dispatch time 中文意思是什麼

dispatch time 解釋
速遣日數
  • dispatch : n 1 (迅速)發送,(火速)派遣。2 急報,快信,急件,(新聞)電訊。3 (迅速)處理,速辦;敏捷,急...
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  1. Deadhead time for dispatch

    調度空駛時間
  2. Article 93 a voyage charter party shall mainly contain, interalia, name of the shipowner, name of the charterer, name and nationality of the ship, its bale or grain capacity, description of the goods to be loaded, port of loading, port of destination, laydays, time for loading and discharge, payment of freight, demurrage, dispatch and other relevant matters

    第九十三條航次租船合同的內容,主要包括出租人和承租人的名稱、船名、船籍、載貨重量、容積、貨名、裝貨港和目的港、受載期限、裝卸期限、運、滯期費、速遣費以及其他有關事項。
  3. Give the seller in time the necessary instructions for dispatch.

    及時給與賣方必要的發貨指示。
  4. In the case of a voyage policy, the adventure insured must be prosecuted throughout its course with reasonable dispatch, and, if without lawful excuse it is not so prosecuted, the insurer is discharged from liability as from the time when the delay became unreasonable

    在航次保險單的情況下,承保航程在整個過程中必須合理迅速地完成,如果不能如此完成又無合法的理由,保險人自延遲成為不合理之時起解除責任。
  5. Its natural and effective operation rests on the condition of road and bus, in the same time rests on the method of management. the most important thing is the optimization of the bus dispatch

    這個系統能否正常和有效地運行,不僅取決于道路和車輛等條件,還在很大程度上有賴于營運管理手段是否先進,其中最重要的是車輛調度的優化。
  6. Aiming at the problem that existence in the monitoring of simulate disk in local power grid, to enhance the level and efficiency of the electricity dispatch, to improve operation procedures, to change the troublesome work about 6kv line simulation disk, 35kv transformer substation and 6kv substation host cording diagram revision and maintenance from man - power, manual promotion to direct - viewing, real - time and work flow high automation level

    針對地方電網「模擬盤」監視中存在的問題,為提高電力調度工作水平和效率,完善操作規程,把煩瑣的6kv線路模擬盤、 35kv變電所和6kv配電所主結線圖的修改和維護工作從人工、手動提升到直觀、實時和工作流程高度自動化水平,實現電力調度日報、月報及日常管理實現規范化、自動化。
  7. In design flow modeling, a new design flow model definition method based on object oriented colorful petri net is put forward. in sub _ task dispatching, the task database, the task dispatch algorithm, the task dispatching time and its amending algorithm, the task dispatching execution plan etc. are designed. in version management, the version model of design object is built and the relationship between the linkers in dfms model and the version model about design objects is studied

    在相關的關鍵技術研究中,提出了一套包括通信模型的建立、通信原語的設計、通信服務器的設計等內容在內的被動式協同設計通信方案;設計了一種基於面向對象有色petri網技術的設計流程模型定義方法;提出了一種基於調度時間和資源狀況的子任務調度方案,並完成了任務數據庫的設計、子任務調度演算法的設計、子任務調度時間及其修正演算法的設計和子任務調度實施方案的設計等工作;建立了設計對象的版本模型,研究了設計流程模型的各種連接器與設計對象各種版本間的對應關系。
  8. Dock operations ( e. g., capacity of preparation areas, loading bays, limits of loading and unloading, rules of freight capacity, schedule of dispatch handling ) are optimized, using scheduled window times and carrier on - time performance is tracked

    裝卸操作(例如,準備區域,裝載區,極限的裝卸貨的容量,貨物容量的規則,分派處理的計劃)優化,使用計劃時間表,跟蹤準時運輸情況。
  9. This disquisition aimed at plc reactive dispatch curve controller, associating the entire exploiting process, expounded in guiding ideology, control standard, function and structure design, software system design, analog experiment, fixing and debugging and so on, also part of flow schematic diagram ( the ladder chart was n ' t drawn because of too many network and length limit ). this design involves many subject such as power systenu automatic control microcomputer control and electroa during the design, we have read a great deal of concerned data, base on the sufficient investigation analysis and research, associating the practicality of huanren power plant, we introduced and exploited plc reactive dispatch curve controller in the first time

