date of discharge 中文意思是什麼

date of discharge 解釋
卸貨日期
  • date : n 1 日期。2 時期;時代,年代。3 〈美口〉(和異性的)約會;〈美俚〉約會的對象。4 〈口語〉同日;本...
  • of : OF =Old French 古法語。
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  1. When the ship is condemned or does not proceed to her original voyage, fuel and stores consumed and port charges shall be admitted as general average only up to the date of the ship ' s condemnation or of the abandonment of the voyage or up to the date of completion of discharge of cargo if the condemnation or abandonment takes place before that date

    如果船舶報廢或不繼續原定航程,認作共同海損的燃料、物料和港口費用,只應計算至船舶報廢或放棄航程之日為止;如果船舶在卸貨完畢以前報廢或放棄航程,則應計算至卸貨完畢之日為止。
  2. When the ship is condemned or does not proceed to her original voyage, the wages and maintenance of the master, officers and crew and fuel and stores consumed and port charges shall be admitted as general average only up to the date of the ship ' s condemnation or of the abandonment of the voyage or up to the date of completion of discharge of cargo if the condemnation or abandonment takes place before that date

    如果船舶報廢或不繼續原定航程,認作共同海損的船長、高級船員和一般船員的工資、給養和消耗的燃料、物料和港口費用,只應計算至船舶報廢或放棄航程之日為止;如果船舶在卸貨完畢以前報廢或放棄航程,則應計算至卸貨完畢之日為止。
  3. Date of completion of discharge

    卸訖日期
  4. When the ship is condemned or does not proceed on her original voyage, wages and maintenance of the master, officers and crew and fuel and stores consumed shall be admitted as general average only up to the date of the ship ' s condemnation or of the abandonment of the voyage or up to the date of completion of discharge of cargo if the condemnation or abandonment take place before that date

    如果船舶報廢或不繼續原定航程,認作共同海損的船長、高級船員和一般船員的工資、給養和消耗的燃料、物料,只應計算至船舶報廢或放棄航程之日為止;如果船舶在卸貨完畢以前報廢或放棄航程,則應計算至卸貨完畢之日為止。
  5. The paper analyze many methods of water demand prediction which include many up to date methods and some in common use, and it bring forward some new combinatorial methods which can meet the need of optimization model in precision, such as season exponent, auto adapt filter, season exponent combined grey model, etc. based on the cost and time of modeling jt mainly study the macroscopic network model which describes the correlation between nodal pressures and water plant discharge

    針對時用水量預測模型,採用季節指數法、自適應指數平滑法、季節指數聯合自適應過濾法、指數平滑聯合自回歸法、季節指數聯合灰色系統法等具體預測方法,其中數種方法預測精度達到工程要求。實踐結果表明,開發的聯合法效果較好。考慮到管網宏觀模型不但能描述整個管網的工作狀態,而且建模所需成本低,運行速度快,省時省力,主要研究了管網宏觀模型的建立方法,分析測壓點布置原理並編製程序。
  6. History includes duration of symptoms ; relation of symptoms to menses and pregnancy ; presence and type of pain, discharge, and skin changes ; use of drugs, including hormone therapy ; personal and family history of breast cancer ; and date and results of last mammogram

    病史詢問包括癥狀持續時間,癥狀與月經和妊娠的關系,是否疼痛、有排泄物、皮膚變化及類型,用藥(包括激素)情況、個人及家庭乳腺癌史、最後一次乳房拍片時間及結果等。
  7. In the event the account has had a default of payment lasting over 60 days the data may be retained by the credit reference agency until the expiry of five years from the date of final settlement of the amount in default or five years from the date of discharge from a bankruptcy as notified to the bank, whichever is earlier

    假如該賬戶有拖欠還款逾60天的紀錄,信貸資料機構可以保留有關紀錄,直至欠款悉數清償之日起計滿5年為止,或銀行接獲解除破產令生效日期起計滿5年為止,以較早發生者為準。
  8. Seller to notify buyer within 3 days after completion of loading giving details number, name of commodity, gross weight, loading date, name of vessel, approximate invoice value, and etx at discharge port

    賣方應于貨物裝載完成後三個工作日內通知買方,內容應詳細註明合約編號,商品名稱,毛重,裝運日期,船舶名稱,發票概約值,到達卸貨港的預估日。
  9. In this paper a date from some real projects are used to analyse the facors that will affect the energy dissipation and erosion prevention. such as flood discharge across the cofferdam, crest elevation, downriver cofferdam, roughness coefficient and the gradient of the surface of dam, and so on. in this paper, the program based on hydraulics is checkout by the tankeng waterpower project in zhejiang. the results prove that this program can be used to design any project where there is no obvious side shrinking phenomena

    本文結合工程實際對影響圍堰和壩體消能防沖的各種因素,包括過堰流量、壩面高程、下游圍堰堰頂高程、壩面糙率、壩面坡度等進行了分析,並藉助水力學知識和計算機語言編寫了圍堰和壩體的優化計算程序,並利用浙江灘坑水電站工程對所提出優化計算程序進行了驗證,證明了該程序在沒有明顯的側收縮的影響下,計算結果與實際情況較為吻合。
  10. This discharge may state that it becomes effective when the contractor has received the performance security and the outstanding balance of this total, in which event the discharge shall be effective on such date

    該結清單可註明,只有在全部未支付的余額得到支付且履約保證退還給承包商當日起,該結清單才能生效。
分享友人