dam e 中文意思是什麼

dam e 解釋
濕度
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • e : (pl E s e s )1 英文字母表第五字母。2 【音樂】E調,E音。3 E字形。4 〈美國〉(順序)第五等,(成...
  1. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    混凝土面板堆石壩上游坡面傳統的墊層料超填、削坡、斜坡碾壓的施工方法存在許多弊端。
  2. Abstract : the control methods of tailing dam of wulongquan mine were introduced, some new techniques as recovery and utilization of the wash - or e tailings of limestones and dolomites, and draining seepage and solidification technology by radial well to reinforce the main dam were described in detail

    文摘:介紹了烏龍泉礦尾礦庫治理的具體方法,詳細地闡述了回收利用石灰石、白雲石洗礦尾礦的回收利用和採用輻射井排滲固結技術加固主壩等新工藝。
  3. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  4. In the construction period, the shiplocks are managed through the method of being entrusted to three gorges navigation administration of communication ministry by the proprietor of water conservancy project ( i. e. three gorges development company ), by which the project ' s construction smoothness and gezhouba dam ' s and three gorges dam ' s navigation

    三峽水利樞紐施工期船閘管理採取的是由業主(三峽開發總公司)委託交通部所屬長江三峽通航管理局管理的方式,該方式保障了三峽工程施工順利和葛洲壩、三峽航運暢通,但畢竟是工程施工期的過渡辦法,工程完工後必須建立武漢理工大學工程碩士學位論文新的船閘管理體制。
  5. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾壓混凝土的材料特性、施工特點、溫度場溫度應力的變化特點入手,結合幾個工程總結了碾壓混凝土重力壩、拱壩的分縫方式,降低澆築溫度、水管冷卻、表面保溫、施斜層碾壓等溫控措施,採用微膨脹混凝土、提高材料抗裂性能等改善材料性能措施及碾壓混凝土溫度場、應力場模擬分析的要求和應注意的問題。
  6. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  7. The status of the research for non - entirety analysis of arch dam and joint models commonly used were reviewed. the fem analysis for contact problem, i. e., iterative method, contact constraints method and mathematical programming method, were summarized. 2

    評述了拱壩結構非整體性分析研究的現狀以及拱壩結構分析中常用的接縫模型;進一步從直接迭代法、接觸約束法和數學規劃法三個方面綜述了基於有限單元法的接觸問題分析方法。
  8. This essay analyzes meinung anti - dam movement and kongliao anti - nuclear movement in order to construct two ideal types in political exchange, i. e., autonomy and dependency

    本文分析美濃反水庫運動與貢寮反核四運動之個案,試圖創建政治交換關系的自主與依賴的理念類型。
  9. 2 ) duncan e - u model is applied to the material of the dam. the feasibility of using duncan model is discussed. the duncan e ~ u model which considers the creep character of asphaltic concrete is adopted

    壩殼材料選用鄧肯e -模型;討論瀝青混凝土心墻材料選用鄧肯模型的可行性,最終採用考慮瀝青混凝土蠕變特性的改進鄧肯模型。
  10. By applying " none homogeneous multi - laminate element ", hong - kou rcc gravity dam ' s simulation computing of temperature field and stress field at construction period and operation period for all courses and many factors. e. some kinds of methods are discussed in detail for temperature field back analysis, and artificial neural network method for back analysis of thermal parameters of concrete is suggested

    應用「非均質層合單元法」實現了洪口碾壓混凝土重力壩施工期、運行期全過程多因素的溫度場及徐變應力場的模擬計算,進行多方案的比較分析,推薦出優選溫控防裂方案,取得了非常滿意的成果。
  11. The sceneries are including piled rainbow bridge, big sand dam, e lu long, moon lake ( chai shi tan reservoir ), and ma ti river

    包括疊虹橋景區、大沙壩景區、三腳洞景區、阿路龍景區、明月湖景區(即柴石灘水庫) 、馬蹄河景區。
  12. Base on data, distortion character of lianhua faced rock - fill dam body has been reappeared by non - linear denken e - b model fem analysis ; at the same time, parameters in calculation accordant with model are adopted either in construction stage or in storage period