    本文針對plc無功調度曲線控制器,結合整個研製過程,在設計指導思想、控制準則、性能設計、裝置構成設計、軟體系統設計等方面進行了闡述,並給出了部分程序流程簡圖(由於梯形圖網路數太多,受篇幅限制沒有給出) 。本設計涉及到電力系統、自動控制、微機控制、電子等多學科知識,在設計過程中,我們查閱了大量相關的資料,在充分調查、分析、研究的基礎上,結合桓仁發電廠實際情況,首次提出並研製出了plc無功調度曲線控制器。
  10. Good interface makes it more easy to use and spread. the software has used dynamic programming which is skilled. it can process unlimited short term economic dispatch under the conditions of all the machines " fix time is planed beforehand

    本論文在深入研究分析潮汐電站優化調度的基礎上,還採用了面向對象的編程工具vb ,編制了通用的潮汐電站優化調度程序,使程序具有良好的用戶界面,方便用戶的使用和軟體的推廣。
  11. Based on the analysis and research of current development of geographical network analysis, we summarize the limitation o f current research, and put forward making a geographical network analysis component with component technology, this method realizes geographical network analysis arithmetic and its values, improve the reuse of arithmetic. this method remedy mapx, mo etc gis component ' s geographical network analysis functipn, it also can resolve requirements for short path analysis, locating and servering analysis, material flowing analysis and connectivity analysis, at the same time this method is a beneficial reference for other gis component " design and realization. after mastered correlative theories and arithmetics, using com technology, we realize a geographical network analysis component, and apply it in system for flood material dispatch. the main content and work can be summarized as flows : 1. based on graph network model, we analysis and sum up geographical network analysis model and arithmetic, discuss the most important arithmetic - dijkstra arithmetic and improve it

    通過該思路不僅使研究成果得以應用,體現其價值,也提高了演算法的重用性;開發出來的地理網路分析控制項彌補了當前mapx 、 mo等基礎gis組件的地理網路分析功能,利用該控制項也能解決現實中對路徑分析、選址服務分析、物流分析、連通性分析等地理網路分析的迫切需求,同時該思路對gis組件設計開發也是一個有益的參考。本文在掌握相關理論和演算法基礎上,利用com技術實現了地理網路分析控制項,並在防汛物資調度系統中進行應用。本文主要內容和工作如下: 1 、以圖論中的網路模型為參考,分析總結了幾類基本的地理網路分析模型及演算法,對其中的核心演算法? ? dijkstra演算法進行了分析探討,並對該演算法進行了改進。
  12. The thesis detailedly discusses a kind of optimize method on genetic algorithm, and points out the advantage obout utilizing genetic algorithm to solve large - scale non - linear system. through the study on large - scale strip mine truck real - time dispatch system, proposes the optimize model of strip mine truck real - time dispatch system, and utilizes the characteristic of genetic algorithm, provides a method of using genetic algorithm to solve the optimize model, designs the genetic operators at the same time. by the program language of matlab, develops strip mine truck real - time dispatch system. the system has the advantage of simpless and perfect function, proposes powerful sustain for strip mine ' s production and decision - making

    本文詳細討論了遺傳演算法這種優化方法,指出了遺傳演算法在解決大型非線性系統優化問題時的優越性。通過對大型露天礦卡車調度系統的研究,建立了露天礦卡車實時調度系統的優化模型,並藉助于遺傳演算法自身的優點,給出了應用遺傳演算法解算該優化模型的編碼方法,設置了相應的遺傳運算元。並用matlab編程語言開發了露天礦卡車實時調度系統,該系統具有操作簡單和功能較完善等優點,為露天礦的生產決策提供了強大的支持。
  13. Optimal power flow is an analyzing and optimizing method of power networks, considering economy and security at the same time. it has been widely applied to secure operation, economic dispatch, energy management and pricing of electric power, etc. with the fast development of power market, the importance of practical uses of opf is standing out increasingly

