displacement scale 中文意思是什麼

displacement scale 解釋
排水量標尺
  • displacement : n 1 轉位,移動;取代,置換;(人的)流離失所。2 撤換,免職。3 【機械工程】(活塞)排氣量;【航海...
  • scale : n 1 (尺、秤等上刻劃的)分度,度數,標,標度,刻度;尺寸;尺,尺度。2 【音樂】(標度)音階;音列...
  1. Secondly, the effort is made to develope new type of transition element for multi - scale fatigue damage simulaton of long - span structures for the transition between elements for the hot spot stress analysis and the structural element. the linear and piecewise linear interplotion function for displacement interplotion are used for the transition element formulation according to the displacement compatibility requirement between element interfaces

    在綜合已有的構造過渡單元模型關于位移插值形式的基礎上,通過採用分段線性位移插值模式和線性位移插值方式,並在位移模式中引入非協調位移模式,強迫構造單元通過分片試驗,構造了一種用於疏密網格單元連接過渡單元。
  2. A test device was designed which tested the properties of thrust according the theory of electromagnetism scale. using the hall - effect sensor to measure the scale displacement that could be converted the magnitude of the thrust

    根據電磁天平的原理設計了一套微推力測試裝置,利用霍耳傳感器來測量推力產生的位移,進而通過計算轉換為推力器的推力大小。
  3. To often be in " force empty season " ( see add civil " why does soybean futures appear easily force storehouse " ) suffer losing nominal for, corresponding strategy is through moving the storehouse comes the time of protracted complete a business transaction ( displacement reachs basic admiral storehouse annual 11, 1, march agreement, but, as a result of 1, agreement traded in march scale is not large, move commonly the main target that the storehouse operates was november agreement ), reduce the still can achieve make up the deficits and get surpluses even goal of the loss

    對于經常在「逼空季節」 (見附文「大豆期貨為何輕易出現逼倉」 )遭受損失的空頭來說,相應的策略是通過移倉來拖延交割的時間(基本上將倉位移至每年的11 、 1 、 3月合約,但是,由於1 、 3月合約交易規模不大,一般移倉操作的主要對象是11月合約) ,降低損失之餘甚至還能實現扭虧為盈的目的。
  4. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  5. Steel reinforcing bars used to direct planes to conduct direct, according to the diameter steel straightening mode selection and correct use straightening - scale displacement

    採用鋼筋調直機對鋼筋進行調直,根據鋼筋的直徑選用調直模,並正確掌握調直模的偏移量
  6. The theoretical analysis of nano - silica gel for oil displacement is conducted to quantitatively study the oil displacement effect of sio2 gel system in nanometer scale

    摘要為了定量研究納米級二氧化硅粉體成膠體系的驅油效果,對納米硅膠驅油機理進行了理論分析。
  7. According to the conclusions above, we can say that we should state a correct scale that the loads of both takes on when we design displacement ventilation and cooled ceiling system. this will ensure the air quality of the work zone ; increase cooling capacity ; reduce power lose of the ventilation system

    因此,在進行置換通風與冷卻頂板混合系統設計時,需要確定一個兩者承擔負荷的合適比例值,以在保證工作區空氣品質的前提下,盡量提高工作區舒適性指標。
  8. Thus, two 2d elastic finite - element models of tunnel are respectively established, both of which go through i wall - rock sector and wall - rock sector by means of large - scale finite element software ansys. thereby, the magnitude of wall stress, displacement, submergence of arch roof and terrestrial sedimentation in tunnels will be attained via numerical simulation of the whole construction process

    通過運用大型通用有限元軟體ansys ,分別建立隧道穿越類圍巖地段和類圍巖地段的兩個二維彈塑性有限元模型,進行施工全過程的數值模擬,得到隧道中墻應力和位移以及拱頂下沉和地表沉降值。
  9. Bench - scale displacement test

    實驗臺驅替試驗
  10. Base on the analysis of the grating linear displacement measurement theory, the measure errors especially the subdivision error of the grating scale, this paper focuses on the theory of switch and merge of dual grating scales ’ signals, builds the design criteria of high speed high precision displacement measurement by using dual grating sales, designs the switch picking reference with high precision and fast switch and merge method, analyses the errors brought in by switch and merge of the duals grating scales

