diversion flow 中文意思是什麼

diversion flow 解釋
分道車流
  • diversion : n. 1. 轉換,轉移,轉向;(河流、航線等的)改道;(資金等的)挪用;〈英國〉(因修路等車輛)繞行,繞路。2. 消遣,娛樂。3. 【軍事】箝制,佯攻。
  • flow : vi 1 流,流動。2 (血液等)流通,循環。3 流過;川流不息;(時間)飛逝;(言語等)流暢。4 (衣服、...
  1. The researches indicated : ( 1 ) the seepage flow field of infiltration diversion is characterized by three - dimensional, saturated and steady flow. there is the close hydraulic relationship between the river and the groundwater in the filtering bed, and the groundwater is confined

    研究表明: ( 1 )滲濾取水的滲流場具有典型的飽和三維穩定流特徵;滲濾取水濾床中地下水與河流的水力聯系比較緊密,濾床中的地下水處于承壓狀態。
  2. Using a vortex - flow drop shaft to convey water from a high level to a diversion runnel under the condition of high water - head and large discharge is a new kind of technology in the scheme of reusing a diversion tunnel as a discharge tunnel

    近年來,為解決高水頭、大流量導流洞改建泄洪洞的技術難題,旋流式豎井泄洪洞逐漸成為研究熱點之一。但迄今為止,該技術尚未得到推廣應用,其主要原因在於人們對豎井螺旋水流運動特徵缺乏足夠的了解和深入的研究。
  3. 5. according to tiansha river ' s water diversion and flow strengthen project that is determined by zero - dimensional model, the plan of tidal river networks is successfully calculated

    緊密結合江門市天沙河引水增流工程項目,根據零維模型確定的方案,對感潮河網進行了方案計算。
  4. A slot was cut in the back plate of the double - foil shield to improve the flow field with air diversion method. the flow field and droplets trajectory near the shield are simulated in wind tunnel by fluent software to analyze the wake flow affecting the spray drift. from simulation, the improved shield spray in reducing drift is better than double - foil shield spray and conventional spray in six types of wind velocity

    本文採用導流法在雙圓弧罩蓋上開口,利用fluent模擬分析和比較罩蓋噴霧流場,並模擬該流場下的霧滴運動軌跡來分析霧滴的飄失性,模擬結果表明:結構改進后的罩蓋噴霧流場得到改善,其減少霧滴飄失的效果好於原罩蓋,更優于常規無罩蓋噴霧。
  5. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工程中的發電引水隧洞運行的各種工況進行了水工模型試驗研究,指明要獲得良好的水流流態,過水建築物各部位結構輪廓的造型應適應水流流線的收縮、流速及壓強的變化;為使引水隧洞在各級引水流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。
  6. Total system flow regulation in long distance water diversion works with multistage pump stations

    長距離多級泵站引水工程全系統流量調節
  7. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  8. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  9. The numerical simulation for adjustable - blade pump on - line autoregulation in diversion works has been studied in this paper whose background is modification works of dongjiang - shengzhen diversion works. the problems include autoregulation on water height of the fore bay in single pump station, autoregulation on output of adjustable - blade pump in single pump station, and autoregulation on flow equation of multilevel pump stations

    本論文以東江深圳供水改造工程為背景,對輸水工程中應用轉槳泵進行在線自動調節數字模擬進行了研究,其中包括單級泵站中對前池水位進行自動調節,單級泵站中對轉槳泵的輸出流量進行自動調節,以及多級泵站輸水系統流量平衡自動調節。
  10. Study on flow velocity distribution in the closure gap area of open diversion channel

    三峽工程明渠截流龍口流速分佈研究
  11. Concretely, on the basis of describing the communication specification of arinc 429 with enhanced parallel port ( epp ), the standard and the module application of dsp and cpld, the thesis has proposed the design of the arinc 429 technology based on dsp system. at first, the function and the application of each module of the system and the operation principle of high - performance cmos bus interface circuit hs - 3282 chip which forms the main body of the data diversion of the interface module are introduced. secondly, the hardware structure of the interface module is described in detail, mainly including data latch and buffer circuit, choice circuit of transmission rate, etc. and then the design philosophy and flow charts of the software are fully discussed, such as the basic requirement of software, the design and realization of the function

