝裝卸重大物件,以及海上石油鉆井採油平臺和其他海上弔裝工程。
  6. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  7. The first chapter of the essay introduces its background, sums up the development trend of international industry design and port crane, and analyses the problems in crane industry design of our country and its research design. based on it, the task of my article is brought forward

    論文在第一章介紹了論文的背景,總結了當前國際工業設計及國內外港口起重機的發展趨勢,分析概括了我國港口起重機工業設計所面臨的問題及港口起重機工業設計的研究方向。
  8. The heavy - duty slewing crane is suitable for the material swinging operation in metallurgy, railway, quay, machinery manufacture, etc. this hoist adopts the structure of rotary fulcrum bearing and variable cross - section. the overweight height is up to 2. 5 - 2. 6 meters, and rotary radius is up to 7 - 12 meters

    重型旋臂型起重機適用於冶金鐵路碼頭機械製造等行業的物料吊運作業,該機採用了回轉支承與半截面壁結構,超重高度達2 .米,回轉半徑達米。
  9. Pick up the pod assemblies with the bop crane and fix them to the lmrp

    用防噴器吊車提出起接頭盒總成並固定在隔水管下部插入總成上。
  10. A port tyre crane has various parts and complex structure, which is made up plenty of beam - bar and shell elements, manual calculation can not guarantee the precision while finite element method needs onerous structure modeling and a great deal of date input. the finite element analysis and modeling of the port tyre crane are difficult because of complex structure and various loads. in order to fit further more design and exploitation of the same type as well as the upgrade of the production i study a kind of parametric software for structure analysis of the port tyre crane, it can reduce the difficulty of modeling and structure analysis as well as improve efficiency

    港口輪胎式起重機部件繁多、結構復雜,由數目眾多的梁桿與板殼組成,其結構設計和力學分析使用傳統的手工計算方法難以保證精度,有限元方法則需要繁重的結構建模和大量的數據輸入,並且要求分析人員具有相當的力學知識和有限元基本理論。港口輪胎起重機結構的復雜性、載荷工況的多變性導致港口輪胎起重機結構有限元建模和分析工作效率低、難度大。針對這種情況本課題研發了一套港口輪胎式起重機結構的有限元參數化分析軟體,以適應同類機型的進一步設計開發和產品升級換代,降低建模和分析的工作難度,提高工作效率。
  11. Therefore if the closed planetary gear train and the differential plahetary gear train set up a multistage mixed gear train, we will obtain a winch on automobile crane which satisfy the request of double speed, great transmission ratio and small volume

    因此將差動和封閉行星輪系組成多級混合輪系,就可得到一種滿足汽車起重機上的卷揚機雙速、大傳動比、小體積要求的傳動機構。
  12. Never lift up load beyond rated capacity of crane

    絕對不可提升超過吊臂所能承受的荷載的物件。
  13. In the base of information collection, discourse study handling technology in yangshan container terminal of the first phase. at one time. reference waigaoqiao and ningbo container terminal " s handling technologys compare the characteristic of handling technology, and analyse the index of the technology and the economy between rail - mounted transfer crane and rubber - tyred gantry crane. discourse is carved up four part. namely task analyse of handling technology design > project study out > size design s technology and economy argumentation, commendable project confirm

    同時,借鑒外高橋、寧波北侖等的集裝箱碼頭裝卸工藝設計,著重比較分析輪胎式龍門吊和軌道式龍門吊各自的裝卸工藝特點和技術經濟指標。全文共分四個部分,即裝卸工藝設計的任務分析、方案擬定、規模設計以及技術經濟論證和推薦方案的確定。
  14. I crane my neck to see if i can catch a glimpse of some tiny little kitten poking its head up out of a sleek chrome side - car or maybe even peeking out from inside the front of a black leather jacket

    我伸長脖子,看看我是否能瞥見一隻可愛的小貓從摩托車光滑的合金邊斗里探出頭來,或者,有沒有可能從騎手黑色皮夾克的前胸里向外窺探。
  15. To lift up a heavy machine from an open top container with heavy crane truck

    用重吊車將機器從開頂櫃中吊出
  16. The gpd3402 inverter and plc being selected to set up open - loop and closed - loop speed regulation systems, applying the invariable v / f control, sensorless vector control, slip compensation, process pi and network control technologies control the hoist motor of the stacker crane

    本文基於gpd3402變頻器的變頻調速方式進行應用開發,對堆跺機提升電機採用變頻調速控制,採用gpd3402變頻器及plc ,組建開環調速系統,分別應用恆壓頻比、無速度傳感器、矢量控制、轉差補償控制技術。
  17. Adapable units of wire and cable machinery pay - off and take - up. part 3 : travelling crane type pay - off and take - up

    電纜設備通用部件.收放線裝置.第3部分:行車式收放線裝置
  18. In the paper, the situation and method of scheduling problem studied of automated warehouse are surveyed completely. the problems of automate guide vehicle transport and stack crane picking order are analyzed deeply in parcel post automated warehouse, basic mathematic model of scheduling is set up

    通過對郵包自動化倉庫系統中的自動導引小車運輸問題和巷道堆垛機的揀選順序認真地分析,建立起了調度的基本數學模型,提出了用總的空載時間作為目標函數,並且把這兩類問題都歸結為求解旅行商問題。
  19. Just shut up, dog. the crane swooped down on you

    閉嘴吧,小子克瑞恩直沖你飛過去
  20. We have rapidly grown up as the largest company in this field in zhejiang province in the past few years due to our advanced technology and quality - oriented working philosophy as well as honest and credible trade principle. sifang provides a wide selection of scales, including electronic crane scale, weighing indicator, dynamic weighing devices and digital load cells and the like

    目前本公司廠區面積7000平方米,建築面積6000平方米,擁有電子機械計算機等全方位的技術人才和完善的生產和測試設備,是目前浙江省內規模最大,設備和技術力量最強的各種電子秤和稱重顯示器製造廠。
分享友人