  1. Being lacking of understanding of behaviors of circular working shaft, the paper proposed theory about ring - beam ' s load - distribution calculations and analyzed the structural behavior of circular working shaft ( cws ) by the numbers from the standpoint of properties of structural style and stress incorporated with thoughts of shared load introduced to research of cws. first, regarding cws as structure of series of hypothetic horizontal circular rings and vertical beams, and considering cws ' s formation and development, the paper proposed load - distribution thoughts to solve cws ' s calculations. ring - beam calculation theory was put up and software cbtlmp1. 0 was worked out based on the conditions of external applied load shared by rings and beams, and of deformation conformity

    首先,本文提出用分載思想解決圓形工作井結構的計算分析問題,將圓形工作井結構看成是由一系列的假想的水平圓環和豎直梁組成的結構,考慮工作井形成過程及形成階段與項進階段的連續性,根據某一時刻相對于上一時刻外載增量由環與梁分擔、環與梁在交叉處變位增量一致的條件將環計算理論與梁計算理論結合起來,據此建立了環?梁分載計算理論並研製了環?梁分載計算分析軟體cbtlmpv1 . 0 。
  2. The content of this thesis, through the deformation destruction process of th e typical nanlidu landslide along the national highway 318, uses the finite unit a nalysis of computation, revealing the elastic, plastic stress and displacement of each joint inside the slide area pointing out the distribution range of the tension stress and the plastic deformation range, computering the stability safety factor of the slide area, gaining the fixed quantity, quota that evaluates the stability of the slide area, revealing the position of the slide area which is most likely to los e its stability, thus, it can provide theoretic proof for the programs which renova te landslides

    本文的研究內容是通過318國道南里渡典型滑坡的變形破壞過程,採用有限元計算分析,揭示滑體內部每個節點上的彈、塑性應力及位移,找出拉應力分佈區和塑性變形區,計算滑體穩定安全系數,得出衡量滑體穩定的定量指標,揭示滑體最可能失穩的部位,從而為滑坡整治方案提供理論依據。
  3. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  4. The non - uniform deformation behavours and the movement of the weld seams, the wrinkling of the workpieces and the methods to control the non - uniform deformation were investigated by adjusting the die structures, the blank holding method and the blankholding force distribution

    通過調整模具結構和壓邊方法及壓邊力分佈,對坯料不均勻變形規律及焊縫的移動規律、坯料的起皺規律及控制坯料不均勻變形的方法進行了探討研究。
  5. The two models of rigid and elastic piles have been discussed respectively, in which the anchor cable will be regarded as an elastic hinge. under the consideration of deformation harmony of anchor cable with piles bodies and pile bottom conditions, the solutions of the internal forces distribution along piles bodies are presented

    本文分別按剛性樁和彈性樁兩種物理模式,將錨索視為彈性絞支座,利用抗滑樁和錨索位移變形協調條件,計算出不同樁底條件下抗滑樁的內力分佈。
  6. Based on the systematic study on the coal - bearing strata in the dam region of some hydraulic key project, southwest of china, the paper disclosures the distribution of the discarded caves, analyses the engineering effects of the existence and the deformation of the discarded coal caves during the construction of the hydraulic key project and running of it

    摘要通過對西南某水利樞紐工程壩區煤系地層的系統研究,揭示了在壩區左右岸煤洞的展布特徵,結合工程,分析了煤洞的存在及其變形的工程效應。
  7. The influence of such parameters as axial load index, aspect ratio and percentages of lateral reinforcement, on seismic performance of reinforced concrete frame column in hong kong and analyses the distribution relationships of flexural deformation, shear deformation and slippage of longitudinal reinforcement in joint zone

    根據試驗結果,討論了軸壓比、配箍率、剪跨比等參數對其抗震性能的影響,分析了水平荷載作用時塑性鉸區的彎曲變形、剪切變形和縱向鋼筋粘結滑移變形所產生的位移在框架柱總水平側移中所佔的比例及其變化規律。
  8. According to the investigation of the huangtupo landslide area, the possibility of research for the prevention and control and the cognition of engineering management at the site in recent years, the paper studies on the distribution characteristic, material composition, stability and deformation characteristic of the landslide

    摘要文章根據幾年來從事黃土坡滑坡區的勘查、可研及現場工程管理的認識,從滑坡分佈特徵、物質構成、穩定研究、變形特徵等方面對滑坡進行研究。
  9. The load transverse distribution coefficient of test is in coincidence with the calculating hypothesis. prestress is linear distribution along the section height. the deformation of the section is according with the plane hypothesis

