  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. The dam is 50 metres in height.

    壩高五十米。
  3. The project is 156 m dam height, 877 m normal impounded level and 760 mw installed capacity. minjiang river benches almost conversely in shajinba reach and makes the right bank a thin and weak ridge, which is a syncline geological structure

    岷江在沙金壩河段形成一個近180的河曲,使右岸形成三面被河曲圍抱的條形山脊,構造上為一完整沙金壩向斜,工程區水工建築物都布置在右岸山脊內。
  4. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁剖面和壩體中心縱剖面的溫度等值線圖、拱冠梁剖面和壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱壩的設計和施工中採取相應的溫控措施提供了參考依據。
  5. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  6. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於成果分析,本文僅給出施工期每年2 、 5 、 8 、 11月份和運行期第1 、 5 、 10 、 20 、 30年的溫度等值線圖,壩體不同高程典型點溫度和應力歷時曲線圖,最大應力沿壩高分布圖,逐月最高、最低溫度和最大拉應力值及相應的位置等。
  7. The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall. the height of the dam apices is 4261. 3m and the maximal height is 76

    滿拉水利樞紐工程攔河壩為寬級配礫質土心墻土石壩,壩頂高程4261 . 3m ,最大壩高76 . 3m 。
  8. Citing five - meter - high nanfei river rubber dam in hefei, one of the highest double - anchor water rubber dam in china as an example, while deeply analyzing some representative rubber dam projects in china, the article theoretically exploits the relationships among some technical parameters such as anti - pull intensity, internal pressure ratio, circum - oriented relative extending rate, etc. also has the author brought up his own opinion on rubber dam design & calculation theory, which is of high theoretical and applicative value for parameter optimization and combination of water rubber dam with a height of above 3. 5 meters. it also helps when building over - five - meter - high rubber dam using seamless rubber dam and rubber dam with steel wire as its frame. this article also exploits safety measures for designing & building rubber dam in navigation areas

    本文以充水式雙錨固橡膠壩目前國內最高(壩高5m )之一的合肥市南淝河橡膠壩工程為例,並在對全國目前已建橡膠壩代表工程進行深入分析的基礎上,對壩袋的抗拉強度、內壓比、環向相對伸長率等技術參數之間的關系進行了理論探討和研究,並對橡膠壩設計計算理論提出了自己的見解和看法,對指導設計壩高3 . 5m以上的充水式橡膠壩技術參數的優化組合具有重要的理論和應用價值,特別對應用無搭接縫橡膠壩、鋼絲網骨架橡膠壩建造壩高大於5m的橡膠壩具有指導意義。
  9. The scale and height of rolling - concrete are spread increasingly, such as the technique studied recently that the 300 meters high gravity dam and the 200 meters high arch dam, which requires more experience in the damming technique, construction crafts and mechanization

    目前,碾壓混凝土壩的規模和高度正在日益擴大, 300m級的碾壓混凝土重力壩和200m級的碾壓混凝土拱壩的研究正方興未艾,對碾壓混凝土築壩技術、施工工藝和機械化程度的要求也更高。
  10. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆蓋層上國內首座百米級的混凝土面板堆石壩。
  11. He stood full six feet in height, with noble shoulders and a chest like a coffer-dam.

    他身長足足有六英尺,雙肩寬大。胸部象個潛水箱。
  12. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  13. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m, the volume of asphalt concrete core of 5x104m3

    最近建成的天荒坪抽水蓄能電站上庫瀝青混凝土防滲面板和正在建設的壩高104m 、瀝青混凝土心墻方量達5萬多m ~ 3的長江三峽水利樞紐茅坪溪防護壩工程,施工工藝和施工機械化程度已達到或接近國際先進水平。
  14. Another hidden danger is the weakening of the impervious ability of the dam resulting from the closeness of the height of line seepage of the reservoir water level to the contact plane between the residual solum, talus solum and basement rocks

    水庫水位浸潤線標高和殘坡積土與基巖接觸界面標高較接近,而使此高程的防滲能力更加薄弱,這也是此壩體的隱患之一。
  15. The dam protected height is determined as 15m higher above reservoir water level during initial reservoir impounding period in order to preventing surge damage caused by landslide

    李家峽水電站壩前號滑坡屬有蠕滑活動的老滑坡,體積為1845 104m ~ ,為預防滑坡涌浪危害,初期蓄水期間壩前設防高度15m 。
  16. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  17. Under the consideration of the engineering geological condition of dahuashui hydropower station, the pre - splitting blasting technology and reasonable construction method are adopted for the excavation of the dam foundation in accordance with the analysis on the rock strata therein, in which the design of the blasting parameters and powder charging structure as well as the angle control and the height of the excavating steps are particularly determined, and then better splitting effect is got for the slope excavation and the quality requirement of the construction is satisfied as well

    摘要結合大花水水電站大壩工程地質條件,通過分析巖層具體情況,採用預裂爆破施工技術,合理施工方法進行壩基開挖,並對爆破參數和裝藥結構的設計,鉆孔的角度控制和梯段高度精心確定,使該邊坡開挖預裂取得良好的效果,保證了壩基開挖的質量要求。
  18. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
  19. Nuozadu hydro - electrical power station, which is 261. 5 m dam height and 5, 850 mw installed capacity, is planned to build on the middle - lower reaches of lancang river near shimao city, yunnan province. it is planned to adopt rockfill dam and underground powerhouses in the left bank. the underground cavities mainly include three large cavities

    瀾滄江糯扎渡水電站擬建壩高261 . 5m ,裝機容量5850mw ,採用左岸地下發電系統,由主廠房、主變室、尾水調壓室以及尾水洞等構成龐大而復雜的地下洞室群。
  20. Numerical analysis of seepage field in mijiangou tailings dam to be designed to increase the dam height

    米箭溝尾礦壩加高方案滲流場數值分析