dam up 中文意思是什麼

dam up 解釋
擋起
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • up : adv (superl uppermost )1 向[在]上,向[在]上面;向[在]被認為處于上方的地方或方面〈如河流的源頭,...
  1. After like near future arrowroot continent dam flies a shop sign afresh go situation and to the limit of one ' s capacity rises should notice early days goes situation, if be pulled considerably, magnify again quantity, be about vigilance is banker shipment ( this time may be a few longer, banker is sucked prepare time to grow more, shipment time is long ), island visitting extensive region goes situation ( be about in first time to the limit of one ' s capacity first shipment ) if early days is to pass dish of full share, ( at present the individual thinks to have treasure new the sources of energy ) in the to the limit of one ' s capacity when breaking through strong line or resistance line but follow - up, that ability is really true the quantity adds valence to rise dropping is not must to the limit of one ' s capacity, and shrink the volume drops consequence is more serious, because early days banker already gave money, basically be, use odd amount to be bungled again dish, medicinal powder door meet disastrous

    如近期葛洲壩重新開牌后的走勢而放量上升要注重前期走勢,假如大幅拉升后再放大量,就要警惕是莊家出貨(這個時間可能比較長一些,莊家吸籌時間越長,出貨時間就長) ,看看寰島走勢(在第一次放量就要先出貨了)假如前期是經過盤整的股票, (目前個人認為有寶新能源)在突破勁線或阻力線時放量就可跟進,那才是真真正正的量增價升下跌不是一定要放量,而縮量下跌後果更嚴重,主要是因為前期莊家已出完貨,利用剩餘數量再砸一下盤,散戶就會損失慘重!
  2. Money has poured in for the construction of the three gorges dam, downriver in neighbouring hubei province, and the relocation of hundreds of thousands of people displaced by the reservoir that stretches up to chongqing city itself

    在相鄰的下游省份湖北,大量資金湧入,用於建設三峽大壩,以及用於安置因蓄水而不得不搬遷的局面。
  3. Look from the vertical section plane, project two have not the delta conformation of fill up. project one lost the effectual contains of reservoir. in opposition, project two lost the dead contains. during the experiment of the local former in front of the dam, the quantity of the sandiness out the reservoir appears that lot of sandiness passed the bottom hole and little passed the electricity plant and the water gap

    方案二與初設方案運用對比,方案二淤積總量明顯減少,從淤積縱剖面看,方案二無明顯三角洲淤積形態,而初設方案運用30年淤積形態具有明顯的三角洲淤積形態,從庫容變化看,初設方案運用主要損失有效庫容,而方案二則相反主要損失死庫容。
  4. In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up. secondly, based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model, the final dewatering scheme was put forward. at last, the final dewatering scheme was appraised by observation during the construction, and it satisfied with the construction request

    本文主要通過壩基現場抽水試驗試驗資料整理,在揭示黃土壩基降水特性規律的基礎上,確定可以反映現場抽水條件的的實用降水計算模型和參數;再根據現場抽水條件試驗開發的成井技術和計算模型計算壩基和壩肩兩個水文地質單元的降水井方案,並按工程類比法確定最終的降水方案;最後,通過施工過程中的觀測情況對降水方案進行評價,降水方案能夠很好地滿足施工的要求。
  5. This article deals with the analysis carried out in association with measured creep process before and after initial dam impoundment when landslide occurs, which suggests that the landslide undergoes both acceleration and deceleration procedures as the water level increases and ends up with retarded creep state after the water level is in stabilized status

    本課題對滑坡初期蓄水前後實測蠕滑過程進行了分析,證明滑坡在水位上升過程中經歷了加速和減速過程,水位穩定后進入減速蠕變狀態。
  6. Is it not the purpose of meditation to dam up the energies on the higher levels, or to push them back and up, so as to enable the higher levels to prosper also

    冥想的目的莫非將能量聚集於上層,或者將下游的能量逆推而上,好讓上層得以繁榮?
  7. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。
  8. The segments up from dam no. 3 with the excellent temperature regimes, various habitat types and satisfactory tree coverage can be classified as superior habitats for the formosan landlocked salmon

    三號壩以上無論是水溫、棲地類型豐富度、罩蓋度均可歸類為良好棲地,建議持續上游放流工作,擴大上游族群。
  9. Citing five - meter - high nanfei river rubber dam in hefei, one of the highest double - anchor water rubber dam in china as an example, while deeply analyzing some representative rubber dam projects in china, the article theoretically exploits the relationships among some technical parameters such as anti - pull intensity, internal pressure ratio, circum - oriented relative extending rate, etc. also has the author brought up his own opinion on rubber dam design & calculation theory, which is of high theoretical and applicative value for parameter optimization and combination of water rubber dam with a height of above 3. 5 meters. it also helps when building over - five - meter - high rubber dam using seamless rubber dam and rubber dam with steel wire as its frame. this article also exploits safety measures for designing & building rubber dam in navigation areas

    本文以充水式雙錨固橡膠壩目前國內最高(壩高5m )之一的合肥市南淝河橡膠壩工程為例,並在對全國目前已建橡膠壩代表工程進行深入分析的基礎上,對壩袋的抗拉強度、內壓比、環向相對伸長率等技術參數之間的關系進行了理論探討和研究,並對橡膠壩設計計算理論提出了自己的見解和看法,對指導設計壩高3 . 5m以上的充水式橡膠壩技術參數的優化組合具有重要的理論和應用價值,特別對應用無搭接縫橡膠壩、鋼絲網骨架橡膠壩建造壩高大於5m的橡膠壩具有指導意義。
  10. Do not try to remove any foreign body which is inserted deep into the wound. place gauze with a hole in the middle over the wound and apply a ring pad around the foreign body or surround the wound with dressing built up like a dam before finishing up with bandage