    通過對試驗結果與有限元計算結果的對比分析,得出結論如下: 1 、本文所測試的荷載橫向分佈系數符合計算假定;預應力沿截面高度分佈具有較好的線性關系,截面變形符合平面假設。
  10. All the results can be utilized by engineers, during the designing and construction. the main conclusions are listed as follows : ( 1 ) based on the shortest line between weak interbed and limit of excavation and the location of point of intersection between limit of excavation, classification of weak interbed distribution is set up, and the distance of distribution is defined ; ( 2 ) according to the strength and deformation equivalent principle, influence zone of weak interbed is introduced, and a new method to simulating the weak interbed with thickness is built ; ( 3 ) some quantificational results on influence of weak interbed respectively at crown, right shoulder and right wall are summarized ; ( 4 ) some quantificational results on influence of weak interbed with the distance between weak interbed and limit of excavation 0. 2d, 0. 5d, l. od are gained ; ( 5 ) some quantificational results on influence of weak interbed in the rock mass with confining coefficient 0. 38, 1. 0, 1. 5, 2. 0, 3. 0 are summed up ; ( 6 ) some quantificational results are summarized on influence of the underground surrounding rock mass stability with weak interbed, in the representational surrounding rock mass graded ii, iii, iv ; ( 7 ) according to the studying results some advices are suggested on designing of underground engineering

    主要結論如下: ( 1 )以軟弱夾層到開挖輪廓線最短距離和最短距離線與開挖輪廓線的交點位置為指標對軟弱夾層的分佈部進行了分類,並確定了軟弱夾層分佈距離; ( 2 )根據強度等效和變形等效的原則,引入了軟弱夾層影響帶的概念,建立了模擬軟弱夾層厚度的一種新方法; ( 3 )總結出了軟弱夾層分佈在拱頂、右拱肩、右邊墻時對地下洞室穩定性影響的量化指標; ( 4 )分析出了軟弱夾層距開挖輪廓線0 . 2d 、 0 . 5d 、 1 . 0d三種情況對地下洞室穩定性影響的量化指標; ( 5 )總結出了在不同的側壓力系數( 0 . 38 、 1 . 0 、 1 . 5 、 2 . 0 、 3 . 0 )地應力場中軟弱夾層對穩定性影響的量化指標; ( 6 )得出了在、 、代表性圍巖中軟弱夾層對穩定性影響量化結果; ( 7 )根據數值試驗成果提出了在有軟弱夾層圍巖中地下洞室設計原則的幾點新內容。
  11. The authors describe the modelling of a railway steel truss bridge with long - span in order to analyse the detailed distribution of stress for members and nodal plates in main truss, the detailed deformation and stress distribution due to frame effect on transversal bracing plane in truss bridge, and the detailed distribution of stress in important parts of the steel plate girder bridge with initially transversal deformation by using sseb in this article

    本文建立大跨鐵路鋼桁梁橋和鋼板梁橋全橋結構模擬分析數學模型,說明了鋼桁梁橋桿件和節點板詳細應力分佈、平面框架詳細變形與應力分佈和有變形缺陷鋼板梁橋重要部位應力的模擬分析結果等問題。
  12. In this paper, the deposition evolution process in qtx reservoir are studied, the incoming water and sediment, the operation data, and the time and space distribution of longitudinal and lateral sedimentation in reservoir are analyzed in detail, and the longitudinal scouring and sedimentation and lateral deformation law in reservoir tidal flat and mainstream under different operation way are summarized in every operation period

    本文以黃河青銅峽水利水電樞紐工程水庫淤積演變過程為研究對象,對青銅峽水庫來水來沙組成、水庫運行資料、水庫縱橫向泥沙淤積時空分佈等進行了較詳細的分析,總結了青銅峽水庫各個運行時期不同運行方式下水庫灘槽縱向沖淤和橫向變形規律。
  13. In order to make the camber design easier and keep contact pressure equal along rolls, we shall assume the pressure distribution to be quadratic along the width and the marginal deformation to be planar

    摘要為了使中厚板軋機輥型設計快捷且保持輥間各點接觸壓力相等,利用了壓力沿板寬方向呈二次分佈、板邊緣處變形為平面變形的計算處理,從而使輥型設計更為方便。
  14. Using gap elements to simulate the practical worki n g situation of a piston, a new finite element contact model is proposed both th e stress and deformation of the piston and the pressure distribution between the p iston and the pin are obtained the contact area and the pressure distribution v ary with the stiffness of the pin and the clearance between the piston and the p in

