dam outlet 中文意思是什麼

dam outlet 解釋
水壩排水閘
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • outlet : n. 1. 出口,出路;排水口;通風口。2. 【商業】銷路。3. 批發商店。4. 發泄(情感)的方法;排遣。5. 地方廣播電臺[電視臺]。
  1. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高壩水電站正在建設或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  2. The method of hydraulic calculation with non - pressure flow from the outlet pipe of the warping dam

    淤地壩涵管無壓流水力計算方法
  3. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及混凝土澆筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩碾壓混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。
  4. Study on stress variation around deep outlet for danjiangkou dam heightening

    大壩加高試驗溫度應力模擬計算與原型監測對比分析
  5. Abrasion resistance and cavitation preventive of bottom flood - discharge outlet of fenghe second reservoir dam

    汾河二庫大壩泄洪底孔抗磨及防氣蝕措施
  6. The construction scheme is briefly introduced herein, and furthermore, the diversion structures, the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the stage 2 diversion are described as well

    文中對該方案進行了簡要介紹,並介紹了有關導流建築物,以及二期縱向混凝土圍堰堰基覆蓋層採用了沉井群等綜合處理方案和二期導流採用的底孔加缺口聯合泄流方式。
  7. Analysis and prediction on diversion ratio of bottom diversion outlet of tgp dam

    導流底孔分流比的分析和預報
  8. 4 ) three - dimensional nonlinear analysis of the bottom outlet of the xiao wan arch dam is presented using sub - model techniques. the structural characteristics and failure mechanism of the bottom outlet, under loading of concrete deadweight, hydraulic pressure, internal water pressure and temperature are studied. it is shown that the meshing of the structure becomes easy and the computing time is reduced by using sub - modeling method

    4 )對小灣拱壩的1 ~ #底孔進行了三維非線性分析,研究了孔口在壩體自重、庫水壓力、孔內水壓力和庫水溫度影響等作用下的孔口應力分佈、混凝土開裂、裂縫發展規律以及配筋對孔口開裂和裂縫擴展的影響。
  9. Microconcrete structural model test on the outlet - structure inside the dam

    壩內孔口結構的微混凝土結構模型試驗
分享友人