    本文在簡單的論述了pc並口協議( epp )與dsp之間的通信方法、 cpld模塊邏輯控制應用和arinc429的通訊規范的基礎上,給出了基於dsp的arinc429通訊介面的設計方案:對通訊板中各模塊的功能和應用以及構成數據轉換主體的總線介面晶元hs - 3282的工作原理做了說明;介紹了本設計所用的dsp和cpld的功能概況;詳細敘述了通訊板介面模塊的硬體結構設計,其中,對數據緩沖電路、數據傳輸速率選擇電路、邏輯控制電路等各關鍵點做了重點介紹;具體闡述了軟體設計思想及流程圖,包括軟體的基本要求和功能的設計與實現;接著從埠譯碼單元、 i / o通道、電平轉換電路等方面進行了介面模塊的軟、硬體調試;最後,給出了測試結果,對研製工作做了總結,對本設計的優缺點各做了評述。
  12. Baiyinbaoligao, sun dong - po, li guo - qing. adjustment of flow momentum in curved channel by using diversion grid j. journal of hydraulic engineering, 2001 ( 1 ) : 15

    白音包力皋,孫東坡,李國慶.導流柵對彎道水流動量調整的研究j .水利學報, 2001 ( 1 ) : 15
  13. Experimental study on flow characteristics in inverted siphon for diversion project from south to north china

    南水北調中線工程倒虹吸管道水力學試驗研究
  14. Based on tiansha river water diversion flow strengthen project in jiangmen, the hydraulics and water quality characteristics in tidal rive networks have been simulated numerically. zero - dimensional and one - dimensional hydraulic models have been applied. this paper presents the concept of roughness optimization

    採用零維及一維水力模型,結合江門市天沙河引水增流工程項目,對感潮河網的水力水質特性進行了數值模擬,提出河道糙率優化概念,為感潮河網的納潮沖污,改善水環境提供了理論依據。
  15. To solve the problem that the water quantity can not be calculated correctly, the following researches were made : ( 1 ) discussing the properties of the on - site experimental seepage flow field of one infiltration diversion project guided by the basic theory of groundwater flow in porous media

    本論文針對滲濾取水工程中水量計算不準確這一問題,進行了如下的探討和研究: ( 1 )結合某滲濾取水工程現場模擬試驗,並以多孔介質地下水滲流的基本原理為指導,對試驗的滲流場特徵進行分析。
  16. As an inlet structure, the forbay is an important part of the pumping station. the pressurized forbay, close in top structure, is a kind of particular forbay in which water is pressurized. based on the integral hydraulic model test of shanghai changqiao waterwork ' s water - transport pumping station, some research on the hydraulic characteristics of the pressurized forbay has been done in the paper. the main content is listed as follows : l. the hydraulic characteristics of the pressurized forbay in different water supply combination and different pump unit combination without divertion measure, and the reason of the poor flow state. 2. the hydraulic characteristics of the pressurized forbay with diversion pier, and the reason why the flow state can be improved. 3. the experimental research on the critical air suction condition of the pressurized forbay

    本文基於上海長橋自來水廠改造工程送水泵站整體水力模型試驗,對有壓前池的水力特性進行了研究,研究的主要內容如下: 1 、無導流措施的有壓前池在不同供水組合及不同機組開機組合條件下的水力特性,並分析了流態較差的原因; 2 、加設導流墩後有壓前池的水力特性,以及加設導流墩流態改善的原因; 3 、有壓前池進氣臨界條件的試驗研究; 4 、水泵進氣以後水泵性能的討論。
  17. Finally, author analyzed and compar ed these two schemes on the aspects of technology and economy according to the wholly structure optimizing process and outcome, and recommended the final scheme of the right bank ' s diversion tunnel of gongboxia power station reconstructed into a horizontal swirling flow internal dissipater tunnel

    最後根據整個體型優化過程與結果,從技術與經濟對比分析兩個方面,對公伯峽右岸旋流泄洪洞進行了選型研究與方案比較,提出了公伯峽水電站右岸旋流內消能泄洪洞的最終推薦方案。
  18. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
  19. After the diversion, the nullah no longer received discharges from livestock farms, but the diversion did lead to significantly reduced flow, lowering the nullahs ability to dilute or disperse pollutants

    雖然改道后錦銹花園明渠的禽畜廢物污染量有所降低,但由於流量大幅減少,削弱了明渠稀釋和消散污染物的能力。
  20. In the text applying the theory of two - phase flow ' press - drop and diversion - phase model, having a analysis to the press characterize of the important part namely the bubble pump of the no - pump libr absorption air - condition, and set up the relational mathematical model

    本文對無泵溴化鋰吸收式空調器的關鍵部位,氣泡泵的特性按照流體力學兩相流的理論進行了分析研究,並應用兩相流的分相模型,建立了數學模型,並進行了數值模擬計算。
分享友人