discharge control 中文意思是什麼

discharge control 解釋
量控制
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  1. This paper presents a method that chopping wave is done by switch devices which consist of three - level resistance regulating module and intelligence power module ipm, and which realizes constant - current discharge of storage battery. to achieve the intelligence control of the drive protection and the discharge process of ipm, the paper designs circuit formed by igbt threshold drive pulse pwm signals. ipm fault - blocking protection circuit and microcomputer 80c196. the devices can accurately control the 0 ~ 150a discharge current and the discharge time of the storage battery and calculate the releasing power

    實現蓄電池恆流放電過程智能控制是蓄電池放電裝置發展的必然趨,本文提出了一種通過三極電阻調節模塊和由智能功率模塊ipm為開關器件進行斬波從而實現蓄電池恆流放電的方法。為達到對ipm的驅動保護和放電過程的智能控制,文中設計了igbt門極驅動脈沖pwm信號形成電路和ipm故障封鎖保護電路及由單片機80c196為核心的微機控制器。本裝置能夠對蓄電池進行0 150a放電電流及放電時間的精確控制及釋放容量的計算。
  2. By the adoption of a colunm with highly effective bubblecapplates and float valves and the strict control of demineralized water consumption, the total amount of dilute aqua ammonia from the three sections of earbonation, final purification and synthesis is less than the quantity of dilute aqua ammonia required for the production of ammonium bicarbonate, with zero discharge of the dilute aqua ammonia, thus not only prolecting the environment but also realizing a cestain economic benefit

    通過採用高效泡罩板塔、浮閥塔,嚴格控制軟水用量,使碳化、精煉、合成3個工段所產生的稀氨水總量小於生產碳酸氫銨所需的稀氨水量,達到稀氨水的零排放,不僅保護了環境,而且取得了一定的經濟效益。
  3. It is necessary and pressing to excavate and broaden the floodway to increase the capacity of flood discharge and enhance the standard of flood control

    因此,開辟淮河入海水道,擴大洪水出路,增加泄洪能力,提高下游地區的防洪標準是十分必要和緊迫的。
  4. Control of discharge - sand gate discharge - sand gate adopts electro - hydraulic handspike ; it uses displacement transducer to measure opening of sluice gate ; when opening of displacement transducer is smaller than set point, the electro - hydraulic handspike will open this gate ; when opening of displacement transducer is larger than set point, the electro - hydraulic handspike will close the gate

    卸砂門採用電液推桿,由位移傳感器檢測砂門的開度,當位移傳感器檢測的開度小於控制系統的給定值時,電液推桿工作將門開大,當位移傳感器檢測的開度大於控制系統的給定值時,電液推桿工作將門關小。
  5. Feature : the machine adopts magnetic clutch to control speed. so when it runs the speed is smooth. it can run automatically from feeding, curling, discharge, to stacking cups

    特點:本機採用電磁離合器無級調速,速度平滑。杯子從送杯臺開始送杯,卷杯,出杯,到收杯臺,自動完成這一系列動作。
  6. Automatic control system for submersible fire discharge pump

    系統的開發與研究
  7. By arrangement of the control channels through which the hydraulic fluid flows from the discharge chamber into the oil reservoir, this allows any gas bubbles being released from the hydraulic fluid during the suction stroke to be expelled into the oil reservoir

    通過液壓油經控制通道由排出腔流入油槽的這種布置,使得任何在吸入沖程從液壓油中釋放出來的氣泡都被排到油槽中。
  8. Discharge into water control zones

    污水排放入水質管制區事宜
  9. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  10. By using a counter and an operation microprocessor, this paper analyses the measuring method and designs an instrument of edm sinking process in discharge state. this instrument takes samples of voltage, current signal and strong and weak of high frequency signals of detecting voltage amplitude, translates them into various time pulses in discharging state. and a counting unit turns these pulses into digital signals, then send them to a microprocessor. finally various discharge time percentages are sent to the control tache

    通過采樣電火花加工放電間隙的電壓、電流信號和檢測電壓幅值上的高頻信號的強弱,得出反映間隙放電狀態的各種時間脈沖,利用計數器分別對其計數,再送給單片機運算處理,輸出控制環節所需的各種放電狀態時間百分數。
  11. Abstract : by using a counter and an operation microprocessor, this paper analyses the measuring method and designs an instrument of edm sinking process in discharge state. this instrument takes samples of voltage, current signal and strong and weak of high frequency signals of detecting voltage amplitude, translates them into various time pulses in discharging state. and a counting unit turns these pulses into digital signals, then send them to a microprocessor. finally various discharge time percentages are sent to the control tache

