dewatering area 中文意思是什麼

dewatering area 解釋
疏乾區
  • dewatering : (基坑)降水
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. ( 5 ) the author researches the relationship between the deep foundation ' s shape, area and depth and the deep excavation dewatering. the formula, which calculates the minimum distance between foundation ' s bottom panel and the confined water layer ' s top panel, was put forward

    (五)研究了基坑形狀、面積、深度與深基坑降水相關性,給出了計算基坑底板至承壓含水層頂板間的最小距離公式,分析了針對不同基坑應採用的降水方法。
  2. Abstract : yanchang series is a typical low permeability reservoir, and its favourable sandstone reservoir is delta facies. heavy compaction, cementation and heterogeneity exist in it. according to the analysis of the main control factors of forming the secondary pore, it is held that the secondary pore in longdong area is controlled by both favorable facies belt and abnormal formation pressure. it is also held that the formation of the abnormal formation pressure is due to the dewatering of the clay mineral during diagenesis because the dewatering time is identical with the decarboxylation time of organism. organic acid and co2 are driven to adjacent favorable reservoirs under the abnormal formation pressure, and a lot of secondary pore is produced in the runners. from the present exploration result, it is useful to predicting the development of secondary pore to study the distribution of abnormal formation pressure

    文摘:陜甘寧盆地三疊系延長統是國內外典型的低滲特低滲油田,儲集層主要為三角洲砂體,壓實作用和膠結作用強烈,儲層非均質性非常嚴重,因此預測次生孔隙發育帶是尋找油氣聚集帶的關鍵.通過對陜甘寧盆地隴東地區延長統次生孔隙形成的主控因素分析,認為陜甘寧盆地延長統次生孔隙的形成除了受沉積有利相帶控制外,還與地層異常壓力的作用密切相關.研究認為隴東地區異常壓力的形成機理主要由於成巖過程中粘土礦物脫水作用.粘土礦物大量脫水時間正好與有機質脫羧期相一致,從而在異常壓力作用下將生油巖中的大量有機酸及co2帶到與之相鄰的儲集層中,並沿著有利儲集相帶運移,在酸性水經過的地方形成大量的次生孔隙,為後期油氣運聚提供有利通道及宿住空間,從現今的勘探結果來看,通過研究地層異常壓力縱橫向分佈特徵,並結合有利相帶研究預測次生孔隙育良帶是行之有效的方法
  3. Yanchang series is a typical low permeability reservoir, and its favourable sandstone reservoir is delta facies. heavy compaction, cementation and heterogeneity exist in it. according to the analysis of the main control factors of forming the secondary pore, it is held that the secondary pore in longdong area is controlled by both favorable facies belt and abnormal formation pressure. it is also held that the formation of the abnormal formation pressure is due to the dewatering of the clay mineral during diagenesis because the dewatering time is identical with the decarboxylation time of organism. organic acid and co2 are driven to adjacent favorable reservoirs under the abnormal formation pressure, and a lot of secondary pore is produced in the runners. from the present exploration result, it is useful to predicting the development of secondary pore to study the distribution of abnormal formation pressure

    陜甘寧盆地三疊系延長統是國內外典型的低滲特低滲油田,儲集層主要為三角洲砂體,壓實作用和膠結作用強烈,儲層非均質性非常嚴重,因此預測次生孔隙發育帶是尋找油氣聚集帶的關鍵.通過對陜甘寧盆地隴東地區延長統次生孔隙形成的主控因素分析,認為陜甘寧盆地延長統次生孔隙的形成除了受沉積有利相帶控制外,還與地層異常壓力的作用密切相關.研究認為隴東地區異常壓力的形成機理主要由於成巖過程中粘土礦物脫水作用.粘土礦物大量脫水時間正好與有機質脫羧期相一致,從而在異常壓力作用下將生油巖中的大量有機酸及co2帶到與之相鄰的儲集層中,並沿著有利儲集相帶運移,在酸性水經過的地方形成大量的次生孔隙,為後期油氣運聚提供有利通道及宿住空間,從現今的勘探結果來看,通過研究地層異常壓力縱橫向分佈特徵,並結合有利相帶研究預測次生孔隙育良帶是行之有效的方法
  4. Observe the site condition especially the south hidden creek area in any moment, arrange the dewatering and drainage according to the site actual condition and weather condition, ensure the successful construction

    隨時觀察現場情況,重點是場地南側的暗浜區域,根據現場實際情況和天氣條件安排降水和排水工作,保證壓樁安全,順利地施工
  5. The basic theory of dewatering, the dewatering calculation methods, the impact of dewatering on the surrounding environment, the definition of hydrogeology parameters and the shape, area and depth of the deep foundation dominate over this dissertation

    其中,降水的基本理論、降水的計算方法、降水對周邊環境的影響、水文地質參數的確定、降水井結構以及基坑形狀、面積、深度與深基坑降水相關性是本文的研究重點。
  6. Secondly, by means of arranging and analyzing the construction monitor data, the practicality method of proposing the dewatering calculation model and parameters of the non - constantly pumping dewatering well was proposed, moreover the equivalent calculation model and parameters of the erhe project was proposed. thirdly, based on calculating the design scheme of dewatering well with the equivalent calculation model, the optimized scheme of dewatering well of the erhe project was proposed and the well number was reduced to 32 where it was 42 in the old scheme. at last, based on the well construction, the dewatering well structure and constructing technique in the soft soil area were exploited in addition, the significative analysis and evaluation attitudes to the old design scheme of dewatering well project were impersonally proposed

    首先,根據工程地質及水文地質條件和工期分析,提出了「二河」降水井的設計方案;其次,通過系統整理分析抽水井的施工監測記錄,提出了用降水井的施工監測確定非定常抽水降水井井流模型和參數的實用方法,並建立和確定了「二河」降水井非定常抽水、有越流的完整潛水井等效模型和參數;接著,通過用等效井流模型進行降水井方案的計算,提出了「二河」降水井的優化方案,使原方案的42眼井降到32眼井;最後,通過對降水井成井施工實踐的總結,開發了適于軟土區的降水井結構和成井施工技術。
  7. In this paper, hereinafter problems in deep foundation pit dewatering are importantly researched through using the random theory : ( 1 ) the basic theory of underground water permeation during dewatering in deep foundation pit is researched. the method of dewatering is also researched aiming at the deep foundation pit in soft soil two - layer structure area

    本文應用隨機理論,著重研究了深基坑降水工程中的以下問題: (一)探討了深基坑降低地下水位的地下水滲流的基本理論,針對軟土二元結構地區的深基坑工程,研究了其降低地下水位的方法。