deck up in 中文意思是什麼

deck up in 解釋
用. . . 裝扮起來
  • deck : n 1 甲板,艙板;覆蓋物。2 【建築】平屋頂;橋面;【鐵路】客車車頂。3 〈俚語〉地面,地。4 〈主美〉...
  • up : adv (superl uppermost )1 向[在]上,向[在]上面;向[在]被認為處于上方的地方或方面〈如河流的源頭,...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  1. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了迭代和累計的思想,將船舶的進水過程劃分為很多次進水的積累,詳細計算了運木船在破艙進水的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的裝載情況和在進水過程中船舶本身的傾斜對進水重心的影響,以及艙室內的進水量和木材對破口處進水速度的影響,船舶總的進水速度、進水量、首尾吃水、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該船舶在艙室內的貨物積載量達到某個數值時可以保證船舶在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。
  2. Vivi : dramamine ! just take it and trust me you ' ll be fine. let ' s go up to the deck and lying in the sun and forget about the motion sickness

    抗暈藥!服下它然後相信自己會沒事的!讓我們一起到上面的甲板上躺曬太陽然後忘記你的暈船
  3. In this emergency situation, which seemed like a scene from a movie, sister hsu began to pray for master s help, and meanwhile turned up the volume of master s tapes playing on her car s tape deck

    面對這彷如電影情節般的突發狀況,許師姊立即在心中祈求師父幫忙,並將車內正在播放的師父錄音帶的音量調大。
  4. Before studying the concrete composite deck pavement, we introduce the basic theory of touching analysis, and come up with the realization of touching analysis in the fem analysis considering the touch of concrete bridge cover plates, asphaltum concrete overlay with bridge cover etc. connect with the experiment on the spot of bridge, the software ansys is used to solidity modeling and analyzing an assembly simply supported bridge before adding overlap, after adding overlap etc., and study the influence of adding overlap on the underside bridge structures

    在進行裝配式混凝土簡支板橋復合鋪裝結構的探討性研究前,先介紹了接觸分析基本理論,並提出了考慮混凝土橋面板板間接觸、瀝青混凝土加鋪層與橋面接觸等接觸分析在有限元分析中的實現思路。結合一座裝配式簡支板橋現場試驗數據,採用ansys對該橋在加鋪前後進行了實體建模與計算分析,討論了瀝青混凝土加鋪層對下部結構物的影響。
  5. The squire, at this, would turn away and march up and down the deck, chin in air

    一聽到這個,鄉紳就會背過臉去,在甲板上走來走去,下巴翹上了天。
  6. 3. the effective width of the deck of the cable - stayed bridge is up to profound research because there is no exactly definition in the applicable design standards

    3 、由於現行的有關橋梁設計規范沒有對斜拉橋主梁的有效寬度做出具體規定,從而使斜拉橋在設計中橋面板的有效寬度取值問題有待于進一步研究。
  7. When this was done, and all safe upon deck, the captain order d the mate with three men to break into the round - house where the new rebel captain lay, and having taken the alarm, was gotten up, and with two men and a boy had gotten fire arms in their hands, and when the mate with a crow split open the door, the new captain and his men fir d boldly among them, and wounded the mate with a musket ball which broke his arm, and wounded two more of the but kill d no body

    他身邊有兩個船員和一個小聽差,每人手裡都有槍。當大副用一根鐵橇杠把門劈開時,那新船長和他手下的人就不顧一切地向他們開火。一顆短槍子彈打傷了大副,把他的胳膊打斷了,還打傷了其他兩個人,但沒有打死人。
  8. Or maybe that was a dream, too, and the awakening would be the changing of the watches, when he would drop down out of his bunk in the lurching forecastle and go up on deck, under the tropic stars, and take the wheel and feel the cool tradewind blowing through his flesh

    或者,連那也是一個夢,醒過來已是換班的時候,他得從顛簸的水手艙鋪位上翻下來,爬到熱帶星空下的甲板上去,去掌舵,讓涼爽的貿易風吹透他的肌膚。
  9. The jammed universal fairleader on poop deck to be freed up, regreased so as to make it work in good order

    艉樓甲板上卡住的萬向導纜器活絡,加油使之工作正常。
  10. T c tower, the tallest building in taiwan, has a 360 - degree observation deck on the 75th floor. visitors arrive on a direct elevator that zings along at speeds of up to 600 meters per minute

    直達七十五層的超高速電梯每分鐘速度可達六百公尺,從地面到觀景臺只要四十三秒,頗有雲霄飛車的感覺。
  11. In case of double deck buses, exterior side panels up to the windowsill of upper deck are to be removed instead of interior side panels

    如屬雙層巴士,則高度至上層窗沿的車身旁板必須拆除(車廂內的旁板則無須拆除) 。
  12. In case of double deck buses, exterior side panels up to the windowsill of upper deck are to be removed instead of interior side panels. ceiling panels of lower deck are also required to be removed

