distortion bridge 中文意思是什麼

distortion bridge 解釋
測畸變電橋
  • distortion : n. 1. 歪扭,扭曲。2. 【電學】(信號、波形等的)失真;【物理學】(透鏡成像產生的)畸變;【醫學】扭轉,變形。3. 竄改,歪曲,曲解。adj. -al
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. The solicitation, development and rupture of craze in exiguous hierarchy play a connective work in the course of polymer ' s damage and rupture. it is a bridge in distortion mechanism of macroscopical and microcosmic

    大部分高聚物的力學性能依賴于溫度、持荷時間、加載速率和環境等因素,其中,溫度和時間的依賴性尤為顯著。
  2. The solicitation development and rupture of craze in exiguous hierarchy play an connective work in the course of polymer ' s damage and rupture, it is a bridge in distortion mechanism of macroscopical and microcosmic

    細觀層次的銀紋引發、生長和斷裂在聚合物損傷斷裂的整個過程中起著承前啟后的作用,它是溝通宏、微觀變形機制的橋梁。
  3. In redundancy structure, the structure ' s distortion and strain will change along with time because of creep. according to the characteristic of concrete ' s creep, the creep grows quickly in the concrete " earlier age. for the long of bridge ' s construction period, the concrete ' s age of different part are discrepantly

    在超靜定結構中,結構的變形和內力都會因徐變而隨時間不斷變化,對于實際的工程結構,結構的整體總是分階段建造起來的,某些荷載(如自重)也是在結構建造過程中分階段作用在不斷生長的結構上的。
  4. Based on analyzing the recent research status and future developments of error compensation techniques for cmm in the world, non - rigid errors of cmm are analyzed by means of the stress distortion analysis for components of cmm bridge - type cmm, and a new idea for die error compensation of high precision cmm is provided

    本論文在分析目前國內外三坐標測量機測量誤差補償技術研究的現狀和發展趨勢的基礎上,通過對坐標測量機構件的受力變形建模分析,詳細研究了測量機非剛性效應運動誤差,為高精度坐標測量機誤差補償技術奠定理論基礎。
  5. At least 60 bridge sites developed fatigue cracks as a result of out-of-plane distortion in a small gap.

    至少有60座橋上出現的疲勞裂紋是由於小間隙處的面外變形引起的。
  6. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。
  7. This paper put forward a method of using amending sine value in the spwm sine table. this method can correct the distortion of the output voltage waveform, which resulted from the dead time used to the voltage type whole bridge main circuit. the inverter system adopts digital fuzzy controller with feed forward correction and which proportion coefficient and integral coefficient is changeable, so dynamic response is improved

    本文提出了一種採用修補spwm正弦表值的方法,用以改善電壓型全橋逆變主電路因上下橋的功率器件切換時先關斷后導通的死區時間而引起的輸出電壓波形畸變;逆變系統採用帶前饋校正的變比例變積分系數的模糊控制器,提高了系統的動態響應指標;系統設計了完善的保護措施,並具有市電電網的故障診斷功能。
  8. Rc - masonry combination arch bridge abandons the disadvantages of conventional masonry arch bridge ' s falsework type construction, which makes longer construction time, higher cost and against protecting environment. compared with double arch bridge, it has better arch ring ' s integer and smaller distortion in the stage of use

    Rc -石砌體組合拱橋摒棄了傳統石砌拱橋採用有支架施工造成的工期長,造價高,不利於環境保護的缺點;相比于雙曲拱橋,主拱圈具有整體性好,使用階段變形小的優點。
  9. Considered local damage due to steels corrosion, fatigue, prestressing loses, whole bridge incline and distortion, this paper studies damage diagnosis technique of the cable - stayed bridge and determines the location and size of damages for yonghe cable - stayed bridge, which has been used after 15 years

    針對鋼筋腐蝕、疲勞、預應力鬆弛、橋梁整體傾斜或變形所引起的斜拉橋局部破損,本文以使用15年後的永和斜拉橋為研究對象,對大型斜拉橋破損診斷技術進行研究,對永和斜拉橋破損位置進行定位、對其破損程度進行評價。
  10. This article emphatically introduce the controlling methods and resolving means about the weld distortion which is always met in steel structure manufacture like bridge, architecture, watercraft, stress vessel

    摘要著重介紹了橋梁、建築、船舶、壓力容器等鋼結構製造中經常遇到的一個比較棘手的問題焊接變形的控制方法和解決方案。
  11. In this paper, i have analyzed the distortion of continuous rigid frame bridge at the condition of temperature uniform change by displacement method and finite element method computer aided design program - sap91. it included : the distortion and inner force condition at the bottom of single pier when it is consolidated, the distortion and inner force condition of thin double piers - rigid frame bridge ; the distortion and inner force condition of thin double piers - rigid frame bridge when the consolidation is elastic consolidation and confinement adopted different rigidity factor ; and the inner force condition of thin double piers - rigid frame bridge when the distance of piers is different

    本文利用位移法和結構有限元電算程序sap91 ,對連續剛構體系橋梁在受到均勻溫變情況下:墩底固接單柱墩、雙薄壁墩連續剛構橋;墩底彈性固接時的雙薄壁墩連續剛構橋採用不同轉動約束剛度系數情況;以及雙薄壁墩墩間距不同的連續剛構橋梁的受力情況進行了分析和比較。
  12. Through a lot inside experimentations and field restoring tests, the results shows this material possess the good performance of anti - cracking, anti - distortion, anti - fatigue and anti - milling, effectively extend the lifespan of the bridge deck pavement, and is suitable to rapidly restore the defect of the bridge pavement

    通過大量室內試驗和野外現場修補應用,表明該材料具有優良的抗裂、抗變形、抗疲勞和耐磨性能,能有效延長橋面鋪裝層的壽命,適用於薄層橋面鋪裝層損壞的快速處治。
  13. The dewater calculation result of the south anchor of runyang yangtze river highway bridge ' s shows that the double deck structure model provide a new method to the non linear coupling calculation of deep foundation pit dewater and settlement, forecast and control the distortion of the soil in the pit, engineering construction and design

    潤揚長江公路大橋南錨基坑工程降水計算表明,雙層結構模型為深基坑降水與沉降的非線性耦合計算,基坑土體變形預測、控制,工程施工和設計提供了新的計算分析途經。
  14. Three - dimensional model was also set up to analyze the structure ' s distortion, cable tension and stress state during the segmental - construction of wenhui bridge ' s girder with degenerated solid elements. the effect of prestressing force and concrete ' s creep were considered in analysis

    建立了文暉大橋主梁施工過程的空間分析模型,採用實體退化單元對主梁分段施工過程中的變形、索力及應力進行了空間模擬分析,分析中考慮了縱橫向預應力效應和混凝土徐變的影響。
  15. The thesis analyses and studies torsion and distortion and cross bending of arbitrary changed section continues box gird bridges. program about geometric nature and torsion and distortion of continues box gird bridge are compiled in microsoft visual c + + 6. 0 language

    並且在microsoftvisualc + + 6 . 0可視化環境下編寫任意變截面連續箱梁的扭轉分析程序,並對該程序進行調試。
分享友人