delay cable 中文意思是什麼

delay cable 解釋
延遲電纜
  • delay : vt 延遲,拖延,耽擱。 We ll delay the party for two week 我們要把會期延遲兩周。 The train was del...
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. Interconnection generates in 1994, when china union was founded. with the development of telecommunication industry, interconnection presents different states, at the beginning, it ’ s the problem of weak & delay signal because of the telegraphic network ’ s low quality, then it becomes the situation of connected but influent, by 2003, it badly deteriorated while both sides destroyed the cable, interdicted communications by people, so people focus on interconnection

    互聯互通問題早期表現為因電信網本身質量問題而導致的網間信號不好、簡訊延時等;接著,發展為固網、移動網之間,本地網、 ip長途網之間不時出現的不通、不暢等問題;而在2002年、 2003年問題已經嚴重到互相砍斷傳輸電纜、人為阻斷網間通信等惡性事件接連發生。
  2. Should either of the parties to the contract be prevented from executing the contract by force majeure, such as earthquake, typhoon, flood, fire and war and other unforeseen events and their happening and consequences are unpreventable and unavoidable, the prevented party shall, by cable, notify the other party without any delay, and shall, within 15 days thereafter, provide the detailed information of the events and a valid document for evidence issued by the relevant public notary organization for explaining the reason of its inability to execute or delay the execution of all or part of the contract

    如果合同一方由於不可抗力因素而不能履行合同,比如地震、臺風、洪水、火災、戰爭及其他無法預見的事件,其發生和後果也無法阻止、無法避免的,該方應立刻以電報通知對方,並在其後十五天內提交公證機關出具的詳細的事件描述及有效文件,用以解釋其無法履行合同全部或部分條款的原因。
  3. Balanced delay cable

    對稱延遲電欖
  4. That may delay some of the most appealing applications for power - line communications. “ you could plug a cable or satellite video receiver into any outlet in the home and then plug your tv in anywhere and move it around at will, ” reed muses. “ or you could add a virtual second phone line

    想想看,未來只要將纜線或是衛星電視接收器插進家中的任一插座,看電視時,插頭想插哪裡就插哪裡,完全不受限制,利德沉吟道,或者你也可以加一條虛擬的電話線。
  5. If users in the construction of the cable bridge in need of special products, i plant within 48 hours to the construction site, not delay construction progress

    若用戶在施工中需要特殊的電纜橋架產品,我廠在48小時內送到施工現場,決不耽誤施工進度。
  6. Propogation delay test procedure for electrical connectors, sockets, cable assemblies or interconnection systems

    電連接器插座電纜附件或互連系統傳播延遲試驗程序
分享友人