    如屬雙層巴士,則高度至上層窗沿的車身旁板必須拆除(車廂內的旁板則無須拆除) 。巴士下層的頂板亦須拆除。
  13. This paper set up a geological model of sliding mass by geological condition analysis and selection cross section of character representation of guishan sliding mass. the stability of sliding mass is calculated and evaluation under bench stoping and deck excavation in terms of six excavation schemes with limit equilibrium method. there dimensional finite element method is applied to study the stability of sliding mass to the deck excavation schemes by means of computer simulation and calculation

    通過對滑坡體工程地質條件的分析,選取滑坡體的代表性剖面建立了滑坡體的地質模型,選取極限平衡方法就滑坡體在臺階式開挖和整體開挖兩種不同開挖方式共6種具體開挖方案條件下,對滑坡體的穩定性進行了定量計算評價,提出臺階式開挖和整體開挖兩種不同開挖方式的的各開挖方案的比較結果,然後就確定的具體開挖方案開展三維有限元數值計算,並進行評價,以達到相互校核、相互驗證的目的,最後,確定出工程應用的開挖施工方案。
  14. Based on qualitative analysis and comparison of several options for suppressing transverse vibration on deck type steel plate girder of railway bridge, conclusions are made as follows : with static reinforcing, the vibration amplitude can be suppressed to some extent, but quasi - resonance of the bridge can not be avoided, moreover, the construction is inconvenient and costly. with option of two bridge connection, the effectiveness of vibration suppression is clear ( the damping ratio approaches 50 % ) and it is fairly economic and easy, however, the quasi - resonance of the bridge can not be avoided either. with dynamic option ( mtmd option ), the quasi - resonance of the bridge can be effectively avoided ( the damping ratio is up to 51. 38 % as tested in field ), moreover, the construction cost is low, and the construction is simply and convenient

    通過對目前抑制鐵路上承式鋼板梁橋橫向振動的幾種方案進行定性的分析和比較,認為:靜力加固方案可以使橋梁振幅有所減小,但不能避免準共振現象的發生,而且工程造價較高,施工也不方便;兩橋連接方案減振效果明顯(減振率近50 % ) ,比較經濟也比較方便,但同樣不能避免準共振現象的發生;動力減振方案( mtmd抑振方案)可以有效的抑制橋梁的準共振現象(現場試驗中減振率達51 . 83 % ) ,而且工程造價較低,施工簡單、方便。
  15. I could hear people tumbling up from the cabin and the foc s le ; and, slipping in an instant outside my barrel, i dived behind the fore - sail, made a double towards the stern, and came out upon the open deck in time to join hunter and dr livesey in the rush for the weather bow

    我能聽見人們跌跌撞撞地從特艙和水手艙里跑出來,於是我立即從蘋果桶里溜了出來,鉆到了前桅帆的下面,又轉身到了船尾,及時地跑到了開闊的甲板上,和亨特利弗西醫生一道沖到了露天的船首。
  16. The study shows that the deck excavation schemes is good than the bench stoping schemes by calculation of limit equilibrium method and the sliding mass to the excavation the slide up to el 790m is in stabilization under vii earthquake intensity with there dimensional finite element method by means of computer simulation and calculation.,

    研究結論是,從剛體極限平衡法的計算結果分析,臺階式開挖方案和整體開挖方案比較,整體開挖方案比較明顯要好於臺階式開挖方案。為了保證工程的安全性,同時兼顧工程開挖措施的經濟性,建議重點考慮開挖高程為790m的整體開挖方案。
  17. The paper sums up the construction technique of qinjiatuo super bridge in all : consolidating the soft ground foundation with vibrating & impacting macadam piles ; constructing the bored cast - in - place piles under the complex geological condition ; developing and researching cable - stayed handling basket with the bearing capacity of 3000kn ; beam construction ; construction technique of the new type bridge deck and dynamic & static load test

    本文全面總結了覃家沱特大橋施工技術:振沖碎石樁加固軟弱地基、復雜地質情況下鉆孔樁施工、承載力3000kn斜拉式掛籃開發與研製、梁部施工、新型橋面鋪裝層施工技術及動靜載試驗。
  18. The controlling of traffic noises has two ways in the thesis. first, the sonic source is limited and low - noise bridge deck pavement is suggested to use. second, the route of spread is controlled and acoustic barrier is set up, especially in the viaduct

    限制噪聲源,主要建議使用低噪音橋面鋪裝層;控制噪聲傳播途徑,主要採取的措施是設置道路聲屏障,尤其在城市高架橋上推薦使用。
  19. Standing triumph variation - in the hands triumph where the selected cards rise up out of the deck, before the deck is shown to be straightened out

    站在凱旋變異- -人的手凱旋而選定的崛起卡出了甲板,前甲板上表現得理順
  20. The massive walking - beam rose and fell above the deck ; at one end a piston - rod worked up and down ; and at the other was a connecting - rod which, in changing the rectilinear motion to a circular one, was directly connected with the shaft of the paddles

    甲板上露出一根很長的蒸汽機杠桿,兩頭一高一低地不停活動,這根杠桿的一端聯接著活塞柄,另一頭聯著輪機上的曲軸,這樣就把杠桿的直線推動力轉變為直接推動輪機的動力,從而使輪軸不停地旋轉起來。
分享友人