drainage tank 中文意思是什麼

drainage tank 解釋
泄水櫃
  • drainage : n. 1. 排水,放水;排水法;逐漸流出。2. 下水道;排水設備,排水系統。3. 水系,排水區域,流域。4. 陰溝水,(排出的)污水。5. 【醫學】引流,導液(法)。
  • tank : n 1 罐,槽;箱;櫃〈盛液體或氣體的大容器〉;(火車頭的)水櫃;(船上的)液體艙;〈美、英方〉水堰...
  1. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  2. Agricultural drainage. coating products. sand tank filtration test. test method

    農業排灌設備.塗覆產品.沙箱過濾試驗.試驗方法
  3. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  4. Tank linings and pipe coatings : ballast and potable water tanks ; bilges, wet voids and drainage pipes

    儲罐襯里和管道用塗料:壓載水艙和飲水艙;艙底、濕空艙和排水管。
  5. In west kowloon, good progress has been made on the stage i and ii drainage improvement works which are scheduled for completion in 2003 and substantial completion in 2004, respectively. in order to minimise the extent of road openings caused by the extensive drainage improvement works, construction of an underground flood storage tank

    為了盡量減少在西九龍區因進行排水改善工程而須掘路的范圍,渠務署於二零零一年年初在大坑東游樂場地底興建容量達十萬立方米的蓄洪池,以及在九龍塘興建一條長1
  6. As regards the mongkok area, drainage improvement works, including an underground stormwater storage tank in tai hang tung recreation ground, are being implemented to reduce the flood risk in mongkok

    至於旺角區的排水改善工程(包括于大坑東游樂場地下興建雨水儲存庫)現正進行,以減少旺角區的排水渠淤塞機會。
  7. In this case, when one of the machines be placed into the transition process of the vident fluctuating pressure for some kind of reason, the other machines would be affected become of the fluctuating pressure in the diversion system and drainage system of water in upstream and downstream which use the same one surge tank and the same one penstock with the machine, so the other machines would be put into transition process of fluctuating pressure, and become a kind of hydroelectric interfere

    在高水頭引水式水電站中,通常幾臺機組共用同一調壓井,且共用壓力主管。在這種情況下,當其中一臺機組由於某種原因處于大波動過渡過程,則其在電站上下游引、尾水系統中引起的壓力變化必然會影響與其共用調壓井和壓力主管的其它機組,使其它機組也處于過渡過程,形成一種水力干擾。
分享友人