deck beam 中文意思是什麼

deck beam 解釋
【建築】上承梁。

  • deck : n 1 甲板,艙板;覆蓋物。2 【建築】平屋頂;橋面;【鐵路】客車車頂。3 〈俚語〉地面,地。4 〈主美〉...
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  1. Trunk - deck beam

    凸起甲板橫梁
  2. The box beam ' s temperature stress of longitudinal direction and transverse direction with different conformation are analyzed, it finds that there is largish temperature tensile stress in the bottom of top deck and the haunch of box beam increase temperature tensile stress in the bottom of top deck. the paper makes a study of different thermal effects resulted from several kinds of closed rigid frame

    根據大量實測溫度場結果建議採用一個有利於理論推導的指數函數的公式來擬和箱梁體內的溫差分佈,既貼近實測數值,計算又比較簡單;通過對空腹式剛架拱橋尤溪洲大橋所在地夏季、秋季、冬季的溫度場及溫度應力的實測,以及與本文所提出計算方法的理論解進行的分析比較,證實了本文計算方法的正確,同時改進了已往混凝土箱梁溫度自應力的計算方法。
  3. In the hogging condition, double bottom and the side shell remain the ultimate bucking strength, deck and upperwing tank remain the yield stress, and the other parts keep elasticity. then the key to calculate the ultimate strength of ship hull girders is to ascertain the ultimate bucking strength of the stiffened panels. in this regard, the developed formulation is designed to be more sophisticated than previous simplified theoretical method for calculating the ultimate strength of stiffened panels under combined in - plane bending and lateral pressure. fabricatio n - related initial imperfections ( initial deflections and residual stresses ) are included in the panel ultimate strength calculation as parameters of influence. all possible collapse modes involed in collapse of stiffened panels, including overall buckling collapse, column or beam - column type collapse, tripping of stiffeners and local bukling of stiffened web are considered

    確定了船體梁整體破壞時的剖面應力分佈之後,關鍵在於確定板架的極限屈曲強度。本文充分考慮了在縱向彎曲、橫向壓力作用下加筋板可能發生的幾種破壞模式,即板架的整體屈曲破壞、樑柱形式的破壞、筋的側傾、腹板的屈曲並同時考慮了初始焊接殘余應力、初撓度的影響,使其更精確的計算加筋板的屈曲強度。對于加筋板中加強筋腹板的局部屈曲,採用解析法推導出筋的腹板的撓度方程及其邊界條件,求解相應的方程,從而計算出腹板的局部屈曲應力。
  4. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用拱肋承擔壓力,系梁預應力束抵抗拱端推力,吊桿及縱橫橋面系結構承受橋面荷載,既克服了傳統拱橋巨大的拱端推力,又改善了連續梁橋較大的彎矩和剪力的受力狀況,最大限度地發揮了拱梁混凝土和預應力鋼筋各自的特點,經濟效益顯著。
  5. However, the cantilever beam ’ s concrete deck of this structure will be cracked easily at the negative moment region

    該結構懸臂挑梁根部混凝土板承受負彎矩,容易開裂。
  6. Finite element analysis on flexural loading capacity of composite slim beam with deep deck in the hogging moment region

    負彎矩區深肋組合扁梁抗彎性能的有限元分析
  7. A model with some parameters is used to forecasting the beam camber in the construction. based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed and so on working condition, the model parameters are identified by ann, and the beam camber of different sections are given

    建立施工預拱度的數學模型,根據施工時的預應力張拉后等工況橋面實測標高與設計值的差異,用bp神經網路識別預拱度模型的參數,確定有關各截面的預拱值。
  8. The task sets up calculation model of continuous beam on elastic support according to erection order of bridge deck differently, which embody reasonably load of every suspender

    本課題根據橋面施工順序分別建立吊索(桿)內力計算模型,合理的體現了各吊索(桿)的受力情況。
  9. Uss nimitz cvn - 68 2005 length overall : 332. 9m beam max : 76. 8m displacement : 91000 - 102000t the nimitz class aircraft carriers are the largest warships ever built. with over 6, 000 personnel, the carrier has a displacement of 102, 000t, and a flight deck length of 332. 9m

    美國海軍尼米茲號航空母艦cvn - 68 2005全長: 332 . 9米全寬: 76 . 8米排水量: 91000 - 102000噸美國海軍尼米茲級航空母艦是人類造船史上最大的戰艦。
  10. The paper sums up the construction technique of qinjiatuo super bridge in all : consolidating the soft ground foundation with vibrating & impacting macadam piles ; constructing the bored cast - in - place piles under the complex geological condition ; developing and researching cable - stayed handling basket with the bearing capacity of 3000kn ; beam construction ; construction technique of the new type bridge deck and dynamic & static load test

    本文全面總結了覃家沱特大橋施工技術:振沖碎石樁加固軟弱地基、復雜地質情況下鉆孔樁施工、承載力3000kn斜拉式掛籃開發與研製、梁部施工、新型橋面鋪裝層施工技術及動靜載試驗。
  11. Computer simulation of real time variational beam feature of double deck rectangle phase grating

    計算機模擬雙層矩形位相光柵的實時變分束特徵
  12. Via comparing chinese specification with aisc specification, some important factors that must involve in the design of floor system consisting of composite slab and composite beam are complemented. the two most important is the shape of formed steel deck that can be used in composite slab and the design shear strength of welded stud shear connectors

    在組合樓蓋體系設計中,筆者通過對中、美兩國規范、規程的對比,對在中國規范、規程中未曾明確提出卻需要在組合樓蓋設計中加以考慮的一些因素進行了說明,其中最主要的是壓型鋼板的選型依據和焊釘抗剪承載力的影響因素。
  13. The massive walking - beam rose and fell above the deck ; at one end a piston - rod worked up and down ; and at the other was a connecting - rod which, in changing the rectilinear motion to a circular one, was directly connected with the shaft of the paddles

    甲板上露出一根很長的蒸汽機杠桿,兩頭一高一低地不停活動,這根杠桿的一端聯接著活塞柄,另一頭聯著輪機上的曲軸,這樣就把杠桿的直線推動力轉變為直接推動輪機的動力,從而使輪軸不停地旋轉起來。
分享友人