discharge level 中文意思是什麼

discharge level 解釋
排水水位
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  1. Based on 2m contour of surveyed bathymetry from 1976 to 1999 and mean - high - tidal line distracted from remote sensing images acquired by landsat - 5 tm from 1976 to 2000 respectively, quantitative analysis about alluvion and erosion as well as the relationship between accretion of modern yellow river delta and the water and sediment discharge of yellow river is made, and the results indicate the mean - high - tidal level is more effective than 2m contour of the bathymetry. it is found that the accretion of modem yellow river delta is becoming less and less, what ' s more, erosion is even more than alluvion in some recent years. diaokou promontory has been eroded seriously since yellow river changed its course in1976

    以一般高潮線反映現代黃河三角洲沖淤演變時,從1976年黃河改道清水溝流路入海到2000年,整個黃洞三角洲凈造陸201 . 5km ~ 2 ,淤積有逐漸變慢的趨勢,甚至出現凈蝕退的年份;刁口河嘴大量蝕退,蝕退速率開始快速,后來逐漸變慢;清水溝河嘴大量淤積,淤積速率開始迅速,后來逐漸變慢,甚至出現凈蝕退;清水溝河嘴南側到支脈溝一段岸線與刁口河嘴以西到灣灣溝一段岸線基本穩定。
  2. This paper presents a method that chopping wave is done by switch devices which consist of three - level resistance regulating module and intelligence power module ipm, and which realizes constant - current discharge of storage battery. to achieve the intelligence control of the drive protection and the discharge process of ipm, the paper designs circuit formed by igbt threshold drive pulse pwm signals. ipm fault - blocking protection circuit and microcomputer 80c196. the devices can accurately control the 0 ~ 150a discharge current and the discharge time of the storage battery and calculate the releasing power

    實現蓄電池恆流放電過程智能控制是蓄電池放電裝置發展的必然趨,本文提出了一種通過三極電阻調節模塊和由智能功率模塊ipm為開關器件進行斬波從而實現蓄電池恆流放電的方法。為達到對ipm的驅動保護和放電過程的智能控制,文中設計了igbt門極驅動脈沖pwm信號形成電路和ipm故障封鎖保護電路及由單片機80c196為核心的微機控制器。本裝置能夠對蓄電池進行0 150a放電電流及放電時間的精確控制及釋放容量的計算。
  3. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪水位、河床以及杭州灣北岸深槽的影響
  4. Using a vortex - flow drop shaft to convey water from a high level to a diversion runnel under the condition of high water - head and large discharge is a new kind of technology in the scheme of reusing a diversion tunnel as a discharge tunnel

    近年來,為解決高水頭、大流量導流洞改建泄洪洞的技術難題,旋流式豎井泄洪洞逐漸成為研究熱點之一。但迄今為止,該技術尚未得到推廣應用,其主要原因在於人們對豎井螺旋水流運動特徵缺乏足夠的了解和深入的研究。
  5. In this paper, high concentration vanadium electrolyte has been prepared by electrolysis, graphite and graphite felt electrode also have been made, moreover, the electeodes have been activated, and based it, a lab - level vanadium battery has been manufactured. cyclic voltammetry, current step and invariable current charge / discharge method have been used to study the reactive mechanism of electrolysis, of vanadium electrode reaction and of electrode activation, also to investigate maiden charge process and electricity performance of vanadium battery. the influence of electrode activation and trace stibium ion, indium ion added into vanadium electrolyte has been discussed

    利用循環伏安法、恆電流階躍法、恆電流充放電循環等電化學方法,探討了電解法制備釩液流電解質的反應機理,考察了釩的電極反應、電極表面活化處理對釩的電極反應的影響,結合電極反應分析了活化的機理;還考察了釩電池初次充電活化過程及恆流充/放電循環的電性能;並且考察了添加銻離子、銦離子對釩電池電性能特別是析氫行為的影響。
  6. Taking the reach with fluctuating backwater area in jiaokou hydroplant in xiujiang river, guanxi zhuang autonomous region for instance, this paper analyzes the water - sediment characteristics of the fluctuating backwater area, calculates the design level of this reach with samples of level and discharge, etc., and propounds the determination method for the designed lowest navigable level of reach with fluctuating backwater area

    以廣西繡江交口電站的變動回水區河段為例,分析了變動回水區的水沙特性,分別利用水位、流量樣本及不同方法計算與分析本河段的設計水位,提出了變動回水區河段設計最低通航水位的確定方法。
  7. It makes the deduction on design tidal level process more reasonable than ever. finally, taking into account the observed data of tidal level are much more integrated than observed data of tidal discharge and the correlative relationship are established based on large numbers of samples. then, the sub stage maximum tidal discharges and tidal velocities are obtained according to the regressive equations and the observed tidal level, and the sub stage design maximum tidal discharges and tidal velocities are estimated by way of frequency analysis

