cross-line plane 中文意思是什麼

cross-line plane 解釋
十字線平面
  • cross : n 1 十字架;〈the C 〉 耶穌受刑的十字架。2 〈the C 〉 基督教(教義,國家)。3 不幸,苦難;挫折,...
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  • plane : n 懸鈴木屬樹木。n 1 平面,水平面,面。2 (知識等的)發達程度,水平,階段。3 【航空】機翼面;〈常 ...
  1. This thesis primarily makes below the work of a few aspects : ( 1 ) the method to append the section line in the geological section plane and the geological plane graph intersected each other ; ( 2 ) the principle and method that automatic determinate of orebody on transverse section with the neural network theory was presented, and draw the slippery boundary of ore ; ( 3 ) the method that drawing the surveying well and lane way engineering in the geological and survey graph ; ( 4 ) the method to automatic calculation and statistics output ore reserves and grade ; ( 5 ) the method that automatic creating the geology cross section of the hole ; this thesis realizes automation for managing geological graph based on the substantive research work

    本論文主要作了以下幾個方面的工作: ( 1 )提出了在相交平面圖和剖面圖中添加剖面剖切線的方法; ( 2 )提出了應用人工神經網路理論確定剖面中礦體界線的理論和方法以及礦巖界線圓滑的原理與方法; ( 3 )實現了礦山生產實測工程數據處理與地測圖件的有機結合; ( 4 )實現了礦塊地質品位和儲量的自動計算和統計輸出; ( 5 )提出了中深孔炮孔排面地質剖面圖自動剖切的原理和方法。本論文在大量研究工作基礎上,實現了地測圖件管理的計算機自動化。
  2. A separated - parameter method is proposed to calibrate the structure parameter. a vanishing line method is proposed to calibrate the normal vector of light plane and invariability of cross - ratio is proposed to calibrate the baseline length

    並提出一種參數分離的方法對傳感器進行了標定,採用消隱線法標定激光平面的法矢量,利用交比不變原理標定激光平面的基線長度。
  3. Abstract : the paper briefly analyzes and explains the main technicalparameters such as line plane design parameters, line longitudinal cross section and railway track specifications in the renovation of beijing - qinhuangdao railway line for the purpose of raising train speed

    文摘:結合京秦線提速改造設計的具體情況,對線路平面設計參數、線路縱斷面和軌道等主要技術標準的選擇作了簡要分析研究。
  4. The squall line complex continued to move southeast. at about 12 : 30utc 8 : 30 p. m. local time, an area of intense rain, over 100 mm h, moved to just south of ting kau tk, see figure 9 for location to cross the approach path of runway 25r northern runway at a time a plane was making an instrumented approach to runway 25r see figure 10

    颮線群繼續向東南方移動,在大約協調世界時12時30分本港時間下午8時30分,一個降雨率超過每小時100毫米的大雨區剛好移到汀九tk ,位置見圖9南面,橫過25r跑道北跑道的降落航道,而這時正有一架航機以儀表導航方式準備降落25r跑道圖10 。
分享友人