diversion gate 中文意思是什麼

diversion gate 解釋
分水閘口
  • diversion : n. 1. 轉換,轉移,轉向;(河流、航線等的)改道;(資金等的)挪用;〈英國〉(因修路等車輛)繞行,繞路。2. 消遣,娛樂。3. 【軍事】箝制,佯攻。
  • gate : n 1 大門,扉,籬笆門,門扇。2 閘門;城門;洞門;隘口,峽道。3 【冶金】澆注道,澆口,切口;【無線...
  1. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    錦屏二級水電站是一首部設低閘,採用長隧洞引水的高水頭、大流量的引水式電站。
  2. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  3. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  4. Abstract : this paper summarizes a series of tests and inve stigations on general layout, const ruction diversion, flood disposal, navigation, river closure, form of gate opening s ection, pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results

    文摘:綜合闡述了珠江水利委員會科學研究所從1983 ? 1998年間對飛來峽水利樞紐的整體布置、施工導流、泄洪、通航、截流、閘孔斷面形式、閘下消能形式、閘下沖刷等所進行的一系列試驗和研究工作,並介紹主要試驗研究成果。
  5. Design of gates for diversion tunnels and gate lowering at zipingpu water conservancy project

    紫坪鋪水利樞紐工程導流洞封堵閘門設計及下閘紀實
  6. Rapid excavation construction technique of gate shaft for right diversion tunnel of xiluodu hydropower station

    溪洛渡右岸導流洞大型閘門豎井快速掘進技術
  7. The emergency gate of the cross harbour tunnel, located south of the railway approach may be used as a back - up route for vehicles which have missed the first diversion

    位於順風道以南的海底隧道緊急事故閘口或會作為供錯過了第一個改道位置之車輛使用的后備路線。
分享友人