creep effect 中文意思是什麼

creep effect 解釋
蠕變效應
  • creep : CREEP =Committee for the Reelection of the President (美國)支持總統連任委員會。vi (crept; cre...
  • effect : n 1 結果。2 效能,效果,效力,效應,作用,功效;影響。3 感觸,印象;外觀,現象。4 旨趣,意義。5 ...
  1. Comparing with the same category overseas jointless bridges, the new type bridge has more reasonable structure, more simple and convenient construction, and better use effect etc. the main work in this paper is described as follows : ( 1 ) this paper introduces phylogeny and reseach survey of the joints bridge inland and abroad, and a new jointless bridge structure ? new type semi - integral abutment bridge is based on these, which characteristic of own structure and setting of primary component are expatiated. ( 2 ) this paper analyses influence of temperature effect, creep, shrinkage and circumambient soil of run - on slab on the new type structure, and analyses the forcing performance of beam, abutment and run - on slab of the new type semi - integral abutment bridge, and constrast to the same category joints bridges

    本文主要做了以下工作: ( 1 )介紹了無縫橋梁在國內外的發展歷史、研究概況,並在此基礎上提出了一種新的無縫橋梁結構形式-新型半整體式無縫橋梁,闡述了它特有的結構形式以及主要構件的設置; ( 2 )分析了溫度效應、徐變和收縮以及搭板周圍土體對這種新型結構的影響,對新型半整體式無縫橋主梁、橋臺以及搭板進行了受力性能分析,並和同類無縫橋梁進行了對比分析。
  2. In the paper, not only such factors as reinforcing steel bar, various placing temperature of concrete in case of lift placements, lift thickness, time interval between lifts, the variation of elastic modules of concrete, heat of hydration, the temperature changes of environment but the effect of creep deformation and autogenous volume change on the temperature field and thermal stress field of reinforced concrete face - slab are considered

    本論文在分析中,考慮了鋼筋、混凝土分層澆築、入倉溫度、澆築層厚、施工間歇、混凝土彈性模量變化、水化熱發散規律、外界氣溫等因素的變化及混凝土徐變和自生體積變形等因素對面板溫度場和溫度應力的影響。
  3. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。
  4. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  5. In computation the effect of thermal insulation, elastic modulus, creep degree and autogenous volume change along with age, the progress of pouring by layer, work suspension in summer, the change of air temperature, heat preservation, water cooling, and water storage, by stages on temperature field are considered

    計算中考慮了混凝土的絕熱溫升、彈性模量、徐變度和自生體積變形隨齡期的變化以及分層澆築、夏季停工、外界氣溫變化、表面保溫、通水冷卻及分期蓄水等因素對壩體溫度應力場的影響。
  6. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋施工控制及結構計算方法的探討,提出了有效的施工控制系統,實現了對實橋施工數據和技術信息的採集;通過分析理論計算與實際施工狀態的差異,確定了以卡爾曼濾波法作為施工參數識別與調整的自適應施工控制方法;通過正裝迭代法確定其合理施工狀態,並考慮混凝土的徐變效應,提出了合理的預留拱度和索力調整方案。
  7. The latest experimental results of rock creep were used : the third invariant of deviator stress tensor had greater effect on creep properties ; the stress threshold of lateral creep of rock was 20 % ~ 40 % less than that of axial creep of the same rock

    文中應用了課題組近期巖石流變實驗研究的結果:應力偏量第三不變量對巖石蠕變影響顯著;巖石側向蠕變的應力閥值比軸向蠕變應力閥值低20 % ~ 40 % 。
  8. In this thesis, the new structure of pre - stressed cantilever composite beam with corrugated steel webs on steel - concrete composite spine girder was brought forward for the first time, a series of experimental researches and theoretical analyses relating to this new structure are conducted, including load transverse distribution rule, shrinkage and creep effect, temperature difference effect, and ultimate bearing capacity

    本文提出大懸臂預應力波形鋼腹板挑梁這一新的構造形式,對其橫向分佈規律、收縮徐變、溫差效應以及承載能力等方面的受力特徵進行了分析和試驗研究。
  9. The results showed that the creep coefficients in cfrp - confined concrete columns and in epoxy - coated concrete columns are almost same, both are less than that in plain concrete columns on the same other conditions but surface treatment, which demonstrates that the creep reduction in cfrp - confined concrete columns is due to the existence of epoxy coating not of cfrp sheet. furthermore, the physical apperence and dimension have litter effect on the creep behavior of cfrp - confined and epoxy - coated concrete columns

    結果表明:其他條件相同時, cfrp約束混凝土柱與塗膠混凝土柱的徐變基本一致,比素混凝土柱徐變小29 . 0 %和26 . 9 % 。 cfrp約束混凝土柱的徐變減小是由於粘貼cfrp布時的膠層所致而非核心混凝土的約束效應。 cfrp約束或表面塗膠的混凝土柱的外形、尺寸及體表比對其徐變的影響很小。
  10. The parameters of the creep constitutive model can be obtained from the back analysis according to the observed deformations of concrete face rockfill dam ( cfrd ) in prototype and then applied to predict the post deformation of the dam with the effect of creep taken into account