    本文根據資料所進行的非線性鄧肯e - b模型有限元分析,計算分析了蓮花面板堆石壩壩體的變形性狀;同時在計算中,無論施工期或蓄水期,都採用與模型配套的統一的參數。
  13. By combining the design of cast asphalt concrete core earth - rock dam of nierji hydroelectric projects, an optimize study on the structural types and construction technology of cast asphalt concrete core are carried out in the article. the main contents of the study are summed up as follows : at present, the main and auxiliary core structures are widely adopted in the design of the cast asphalt concrete core earth - rock dam in the state, i. e. the main core to be asphalt concrete and auxiliary core of asphalt mortar masonry

    本文結合尼爾基水利樞紐工程的澆築式瀝青混凝土心墻土石壩的設計,對澆築式瀝青混凝土心墻的結構型式和施工技術進行優化研究,主要研究內容歸納如下:目前我國在澆築式瀝青混凝土心墻土石壩設計中,心墻的型式多採用主、副墻結構,即主墻為瀝青混凝土,副墻為瀝青砂漿砌體。
  14. Based on the duncan - chang e - b model, which can simulate earth - rock dam ' s non - linear mechanics behavior well, the paper introduced the nature coordinate system to the stress space. in this way, hydrostatic stress and stress deviator were decomposed each other. therefore, a partial derivative formulation about displacement and parameter in finite element evaluation was derived in a closed form

    論文以能較好模擬土石壩非線性力學行為的duncan - change - b模型為基礎,通過引入應力空間下的自然坐標系,分解應力球量與應力偏量,從而導出一個在有限元計算中,位移對參數偏導數的閉合形式公式。
  15. By adopting the three - dimensional nonlinear finite element program, using drucker e - b model, demonstrating the actual construction progress and water impounding of gongboxia hpp main dam, comparing the two schemes of the existence and nonexistence of extruded concrete curb, made three - dimension simulation calculation, the result proved that while the existence of extruded concrete curb between face slab and rockfill, the deformation and stress of face slab are better than that while the nonexistence of extruded concrete curb

    採用三維非線性有限元計算程序,使用鄧肯e b模型,模擬公伯峽面板壩的實際施工進度、蓄水過程,對比有無擠壓邊墻兩種方案,進行三維模擬計算。結果表明,面板與堆石體之間有擠壓邊墻時,其面板的變形及應力值均小於無擠壓邊墻的相應結果。
  16. The result of the study included two aspect : one is the affection when hollow opened and pier on arch - dam with statics calculation, earthquake response spectrum analysis and analysis of time - history i. e step - by - step integration analysis

    本文完成的主要工作有兩個方面:一是通過靜力分析、反應譜分析和時程分析研究壩身開孔及閘墩對壩體整體動力反應的影響。
  17. ( 4 ) coupled with seepage analysis, side slope ' s stabilization was calculated, then parameter of soil was deduced for reference when strengthen. ( 5 ) the duncan e - v model was adopted to analyze dam before strengthen so as to estimate the original stress and displacement status

    ( 4 )結合滲流分析的結果,對萌山水庫大壩的抗滑穩定進行計算分析,並用反演分析法反求其達到穩定要求時的土體參數,供加固處理時控制。
  18. Its stability evaluation should be performed from the following aspects, i. e. the method of rock simulation, the co - action of the dam and abutment, the mechanism of abutment instability, and the criterion of instability

    闡述壩肩穩定評價中主要包括的4個方面內容:壩肩巖體的模擬方式,壩體和壩肩的聯合作用,失穩機理和失穩判據。
  19. Duncan e - b model and " nanshui " double yield faced elasto - plastic model are used for analysis of the characteristics of stress and deformation in the faced rockfill dam of huangshitan

    採用duncane - b模型和「南水」雙屈服面彈塑性模型對黃石灘面板堆石壩的應力變形特性進行了分析。
  20. The model ' s parameter was applied to gain the theoretical stress - strain - volume change curves and used to compare with the experimental stress - strain - volume change curves to verify the rationality of it. the newly proposed model is applied in the finite element program, the new program was applied in finite element stress - strain analysis of zipingpu reservoir concrete faced rockfill dam, and at the same time compare with the result of the widespread model ( such as e - u model ) to test and verify its rationality initially

    利用求取的模型參數得出理論擬合曲線,進行理論擬合曲線與試驗實測曲線比較,驗證建議模型的合理性;對有限元程序進行修改,加入建議模型子程序模塊,採用建議模型並對壩體進行有限元應力應變計算,同時與目前應用較廣泛的模型(如e - u模型)計算結果比較,初步驗證建議模型和合理性。
分享友人