dam foundation 中文意思是什麼

dam foundation 解釋
壩基
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  1. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  2. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  3. Study on influences of asymmetry on arch dam foundation

    拱壩基礎不對稱性影響研究
  4. Leakage in a dam foundation may sometimes be overcome by digging deep into it so as to build a cutoff wall into the foundation.

    壩基漏水的現象,有時可以用深挖地基建造堵截水墻的辦法來克服。
  5. The information refers to slopes in opencast mines, quarries, dam foundation excavations and highway outs.

    這份資料提供了有關露天礦、採石場,壩基和公路塹的邊坡資料。
  6. In this article, seepage and stability against deep sliding are studied and discussed in detail as regard to dongzhang dam which has glacis weak surfaces in the dam foundation, some valuable results are obtained

    本文結合壩基含有緩傾角軟弱夾層的東張水庫大壩工程,對壩基滲流及抗滑穩定性問題進行了較為深入的研究,得出了一些有意義的結論。
  7. Finally, the stress and strain distributions of dam foundation in which there have glacis weak surfaces are studied by means of nonlinear fem. with deducing parameters of weak surfaces gradually, stability of the dam against deep sliding is verified. therefore safety of dam and foundation would be estimated

    5 、運用非線性有限元法研究了東張水庫重力壩含有緩傾角軟弱夾層的壩基應力、應變情況,用逐步降低夾層材料參數的方法核算大壩的抗滑穩定,以此評價大壩及壩基的安全性。
  8. The mechanical genesis of the complicated rock mass is because several times of tectonism in pro - period made the structure of rock mass in the right dam foundation damaged seriously and rock mass alteration made its mechanical character more anisotropy. after that the fractures in the right dam foundation slope were stretched at the beginning of the quaternary period because in the period yakouhoushan mountain quaquaversal dome was blowups quickly. at the same time, the valley trenching of lancang river reach to 800 - 1000 meter in altitude at the right bank in nuozadu dam site

    導致右岸巖體復雜化的成因是,右岸巖體在早期遭受了多期構造作用和巖體蝕變的基礎上,第四紀早期丫口後山穹隆的快速隆起與當時河谷下切至800m 1000m高程這一特殊因素組合引起了右岸巖體沿原有的斷裂(裂隙)張開,使地下水等風化營力能夠到達坡體較深部位,經過長期的風化卸荷作用,形成了右岸復雜巖體。
  9. Study on seepage stability of a gravity dam foundation

    某水庫壩基滲透穩定性研究
  10. Past investigation found the rock in the right dam foundation composing of granite ( _ 4 ~ 3 _ 5 ~ 1 ) in dyas - trias, which has a very complicated mechanical environment. the complicated phenomenon is as follows : tectonism, alteration, rock mass demobilize, rock mass stress release and other factors. because of this several weakness rock zones and a loosen rock mass zone are develop in the right dam foundation

    前期的調查表明其右岸巖體力學環境復雜,表現為:構成右岸壩基(肩)巖體主體的二迭三迭紀花崗巖( _ 4 ~ 3 _ 5 ~ 1 )受構造變動、蝕變、風化卸荷等因素的影響形成了壩基軟弱巖帶和壩肩上部卸荷鬆弛巖體。
  11. In the dam foundation restraint area, mgo can be mixed into concrete to prevent dam longitudinal crack. research on autogenous volume change of rcc mixed with mgo, and research on thermal stress compensation of darn foundation prove that rcc mixed with mgo plays a role in dam crack control

    在材料措施方面,深入研究高碾壓混凝土壩基礎約束區採用外摻mgo措施,利用其微膨脹性能補償壩體降溫過程中產生的溫度應力,以防止大壩縱向裂縫的發生。
  12. The article discusses the strength analytical method of soil body dynamic stability apply to evaluate foundation liquescence of embankment dam combine with shock liquescence of dam foundation blanket sand layer about hada mountain project

    本文結合哈達山工程設計中壩基沖積砂層的震動液化問題,探討了土體動力穩定性的強度分析方法在評價土壩壩基液化中的應用。
  13. In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up. secondly, based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model, the final dewatering scheme was put forward. at last, the final dewatering scheme was appraised by observation during the construction, and it satisfied with the construction request

    本文主要通過壩基現場抽水試驗試驗資料整理,在揭示黃土壩基降水特性規律的基礎上,確定可以反映現場抽水條件的的實用降水計算模型和參數;再根據現場抽水條件試驗開發的成井技術和計算模型計算壩基和壩肩兩個水文地質單元的降水井方案,並按工程類比法確定最終的降水方案;最後,通過施工過程中的觀測情況對降水方案進行評價,降水方案能夠很好地滿足施工的要求。
  14. Inspection of xiluodu hydroelectric power station dam foundation consolidation grouting test

    溪洛渡水電站壩基固結灌漿試驗檢測
  15. Test process of consolidation grouting without ballast in dam foundation of goupitai hydropower station

    構皮灘水電站壩基無蓋重固結灌漿試驗工藝
  16. The cutoff wall near the dam axis, the consolidation grouting and the curtain grouting for the foundation, and the high pressure jet - grouted cutoff wall at the toe of the dam form a vertical anti - seepage system for the dam foundation

    大壩軸線附近的防滲墻、基巖固結和帷幕灌漿,以及上游壩腳處的高壓擺噴防滲墻,在壩基構成了垂直防滲體系。
  17. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  18. The jet - grouting has little change to dam structure. its construction is simple and lower cost, it has evident advantage to form dam foundation diaphragm - wall

    高噴灌漿技術對壩體的原結構影響較小,施工較簡單,工程造價相對較低,對病險壩防滲加固具有較明顯的優越性。
  19. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪水電站壩基深厚砂卵石覆蓋層鉆探取芯的現場試驗,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵漏、懸浮排除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地質鉆探對取芯質量的要求。
  20. Its dam foundation grout curtain and backfilling technologies are advanced

    在大壩基礎工程帷幕灌漿、回填技術上處同行之首。
分享友人