discharge flow method 中文意思是什麼

discharge flow method 解釋
放電流動法
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  • flow : vi 1 流,流動。2 (血液等)流通,循環。3 流過;川流不息;(時間)飛逝;(言語等)流暢。4 (衣服、...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  2. Then pid flow rate control algorithm is introduced. all experiments made in this chapter are about measuring the valve parameters according to spool positions, single actuator flow rate control by the calculated flow rate feedback control method, free flow rate dividing control under the sufficient pump discharge flow rate situation, proportion flow rate dividing and flow rate dividing based on meter - in flow rate feedback control method under insufficient pump discharge flow rate situation. the results of all experiments proved that the method presented in this thesis is an effective way to overcome the unreasonable flow rate dividing when simultaneously operating multi - actuators with different inertia loads

    第四章介紹了多執行器復合控制實驗系統和實驗方法;介紹了實驗採用的流量控制的pid演算法;並測定了執行器控制閥和閥芯位移相關的系數;做了單個執行器計算流量反饋流量控制、流量足夠情況下多執行器流量任意分配、流量不足情況下多執行器按比例調節流量分配和多執行器進油側流量反饋分流控制實驗;通過實驗說明了論文提出的分流控制方法能實現大小慣性負載復合操作時的合理分流。
  3. Through examination of the recession limbs of the observed hydrographs, during periods with no rain and thus no surface runoff, one can determine the value of. for this catchment, a value of 0. 8 is obtained. the simulated subsurface runoff at each grid is routed to the outlets through a unit - hydrograph method for overland flow and the linear saint - venant equation for channel flow to get the discharge at xixian station

    對所研究的流域而言,經過估算消退系數為0 . 8 .耦合著這兩種不同地下徑流機制的clm模型都可以計算出每個網格的地表地下徑流深,採用dag lohman 34 , 35發展的匯流模型進行匯流由於是研究地下徑流,所以取每個網格的地表徑流為0 ,該模型採用單位線計算坡面匯流線性聖維南saint - venant equation進行河道匯流
  4. Then based on the research, the debris flow discharge is calculated by the mate method. the dazhai gully and the haizi gully are complex geology with many fracture zones and varied surface layers

    本文主要從地質基礎和這三個基本條件對泥石流的形成環境進行研究,並在此基礎上,運用配方法計算泥石流設計暴雨流量。
  5. Verification method of dynamic liquid discharge and flow velocity facilities

    動態流量與流速標準裝置校驗方法
  6. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  7. Chapter 3 gives an introduction to the flow rate dividing principle based on meter - in flow rate feedback control of multi - actuators control system. special analysis about simultaneously operating multi - actuators with different inertia loads is made. finally the results of simulation proved that the new method is an effective way to improve the flow - used ratio when the pump discharge flow rate is insufficient

    第三章介紹了基於執行器進油側流量反饋的分流控制的原理,並針對大小慣性執行器同時起動時採用該分流控制方法進行了具體分析;最後通過模擬說明該分流控制方法能在大小慣性執行器同時起動並在泵輸出流量不足的情況下有效提高泵輸出流量的利用率,並能實現優先級和分流比混合控制。
  8. Then, a series of physical model experimentations are made to research the flow pattern character and the discharge capacity of curve - labyrinth weir. in this process, the major effect factors of outletcapacity are discussed and a new calculated method of discharge is given

    通過物理模型試驗,觀測了曲線型迷宮堰的流態特徵,根據實測資料,分析研究了該堰型的過流能力及其影響過流能力的主要因素,並提出了曲線型迷宮堰的流量計算方法。
  9. In order to study the characteristics of the stepped spillway overflow comprehensively and seek for the measure to increase the energy dissipation of the stepped spillway at large unit discharge, the method of turbulence numerical simulation and model test are used to study the stepped spillway overflow. in view of the curved free water surface, complicated boundary condition and turbulence flow, it very difficult to simulate the stepped spillway overflow

    為了對階梯溢流壩面流場特性進行全面的研究,同時探求在大單寬流量下提高階梯溢流壩消能率的措施,本文採用紊流數值模擬與實驗相結合,數值計算為主、實驗為輔的研究方法對階梯溢流壩面流場進行了較系統深入的研究。
  10. The method of prediction the discharge coefficients of film cooling holes on the turbine blade suggested by d. a. rowbury et. al has been improved in this paper to fit the computations in the cases of low pressure ratios and the holes in leading edge region especially. the effects of external cross - flow, hole geometry and reynolds number in the hole were taken into account. an additive loss coefficient method is subsequently applied to the test data in order to assess the effect of the external cross - flow

    Rowbury等提出的流量系數工程演算法進行了改進,計算結果和實驗數據的比較表明改進后的新模型使低吹風比和前緣駐點附近流量系數的計算得到了明顯的改進,而在高吹風比下仍能保持與實驗數據相符,這種演算法有可能成為低壓比情況下型面氣膜冷卻的一種通用設計方法。
  11. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  12. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
  13. The researching method is, firstly, to create a flow field model which is testified to be reliable on a large area, and to research the variations of discharge entering and out - flowing from hangzhou bay ; secondly, to simulate the discharge variation of main interest area near the bridge axis with a denser grid in a subarea of the coarse model

    研究方法是首先建立大范圍的可靠適用的流場數值模型,研究進出杭州灣的流量變化;然後對感興趣的區域嵌套加密網格,利用橋墩物理模型測定的等效底摩阻系數,研究建橋前後在橋軸線上的流速、流量變化。
分享友人