    在分析光柵線性位移測量原理、光柵尺的測量誤差尤其是細分誤差的基礎上,本文重點研究雙光柵尺切換與合成的原理,建立了基於雙光柵尺高速高精度位移測量的設計準則,根據設計準則設計了切換基準拾取方法以及快速切換與合成方法,分析了雙光柵計數值切換合成的誤差。
  11. By the advantage of high precision, strong anti - interference ability, long lifespan, etc, grating scale is the chief sensor in displacement measurement. however, as is restricted by the beam path structure, the scan frequency of the scaning circuit, etc, the maximum available measuring speed has a inverse proportion relationship to the measuring pace of a single grating scale

    光柵尺具有精度高、抗干擾能力強、壽命長等優點,成為微納米位移測量的主要工具,但由於受光路結構及信號檢測電路掃描頻率等因素的限制,單個光柵尺測量的最大允許移動速度與其測量步距成反比。
  12. These phenomena show that the fault has strongly activities at the same time. at that time tan - lu fault zone occurred a large - scale left - lateral displacement. the strike - slip movement on the tan - lu fault zone cau sed the zhangbaling uplifting which became source region and the hefei basin appeared strike - slip flexure at the west side of the fault

    說明了控盆斷裂?郯廬斷裂帶在該時期具有強烈活動,且以大規模走滑運動為主,郯廬斷裂帶的走滑使得東側張八嶺進一步快速隆升,仍構成沉積物源系統;在斷裂西側,合肥盆地因走滑而撓曲,形成沉積可容空間。
  13. The pseudo - dynamic test of 1 / 3 - scale model six - story building assembled with hollow shear wall with seams. the internal forces, the deformation and the failure mechansm of the building under earthquake are studied. the rules of frequency, damping and response spectrum are studied. the characters of earthquake response such as structure displacement, interstory drift, action of earthquake, the amplificatory coefficient of acceleration and the rule of strain are discussed. at last, this paper presented the design method of this structure based on the aseismic style and put forward the construction

    進行了帶縫空心剪力墻結構六層樓房的1 3模型的擬動力試驗,研究了結構在水平地震作用下的受力特點、變形特徵、破壞形態等力學性能;得到了結構在不同受力階段的頻率、阻尼、反應譜等動力特性變化規律;討論了結構各樓層的水平位移、層間位移、地震力、加速度放大系數及構件應力分佈規律等結構地震反應特徵;指出了結構的抗震類型、薄弱層及薄弱部位;提出了多層帶縫空心剪力墻結構的第一階段設計方法和相應構造措施。
  14. According to the problem that grating scale hardly achieves high resolution when in high speed and the characteristic of high speed high precision system, this paper presents a cross dimension displacement measuring method based on dual grating scales dual measuring, the counting values of dual grating scales switch and merge

    針對高速高精度定位系統的運動特性及光柵尺測量高速位移時難以實現高分辨力的問題,本文提出了適合高速且實現系統末端點高分辨力位移測量的新方法基於雙光柵尺雙重計數、切換與合成的跨尺度位移測量方法。
  15. The difference of ownership structure and the scale of capital stock form the differentia of dividend distribution. the above problems caused the following elements : the abnormal stock market, the immature market, the government interference and organization investors displacement, is the main reason to fluctuate running stock market. ownership centralized too excessively to shape the effective corporate governance structure

    產生這些問題的原因主要是:股市運行不規范,市場不成熟,政府干預過多;機構投資者錯位,是造成股市波動的重要原因;股權過于集中,難以形成有效的公司治理結構;過分強調籌資功能,企業忽視轉機建制工作;股利政策不科學、不理性,股利決策帶有很大的隨意性、盲目性。
  16. The technique that used to measure the mechanical properties for mems is different from the traditional one considering the size scale. a uniaxial tension test system for test the mechanical property of mems materials is presented in this thesis. the strain is measured by interference strain / displacement gauge ( isdg )

    本文介紹了新近研製的用於測量微電子機械繫統mems材料的機械性能的單軸拉伸試驗系統,採用激光干涉技術測量試樣應變,得到材料從開始變形直至破壞的全歷程應力應變曲線。
分享友人