days for construction 中文意思是什麼

days for construction 解釋
工期
  • days : 戴斯
  • for : FOR f o r = free on rail 【商業】火車上交貨(價格)。1 〈表示目標、去向〉向,往。 leave [sail] f...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance

    通過試驗研究認為:玻璃纖維瀝青碎石的技術性能不如瀝青碎石好,但路用彈性性能較好,如能解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其路用性能仍值得探討,瀝青橡膠碎石結構層具有變形性能和抗裂性能良好,空隙率小,防水性能好,熱穩定性較好,施工工藝簡單的特點,因此,瀝青橡膠碎石是二級及二級以下公路因疲勞而開裂的瀝青路面的良好罩面材料,也是防止半剛性基層收縮裂縫反射的良好結構措施,在瀝青類路面面層和半剛性基層之間夾鋪瀝青橡膠碎石薄層,雖然造價比夾鋪土工布高,但其施工工藝,抗裂性能和防水性能均優于土工布,不僅可以大大減少半剛性基層材料的反射裂縫,延長路面使用壽命,而且可能適當減薄瀝青混合料面層的厚度,雖然初期造價有所增加,從長遠來看,具有十分重要的技術和經濟意義。
  2. The construction bank card that you want to take you and id arrive open an account to fill in all right a piece of registration form that applies for to open the bank on the net, the bank on construction bank net is landed to download individual safety certificate inside 7 days after been deal with, in order to ensure the net hands in easy security, the system can hint you download individual safety certificate automatically, download please and appropriate is custodial certificate of good individual safety, if your individual certificate loses when your reshipment system, so the bank on your net with respect to invalidation, need to debut to the bank afresh

    你要帶上你的建行卡及身份證到開戶行填寫一張申請開通網上銀行的登記表,辦理好了之後就在七日內登陸建行網上銀行下載個人安全證書,以確保網上交易的安全性,系統會自動提示你下載個人安全證書,請下載並妥善保管好個人安全證書,假如你的個人證書在你重裝系統時遺失的話,那麼你的網上銀行就失效了,需重新到銀行開通。
  3. Article 29 the unit in charge of a construction project which may produce environmental noise pollution due to the use of machines and other equipment, must report, 15 days before commencement of construction, to the competent administrative department for environmental protection of the local people ' s government at or above the county level the name of the project, the construction site, the length of time needed for completion of the project, the possible level of environmental noise and the measures taken for prevention and control of such pollution

    第二十九條在城市市區范圍內,建築施工過程中使用機械設備,可能產生環境噪聲污染的,施工單位必須在工程開工十五日以前向工程所在地縣級以上地方人民政府環境保護行政主管部門申報該工程的項目名稱、施工場所和期限、可能產生的環境噪聲值以及所採取的環境噪聲污染防治措施的情況。
  4. The building workers said that they must work diligently and painstakingly, with great ambition and lofty aspiration, for 300 days, in order to complete the construction task of the expressway within this year

    建築工人們表示,一定要樹雄心、立壯志,大幹、苦幹300天,力爭在今年年底,完成高速公路的建設任務。
  5. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江的1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊的地理區位條件和極具代表性的船舶交通管理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段的船舶交通管理探索和實踐。 1984年11月15日當時的長江航政管理局在長江尹公洲水域率先施行交通管制;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通管制段建立現代化交管系統的可行性論證; 1990年大沙雷達站? ?內河第一座雷達交管站建成,摸索實施現代化雷達交管的船舶交通管理新途徑; 1997年長江下游南京至瀏河口船舶交通管理系統建成聯網投入正式運行,同時將大沙交管雷達信號通過光纜傳輸至交管中心,統一實施全轄區船舶交通管理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監控系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  6. The company serves content around project early days, metaphase, later period each phase, cover earth to build, each major such as adornment, installation, municipal, gardens, traffic, irrigation works ; especially : service of representative of invite public bidding permeates reconnaissance, design, inspect manage, construction, equipment, material, purchase wait for each domain ; cost seeks advice use current the most advanced tsinghua si weier is three - dimensional system of software calculating an amount, control to the project executes the spot to be mirrorred in real time and undertaking cost dogs ; the adroitness in project management uses fidic term and conditions of contract, the mature construction on international project management pattern introduces in management of domestic construction project ; company of software of subordinate path be in harmony is with advanced science and technology rely on, foot of client of prep close behind leads the market, dedicated the development at project software, apply with promotion

    公司服務內容圍繞工程建設前期、中期、後期各階段,涵蓋土建、裝飾、安裝、市政、園林、交通、水利等各專業;特別是:招標代理服務滲透到勘察、設計、監理、施工、設備、材料、采購等各領域;造價咨詢採用當前最先進的清華斯維爾三維算量軟體系統,對工程實行現場實時反映並進行造價跟蹤控制;項目管理中熟練運用fidic合同條件,將國際上成熟的建設項目管理模式引入到國內建設項目管理中;下屬道融軟體公司以先進科技為依託,緊隨客戶步調引領市場,專注于工程建設軟體的開發、運用與推廣。
  7. Recent days, the study group from sigapore, companyed by shenyang bolinte s minister of international trade devision, came to the prospect for a checkout of the elevator weighter products. it is reported that the construction administration is looking for elevators updating for combination house

    近日,新加坡建屋局組屋電梯更新項目考察團在沈陽博林特電梯公司國際貿易部領導的陪同下,來前景光電技術有限公司考察稱重產品。
  8. Employees aged between 18 and 65, who have been employed in the catering or construction industries by an employer for 60 calendar days or more

    歲之雇員,受雇於飲食業或建造業,僱用期滿
  9. The construction departments shall finish teh authentication of planning within tow work days ; the land administrations shall finish the preliminary examination within two work days after accepting application, and finish the work of soliciting opinions of the other relative departments within four work days ; and the land administration shall finish the procedures for land use within 3 work days after the land use plan being approved

    建設部門在二個工作日內完成規劃論證;土地部門在受理用地申請后二個工作日內完成預審,並在四個工作日內完成徵求有關部門意見的工作;用地方案經批準后,土地部門在三個工作日內辦完用地手續。
  10. It is agreed and understood that the insurers shall only indemnify the insured for loss, damage or liability directly or indirectly caused to construction material by flood and inundation if such construction material does not exceed three days ' demand and the exceeding quantities are kept in areas not endangered by 10 - year floods

    茲經雙方同意,只有在被保險人的建築材料超過3天的用量,且超過此量的材料放置在最近10年未遭受洪水或水災侵害的地方的情況下,本公司對被保險人因洪水或水災直接或間接造成建築材料的損失及由此產生的責任負責賠償。
  11. “ the time intervals for societal needs in the developing countries are of the order of days, but in the developed countries the windows can be broader, even of the order of years, because the response can be one of marshalling resources to improve construction, for example

    「社會需要的時間間隔偏差,在發展中國家中為數天,而在發達國家的時間差帶可以寬一些,即便數年,因為對其做出的反應可以是動用大量資源改進建築。 」
分享友人