    最優潮流( opf )是一種同時考慮經濟性和安全性的電力網路分析和優化方法,在電力系統的安全運行、經濟調度、可靠性分析、能量管理以及電力定價等方面得到了廣泛的應用。
  14. According to an account from the lianing provincial earthquake office ( 2 ? 21 ) written after the earthquake, when the office staff proposed to dispatch earthquake workers to examine the yingkou - haicheng area before arranging emergency response, hua wen said : “ there may not be enough time for that

    根據遼寧省地震辦公室一位人士震后回顧的有關情況,當辦公室工作班子提議先派地震專業人員到營口?海城區域調查,而後再採取緊急反應措施,華文當時說「可能沒有足夠時間這樣做。
  15. 10for settlement of demurrage / dispatch claim at loading port, both parties would finalize the lay time calculation sheet within 7 working days from the date of completion of loading based on the actual nor and statement of facts duly signed by the master or vessel ' s agent at load port

    10對于解決在裝運港對逾期費和速遣費索賠,雙方應在由船長或其代理在裝運港簽發的實際nor及事實描述確定的裝船日期后的七個工作日內將裝卸時間單製作完畢。
  16. According to the historical documents of the qing dynasty and xu song ' s dealings with other people, the paper makes a detailed textual research on xu song ' s life in exile in ili, in cluding the exact time of his dispatch to ili and the start of his trip to ili, his relationship with ili general, his investigation in the south and north of the tianshan mountains and the time he went back to beijing, presenting a case for the study of the assistant group to ili general then

    摘要本文通過梳理清代史料與相關交遊材料,對徐松遣戍時期的生活,舉凡其遣戍伊犁的具體時間與首途情況、與伊犁將軍的關系、在天山南北的考察,以及賜環歸京的時間,都進行了詳細考證,為研究伊犁將軍幕府集團的文化建設提供了個案。
  17. Based on the day - schedule, short - term load forecast, and monitoring program for spinning reserve, the economic dispatch of east china power grid can be realized, which can ensure time margin for load balancing

    在日計劃編制的基礎上,結合超短期負荷預計及旋轉備用監視程序,對華東電網各省市的口子及直屬電廠實行經濟調度,使調度在進行出力及負荷平衡時有一定時間裕度及科學依據。
  18. Based on netomac, a software package for power system simulation, the model and algorithm of pre - dispatch schedule in generation markets, excitation system parameter setting, and power system small signal stability anaylsis are studied in this thesis. the main work is as follows : a model of pre - dispatch schedule is proposed, whose target is to minimize the market purchasing price ( mpp ) in the whole pre - dispatch period. then according to the characteristics of pre - dispatch schedule, the model of pre - dispatch schedule is simplified to minimize the mpp in each pre - dispatch time, and a three - step algorithm of pre - dispatch schedule is designed : dealing with the optimal problem in the whole period of pre - dispatch with static planning method, solving the problem of combination of machines with pr1 method, resolving problem of optimal power flow ( opf ) with modified powell method

    本文基於netomac模擬軟體,以發電市場預調度計劃模型及演算法、勵磁系統參數整定和電力系統小擾動穩定性分析為研究內容,主要做了以下工作:建立了以整個預調度計劃周期內的市場購電價格最小為目標的發電市場預調度計劃模型,並根據預調度計劃問題狀態數多、變量多、混合整數、非解析的特點,將預調度計劃模型的目標函數簡化為各時段的市場清算電價最小,設計了三段式預調度演算法:用靜態規劃法求解整個預調度計劃周期內的優化問題;用優先級法求解機組組合問題;用改進的powell法求解最優潮流問題。
  19. It was unclear what the actual dispatch time was for the ale personnel

    不清楚執法人員的實際派遣時間。
  20. With regular enhancement, the sgms has been functioning efficiently for more than a decade in meeting the target resource dispatch time

    經定期改善,該系統有效地運作了超過十年,達到在規定時間內調動資源的目標。
分享友人