    採用該方法對某堆石壩9參數流變模型參數進行反演分析,計算結果表明,利用反演的模型流變參數所計算的壩體流變變形與實測資料在發展規律及數值上均比較吻合。
  11. In the processing of the numerical simulation of lrv dynamics, knowing from the creepages of irw first, wheel profile has sensitive effect on irw creepages, so the wheel profile should be selected cautiously to optimal the vehicle dynamic behaviors. next, the longitudinally creep force is disappeared, so the self - oscillation vvill do n ' t occur and the bogie is stability. while the natural steering action of vheelset is lost which means that some sort of steering action is necessary to keep the wheelset appropriately aligned on a curve

    在輕軌車輛動力學數字模擬計算中,通過對獨立旋轉車輪蠕滑率的分析知,車輪踏面外形對其影響十分敏感,適當的選取獨立旋轉車輪踏面的外形可以優化車輛的動力學性能;採用獨立旋轉車輪,縱向蠕滑力不復存在,自激振動不會發生,轉向架也就穩定;但同時,常規輪對具有的自動導向功能西南交通大學碩士研究生學位論文第11頁也失去了。
  12. This paper also presents a quantitative method to evaluate this creep effect

    本研究也提出一個可以評估深開挖土壤潛變效應的量化評估方法。
  13. In view of the fact that prediction of creep and shrinkage with current bridge provision for specific concrete under specific ambience sometimes has a big discrepancy with real values, a new method to obtain the expressions of creep and shrinkage from newly - built pc bridges short - term test results is presented, and relative equations have been established. therefore, a reliable long - term prediction on effect due to creep and shrinkage in pc bridges holds a firm bearing point

    研究中發現某一特定環境下工作的混凝土用現有規范公式預測得到的徐變、收縮特性常有偏差較大的現象,由此提出了從新建預應力混凝土橋梁短期試驗結果推算梁體相應素混凝土在工作環境下的徐變、收縮特性的思想和方法,並建立了計算式,為新建預應力混凝土橋梁可靠的徐變效應分析提供了前提和保證。
  14. Room temperature creep and its effect on flow stress in x70 pipeline steel

    70管線鋼的室溫蠕變及其對流變應力的影響
  15. The development of all lands of strains of the concrete is observed. it is found that, for the scc walls, the majority pre - built compressive stress is relaxed due to the creep. hence, the creep has a rigidity effect on the build - up of the tensile stress

    通過對混凝土各項變形隨時間發展的時程分析結果表明,對補償收縮混凝土墻,徐變總體上起到消耗膨脹壓應力的作用,對拉應力積累具有剛化效應。
  16. Above all, with the data acquired by tests, this thesis has analysized the lateral resistanc, longitudinal resistance and rail creep etc between ballast and sleeper before and after mass machine work, discussed the effect of mass machine on stability of continuously welded rail track, reseached the change regularity of fastening - down temperature of rail, which is resulted by mass machine work, and have settled the suitable range of work temperature which guarantees the stability of jointless railway. what ' s more, this thesis has put forward the appropriate work pattern, work temperature and work area for mass machine work in future. at the same time, this thesis has given rational suggestions about some conditions worth of attention in production of mass machine, which can in return raise the work productiveness of mass machine. at last, this thesis has considered formulating reasonable measures for operation organization and work standard, so that mass machine work can play an important role in maintenance, which can reduce work load, raise work efficiency and maintenance cost in daily maintenance

    本文通過實測的各種數據,分別對大機作業前後道床對軌枕的橫向阻力、縱向阻力、鋼軌爬行情況等進行深入分析,進一步探討大機作業對無縫線路穩定性的影響,研究大機作業引起的鎖定軌溫的變化規律,確定保證無縫線路穩定的合適作業軌溫范圍。為我國今後的大型養路機械作業提出合理的作業方式、合適的作業軌溫和作業地段,同時對大型養路機械作業中應注意的問題提出合理化建議,為大型養路機械作業提供更高的安全保障,進一步提高大機作業效率。最後,對工務段在大機作業中的配合制定完善的施工組織措施及作業標準,使大機作業在養護維修中發揮更大的作用,為工務段日常的養護維修減少工作量,提高勞動效率,降低維修成本。
  17. To the problems in long - term monitoring of concrete stress, the numerical simulation for concrete creep effect of the main girder segment of wenhui bridge was made ; accordingly a method that can approximately separate the creep strain was put forward

    針對目前混凝土應力長期監測中存在的問題,對文暉大橋主梁節段進行了徐變效應的數值模擬分析,並提出了近似的徐變應變分離方法。
  18. The analytic model of this bridge is established. a lot of influencing factors such as identifying and adjusting of structure parameter, construction technology, construction monitoring method, temperature effect, concrete young ' s modulus and shrinkage and creep effect are considered in construction monitoring and controlling. the construction control of this bridge is realized through construction monitoring, back coupling and forecasting and the preplanned target is reached at last

    通過建立大橋結構分析模型,選擇合適的影響因素,包括結構參數識別及調整、施工工藝、施工監測方法、溫度效應、混凝土彈性模量及其收縮、徐變效應等,並經監測、反饋、預測,實現大橋線形和應力的不斷調整和控制,達到了預定的目標。
  19. An fem analysis of creep effect in pre - stressed concrete structures

    預應力混凝土結構徐變效應的有限元分析
  20. To testify the feasibility and suitability of this new - type prestressed concrete structure, lot of studies is made on the aspects of static performance, creep effect and dynamic performance, etc. whether from theory analysis or experimental study in this thesis

    為驗證這一新型預應力混凝土結構的可行性與適用性,本文從理論分析和試驗研究兩個方面對其靜力性能、徐變效應和動力特性等多方面進行了研究。
分享友人