    然後按照沒有異物的方法處理切勿拔出深入傷口的異物,可在敷料上剪個洞,套過異物,置於傷口上,加上環形墊或在傷口周圍砌起敷料成堤狀,再用繃帶包紮。
  11. According to the law of mass action, the law of mass conservation and the principles of chemical thermodynamics, mathematics model about components " modes of occurrence ( that is simple ions, complex anions and complex compounds ) and their concentration in dam foundation solution has been set up with balance constant method

    本文根據質量作用定律、質量守恆定律和化學熱力學的基本原理,應用平衡常數法建立了地下水水質組份存在形式(即單一離子、絡陰離子和絡合物)及其濃度分佈的數學模型。
  12. On one hand, technological difficulty exists in determining the number and flood routing for dam system. on the other hand, for dam system security and stability, single dam ’ s designing should take flood control standard of dams, hinge composing, building sequence as well as years of filling up into account

    一方面壩系整體調洪、數量的確定技術難度大,另一方面,小流域壩系中單壩的設計必須綜合考慮上下游壩的防洪標準、樞紐組成、建設順序、淤積年限等情況,才能保證壩系的安全和穩定。
  13. At the stage of comparison of drafts, according to the fact of water resources in laiwu city, and the case of the water replenished together with used in qiaodian reservoir, it analyses that the water level heightened is necessary and feasible. it sums up an easy, rational and facile means that can be generalized in water design units at grass roots, according to choosing a best scheme by fuzzy comprehensive judgement. in the course of designing engineering, it has obtained the results such as the seepage of dam bottom, verifying the safety of dams, and the design of reinforcement, so that it ensures the safety on the engineering, and achieves the aims of prospective

    在方案論證階段,根據萊蕪市水資源狀況及喬店水庫來水用水情況,分析了抬高興利水位的必要性和可行性,採用模糊數學綜合評判的方法,總結探討出一種簡單合理,易於操作,在基層水利設計單位具有一定推廣價值的方案優選辦法;在工程設計中,主要對大壩壩基滲漏,大壩安全校核及加固設計進行了計算,並對大壩加固設計進行模糊優選,保證了工程安全,達到了預期的目的。
  14. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在梯級開發河流上應實施從施工洪水控制到施工洪水管理的觀念轉移;高壩大庫工程的初期、中期、後期三個時段的施工洪水設計標準應根據庫容等指標逐步抬高。
  15. The research of system makes the observational information of tongbo dam realize standardization manage, tidy up and analyze the information quickly and exact, give the environmental physics number and diagnostic numer of displacement, stress and seepage, build the mathematical model of each observational information, evaluate the working modality of the dam, thereby ensure safe working of the dam

    系統的研製使桐柏抽水蓄能電站的觀測資料實現規范化管理,快速、準確地整理、分析觀測數據,給出環境物理量及位移、應力和滲流等觀測效應量的特徵值,建立各觀測效應量的數學模型,分析評估大壩的工作形態,從而保證大壩的安全運行。
  16. The unavoidable flooding of villages occurred when authorities opened sluice gates at a dam on guangdong ' s hanjiang river because water there was building up to too high a level, it said

    報道稱,由於廣東韓江水位過高,當地政府開啟了一座水壩的泄洪閘,從而不可避免地淹沒了這些村落。
  17. In the second part, we choose four stations on the basin which up the long - tan dam - site, and estimate a multidimensional auto regression model to model the daily discharge. then test the model and the simulate effect of the modified flood series

    第二篇中選擇龍灘壩址以上流域的四個站,通過建立多維自回歸模型對其日流量進行隨機模擬,然後對模型和模擬生成的洪水系列進行模擬效果檢驗。
  18. The technique of dam construction by weakly expansive concrete added with magnesia ( wecam ) is a new technique developed in china, in which appropriate light - burnt magnesia is added to dam concrete when produced to generate a special delayed expansive stress to compensate shrinking stress due to decrease of temperature so as to prevent concrete cracks. it not only is in favor of simplifing the method of temperature control and an effective solution to the crack problem of concrete dam, but also simplify the technology of dam construction and bring down the project cost, further more, speed greatly up the construction of concrete dam

    外摻氧化鎂微膨脹混凝土築壩技術是指在生產大壩混凝土時,摻入適量的輕燒氧化鎂,利用其特有的延遲膨脹補償混凝土壩的溫度應力,以防止混凝土壩產生的裂縫,這不僅有利於簡化溫控措施,有效地解決混凝土壩的開裂問題;而且簡化了施工工藝,降低了工程造價,大大了加快施工進展。
  19. Secondly, to analyze seismic response of the concrete gravity dam, subspace iterative method was applied to compute free vibration period of the dam, time integration method was built up for the seismic time history analysis and formulation of coupled vibration of reservoir water and dam were also deduced

    其次,針對混凝土重力壩的地震響應分析問題,採用子空間迭代法計算了大壩的自振周期,建立了地震時程分析的逐步積分方法,並且推導了庫水和壩體耦合振動的理論公式。
  20. In 1975, a dam collapse in henan province killed tens of thousands or more, an incident that was covered up until recently

    1975年,中國河南某個水壩垮塌事故釀成萬人以上喪生的慘劇,而這件事直到最近才被公諸于眾。
分享友人