    該文使用間隙元模擬活塞的實際工作狀態,提出活塞的有限元接觸模型,不僅可以得到活塞的應力和變形,還可以計算出活塞與活塞銷之間的壓力分佈以及銷的剛度、銷與銷座的間隙變化對接觸區域的大小和壓力分佈的影響
  15. Abstract : using gap elements to simulate the practical worki n g situation of a piston, a new finite element contact model is proposed both th e stress and deformation of the piston and the pressure distribution between the p iston and the pin are obtained the contact area and the pressure distribution v ary with the stiffness of the pin and the clearance between the piston and the p in

    文摘:該文使用間隙元模擬活塞的實際工作狀態,提出活塞的有限元接觸模型,不僅可以得到活塞的應力和變形,還可以計算出活塞與活塞銷之間的壓力分佈以及銷的剛度、銷與銷座的間隙變化對接觸區域的大小和壓力分佈的影響
  16. Abstract : based on the result of visioplasticity test, the law of tube central upsetting was created, and the calculated method of displacement field and strain field were obtained. in this study, the four deformation modes were showed when ratio of height to thickness of tubular billet is greater than 3. the four modes were related to the distribution of strainless - plane

    文摘:根據管坯視塑性實驗法的實驗結果,分析了無芯軸支撐條件下,管坯中部鐓鍛的變形規律,闡述了變形區位移場、應變場的計算方法;通過對實驗結果的分析,得出了當鐓粗比3 ,管坯中部鐓鍛時,內壁呈現四種典型的變形模式;論述了分流面的分佈與四種變形模式之間的轉化關系。
  17. Based on analysis of the characteristics of the composite soil nailed wall, simulating the soil nail, concrete layer, deep mixing pile and step excavation, a model is established to calculate the deformation of the wall, compiled simple and applied program of one dimension fem ; according to the field test data and the calculated data by the fem software this paper has developed, the design method and deformation of the wall in xi ' an area is discussed. the shape of destructive sliding surface of the wall in loess strata in xi ' an area with deep groundwater is gotten. finally the lateral deformation distribution and the experiential formula to predict maximal horizontal displacement of the composite soil nailed wall are given

    針對復合土釘墻構造的特點,建立了模擬復合土釘墻受力變形的一種計算模型,該計算模型可對土釘、面層、深層攪拌樁以及分層開挖等進行簡化模擬;編寫了簡單實用的桿系有限元程序;結合工程實測資料及有限元法分析的結果,探討了西安地區的土釘設計以及復合土釘墻的變形規律,得出了西安地區一般黃土在無地下水時的破壞滑動面形狀,復合土釘墻的側向變形曲線以及計算復合土釘墻最大水平位移的經驗公式。
  18. Machining deformation of aircraft monolithic component is simulated by finite element method ( fem ) and validated by experiment. the initial residual stress in pre - stretched plate is generated by simulating quenching and stretching processes. with a single tool - tooth milling process fem, the machining loads in monolithic component material removing is obtained. restart - calculation is put forward to complete the whole simulation of machining process. to verify the fem result, an experiment is carried out. the deformation distribution of the monolithic component resulting from fem shows a good agreement with the experiment result, which indicates that the key technologies presented in the paper are practicable and can be used to simulate the milling process of monolithic component to predict its deformation. lengthy and expensive trial and error experiment process can be avoided

    在模擬淬火、拉伸過程獲得含有初始殘余應力的預拉伸板材以及模擬單齒切削過程獲得切削載荷的基礎上,提出並採用接力演算法,對一航空整體結構件的材料銑削過程進行有限元模擬,同時進行了試驗研究.結果表明,有限元模擬的整體結構件的變形與試驗具有一致性,從而證明提出的整體結構件加工模擬關鍵技術的可行性,避免了為研究加工變形而進行的繁瑣的試錯法
  19. To ensure the safety of the dam and provide the technology for the decision during the process of construction and store water. in this article, the elastic - plastic stress - deformation of dam is calculated and the consolidation is analyzed. including the rock - fill dam, the stress and deformation distribution of cut - off wall, the deformation of sloping core, the incresment and subduction of pore water pressure and the effective stress situation calculation

    為確保大壩安全,並為大壩施工期和蓄水期運行決策提供必要的技術支持,本論文根據上壩土料的應力一應變一強度特性、滲透和固結等特性,對壩體進行了彈塑性應力變形計算和固結分析,包括大壩堆石體、防滲墻的應力及變形分佈和斜心墻的變形、孔隙水壓力增長及消散和有效應力狀態計算等。
  20. In this paper, a discrete fem model of the whole trolley is established, and the detailed stress and deformation distribution of the whole trolley and its key components under different operational static loads are obtained by fem analysis calculation

    應用大型通用有限元分析軟體對一種型號的模板臺車進行結構靜力計算分析,建立較完善的分析計算模型,計算出模板臺車在使用過程中、在不同工況下各部分的應力應變數值。