double-line bridge 中文意思是什麼
double-line bridge
解釋
雙線橋-
The haizigou bridge located at houyue railway dk62 + 688 in yicheng city, is a double line railway bridge, 88. 5meter in heigh, 370. 32 meter in total length
海子溝大橋位於山西省翼城縣境內,侯月鐵路dk62 + 688處,是一座跨越黃土沖溝的雙線鐵路橋,橋高88 . 5m ,橋長370 . 32m 。 -
The component of product : this production line is mainly composed of charging wagon, single or double support uncoiler, transverse cutting machine, piling device and so on, meanwhile swing type mid - bridge, leveling draught device and deviation rectification device and so on are equipped between each machines
產品組成:該生產線主要由上料小車,單或雙支撐開卷機,橫向剪切機,堆垛裝置等組成,同時在各機之間配有擺動式中間橋,校平牽引裝置,糾偏裝置等。 -
The bridge construction technology of large span box frame in lanyan double - line
藍煙復線大跨度箱形框構中橋施工技術 -
Analysis of flow condition within channel in approach bridge area of double line bridge engineering at zhaoqing xijiang river
肇慶西江大橋復線工程橋區航道水流條件分析研究 -
Due to the road width shortfall on section 4 of wufu road and west river road, this section is planned as a single track 3. 14 kilometers long. this lrt line is planned to be mainly of the at - grade type, except for the area at the intersection of section 3 of chushan road and section 4 of kishon road, as well as on the north side of genko bridge over the love river, where underground sections are planned. there will be 23 stations on the double - rail sections and 9 stations on the single rail sections
並提出其輕軌系統優先發展路網,建議路線全長約9 . 6公里,設置9個車站,總成本以88年幣值估算,約需新臺幣86億,包括2 . 2公里高架,佔全長之23 , 2個高架站; 0 . 7公里地下,佔全長之7 , 1個地下車站;其餘6 . 7公里為平面型式,佔全長之70 , 6個地面車站。 -
The component of product : this production line is mainly composed of charging and discharge wagon, single or double support uncoiler and coiler, slitting machine ( or deburring machine ), slitter edge takein machine and so on, meanwhile swing type mid - bridge, draught device and deviation rectiocation device and so on are equipped between each machines
產品組成:該生產線主要由上、下料小車,單或雙支撐開、收卷機、縱剪機(或修邊機) 、廢邊收料機等組成,同時在各機之間配有擺動式中間橋,牽引裝置,糾偏裝置等。
分享友人