    文摘:通過采樣電火花加工放電間隙的電壓、電流信號和檢測電壓幅值上的高頻信號的強弱,得出反映間隙放電狀態的各種時間脈沖,利用計數器分別對其計數,再送給單片機運算處理,輸出控制環節所需的各種放電狀態時間百分數。
  12. According to the state of discharge gap, combining database technology, we adopt neuro - fuzzy control technology to realize real - time control of edm process and auto - adjustment on the basis of process state, which ensure the process is in the state of optimization

    依據放電間隙狀況,通過採用神經模糊控制智能技術,並結合數據庫技術,對電火花成型加工過程進行實時控制,根據加工狀態自動進行調節,保證了加工過程處于優化狀態。
  13. Abstract : on the basis of that the proportion of time spent sparking is analyzed in electrical discharge machining ( edm ) process, a new method. which is used to ascertain the trend of discharge gap change, is presented. and a fuzzy control strtegy is introduced to parctical use, the results is well

    文摘:通過對電火花成形機放電狀態的分析,提出了利用分析周期內出現異常放電狀態時間的比例及開路狀態所佔時間的比例,來判別電火花成形加工的間隙放電狀態及其變化趨勢的方法,並在此基礎上利用模糊控制策略實現了對電火花成形加工過程中放電狀態的控制,取得了令人滿意的效果。
  14. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海河流域大清河北支及中下遊河道洪水數值模擬的實際工作中,應用了一維河網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、泄洪閘控制調度以及近年來北方河道入滲的特點等條件,計算效果良好。
  15. Article 30 where any newly built or expanded thermal power plants and other large or medium - sized enterprise that discharge sulfur dioxide more than the prescribed standards for pollutants discharge or the quota of total control allow, supporting facilities for desulphurization and dust removal must be installed or other measures for controlling the discharge of sulfur dioxide or for dust removal must be adopted

    第三十條新建、擴建排放二氧化硫的火電廠和其他大中型企業,超過規定的污染物排放標準或者總量控制指標的,必須建設配套脫硫、除塵裝置或者採取其他控制二氧化硫排放、除塵的措施。
  16. Then pid flow rate control algorithm is introduced. all experiments made in this chapter are about measuring the valve parameters according to spool positions, single actuator flow rate control by the calculated flow rate feedback control method, free flow rate dividing control under the sufficient pump discharge flow rate situation, proportion flow rate dividing and flow rate dividing based on meter - in flow rate feedback control method under insufficient pump discharge flow rate situation. the results of all experiments proved that the method presented in this thesis is an effective way to overcome the unreasonable flow rate dividing when simultaneously operating multi - actuators with different inertia loads

    第四章介紹了多執行器復合控制實驗系統和實驗方法;介紹了實驗採用的流量控制的pid演算法;並測定了執行器控制閥和閥芯位移相關的系數;做了單個執行器計算流量反饋流量控制、流量足夠情況下多執行器流量任意分配、流量不足情況下多執行器按比例調節流量分配和多執行器進油側流量反饋分流控制實驗;通過實驗說明了論文提出的分流控制方法能實現大小慣性負載復合操作時的合理分流。
  17. Efficiency improved charge and discharge control circuit

    可提高放電效率的充放電控制電路
  18. Development of an electrostatic discharge control program for protection of electrical and electronic parts, assemblies and equipment excluding electrically initiated explosive devices

    電氣電子元件組件和設備保護用靜電釋放控製程序研發
  19. On the basis of analysis on wastewater pollution and water quality monitoring in the shaxi river basin, countermeasures are proposed in order to solve the existing problems, including adjusting industrial structure and rationally arranging industrial allocation, integrated treatment and water environment improvement, total discharge control, fulfilling the benign circulation of water environment, improving the monitoring net and capability, optimizing the allocation of water resources and water environment quality, hastening the construction of sewage treatment plants, and making the water quality of the effluents reach the national standard

    摘要在分析沙溪流域廢污水排放、水質監測等情況的基礎上,針對流域水環境存在問題,提出了沙溪流域水環境對策措施:調整產業結構,合理工業布局;實施綜合治理,改善水環境;實行總量控制,實現水環境良性循環;完善監測網路,提高監測能力;優化水資源配置方式,改善水環境質量;加快污水處理廠建設,實現達標排放。
  20. The third part : a reservoir operation system is built up. it includes water level control model, discharge control model and generation model

    第三部分,研究和建立了一個集發電調度模型、水位控制模型和流量控制模型於一體的水庫單庫調度模型集成系統。
分享友人