distortion settlement 中文意思是什麼

distortion settlement 解釋
扭曲沉降
  • distortion : n. 1. 歪扭,扭曲。2. 【電學】(信號、波形等的)失真;【物理學】(透鏡成像產生的)畸變;【醫學】扭轉,變形。3. 竄改,歪曲,曲解。adj. -al
  • settlement : n 1 解決。2 決定。3 鎮定;安定。4 固定;定著。5 澄清;沉澱;沉澱物;沉積物;【地質學;地理學】沉...
  1. Based on the terszige and biot theory, initially analyze the economical of this experiment, directly save investment 22 % after compute. after that, computing the settlement of highway foundation, comparing the computing and survey value, the predict formula of vacuum - heaped load combining precompression for designing, this formula show that the distortion law of consolidation progress. at the same time, based on the position and room experiment, analyzes the intension transformation in soft soil and criteria of stabilization control

    在太沙基和比奧固結理論的基礎上,先分析了此次試驗的經濟性,經核算直接節約投資22 ,經濟效益十分明顯;隨后對真空堆載聯合預壓法加固軟土路基的沉降量進行了估算,並與實測值作對比分析,得出了真空堆載聯合預壓下的沉降量估算公式,能反映「真空」加固過程的變化規律;同時根據現場和室內試驗,分析了軟土強度的變化,以及給出並驗證了工后沉降控制標準。
  2. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳地鐵淺埋暗挖隧道施工中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇施工方法、增大左右線隧道開挖面的距離、合理確定開挖進尺、提高施工效率、加強初期支護、及時施作二次襯砌等對策。
  3. The warp problem of sls is also stressed and the fundamental cause, developing trend and settlement of this problem is advanced. the influence of the primary process parameters on the warp distortion is reviewed through the orthogonal experiments. the result and solution of this experiment have great guidance to minish the warp distortion of material sls systems

    論文還重點研究了sls中的翹曲變形問題,提出了翹曲變形的根本成因、發展趨勢及解決方法,並通過正交實驗考察了主要加工參數的選取對翹曲變形的影響,實驗結果和方法對于具體sls系統減小翹曲變形有很大指導意義。
  4. Thirdly, a calculation formula of distortion settlement is established by considering soil structure damage and plastic drain board restraining displacement of soft foundation. starting with discussing the main factors affecting settlement of consolidated foundation, a reasonable method to modify the calculated settlement of soft foundation by layer - wise summation method is presented here. with calculable coefficients of volume deformation, lateral displacement and structure damage to modify the settlement will be closed to measurer settlement

    ( )在土體損傷理論的基礎上建立了考慮結構損傷、排水板加筋作用的瞬時沉降計算公式,分析了影響土體沉降的主要因素,提出了對按單向分層總和法計算的固結沉降量進行體積應變、側向位移、土體結構損傷三項修正的方法,以上述三個修正系數取代原來單一的綜合經驗系數,使沉降計算值與實測值更接近。
  5. The dewater calculation result of the south anchor of runyang yangtze river highway bridge ' s shows that the double deck structure model provide a new method to the non linear coupling calculation of deep foundation pit dewater and settlement, forecast and control the distortion of the soil in the pit, engineering construction and design

    潤揚長江公路大橋南錨基坑工程降水計算表明,雙層結構模型為深基坑降水與沉降的非線性耦合計算,基坑土體變形預測、控制,工程施工和設計提供了新的計算分析途經。
  6. After years of development, interaction characters of piles, rafts and foundations are widely applied in engineering practice. literatures on actual settlement and development process of pile - raft foundations show that substance of pile - raft foundations " settlement consists of many parts and then produces whole compressing distortion. it will take many years or even more years to finish distortion

    高層建築的樁、承臺(或筏板) 、地基共同作用特性,經過多年的研究發展,已逐步開始應用於工程實踐中,縱觀許多描述樁?筏基礎的實際沉降和沉降發展過程的文獻可知:樁?筏基礎沉降實質是由多個主要分量組成,進而產生的整體壓縮變形,並且需要歷經數年甚至更長時間才能完成的過程。
分享友人