    最後,針對橋位河段實測潮流資料短缺而潮位資料相對完整的實際情況,基於大量樣本建立了潮流量與潮汐要素的相關關系,利用實測長系列潮位資料得到分期最大潮流量、潮流速系列,經頻率分析確定了分期設計最大潮流量、潮流速。
  8. Hbm test method for protection of electrostatic discharge sensitivity testing : component level

    靜電放電敏感性試驗防護的試驗方法
  9. The lightning resisting level of microelectronic device, the property of tvs diode and solid - state discharge triode, three grades protection for power source device, grounding and shield requirement for communication system to protect lightning and the lightning troubles in recent years at hubei electric power company were introduced

    摘要介紹了微電子器件耐雷水平、新型防雷器件tvs管和固態放電管的特性、電源裝置的三級保護、通信系統防雷接地與屏蔽的有關要求和湖北省電力公司通信系統中近幾年雷害情況。
  10. Mainly, the type of pump in the large - scale irrigation and drainage pumping station in our country is adjustable - blade propeller pump. we can regulate the pump ' s blade mounting angle following the variation of water level at the inlet and outlet of the station in order to control the discharge of pump, we also determine the number of running machines with machine ' s optimal combination. so we can reduce its energy consumption, and make it optimally and economically run

    我國大部分大型電力排灌站所安裝的泵都為可調節葉片的軸流泵,這一有利條件使我們可以根據排灌站進、出口水位的變化來調節水泵的葉片角度,控制水泵的流量,併合理的確定開機臺數,通過機組間的優化組合,使整個泵站的能耗最少,達到整體最優、經濟運行的目的。
  11. 3. the drop datum of largest water level in researched reaches increases relatively with length increase of dredging channel in definite condition of discharge and sediment and definite dredged sediment quantity or dredged morphology of transversal section

    在一定的水沙條件和一定的挖沙量或一定挖河斷面條件下,隨挖河長度增加,研究西安理工大學工程碩士學位論文河段最大水位降落值相對越大。
  12. It will change the hydraulic conditions of the river, such as widening the water surface, decreasing water - flow velocity and purification capacity of water body in reservoir area meanwhile, many problem will be encountered, such as a large quantities of pollution in cities and towns, harmful matters in pesticide and fertilizer in reservoir area, poisonous pollutants in rainfall, accidental discharge of municipal wastewater or industrial sewage, limits of low economic level and urbanization etc.

    該水域的水力學條件發生變化,水流速度減緩,岸邊污染帶加寬,水體的環境容量降低;三峽庫區城鎮污水處理廠和廠礦的有害廢水處理設施不可避免地會發生事故排放;成庫期內庫區城鎮污水的治理很難達到水質要求,以及三峽庫區目前較低的經濟和城鎮化水平制約,庫區城鎮供水面臨的水環境問題日漸突出。
  13. Influence of upstream discharge in tidal level prediction for tidal reaches

    感潮河段上游流量對潮位預報的影響
  14. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空載損耗負載損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高負荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  15. Windings d. c. resistance measurement, measurement of impedance voltage and on - load loss, measurement of no - load loss and on cload current, power frequency withstand voltage test, inductive voltage with standing test, measurement of partial discharge level, inspection of appearance and dimension inspection of name plate

    直流電阻測試匝數比測量及電壓矢量關系的校定阻抗電壓及負載損耗的測量空載損耗及空載電流的測量工頻耐壓測試感應耐壓測試絕緣電阻測試局部放電測試外觀和尺寸的檢驗銘牌的檢驗等。
  16. There are 12 rainfall gauge stations and 8 water level - discharge stations and 45 groundwater observation wells in this region

    目前轄區設有雨量站十二站、水位流量站八站、地下水觀測井四十五口。
  17. System level electrostatic discharge simulator verification standard

    系統級靜電放電模擬器驗證標準
  18. Test method for protection of electrostatic discharge susceptible sensitivity testing - charged device model component level

    靜電放電敏感的靈敏度試驗防護試驗方法.放電裝置模型元件水平
  19. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及連續模擬的方法進行了有關時間變態率的系列試驗,通過模型水位、比降、流速、出口流量過程線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種水力參數偏離的主要物理原因:模型的槽蓄響應和洪水過程時間變化率的響應滯后。
  20. Abstract : based on the results of hydraulic model test and remote - control ship model, the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed. the measures of raising navigation discharge level and improving navigation conditions are given

    文摘:根據水工模型試驗成果,分析了三峽工程泄洪時壩下游引航道和兩壩間河段(三峽至葛洲壩)的非恆定波流運動特性,結合遙控自航船模試驗對兩壩間的通航水流條件進行了分析評價,並提出了提高通航流量標準、改善通航條件的相應措施。
分享友人