dredging area 中文意思是什麼

dredging area 解釋
疏浚區
  • dredging : 干法塗搪
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. According to the contrast between different maps and the dynamical conditions, the area of bohe lagoon had reduced by 45. 3 % from 1932 to 2000 and human activities in the coastal zone, such as inning, sand dredging and aquiculture, have brought great effects on the coastal system, which has accelerated the barrier erosion and lagoon evolvement

    通過對比分析, 1932 ~ 2000年,博賀?湖面積減少45 . 3 % ,人類活動已成為影響該區海岸演變的主導因素;灘塗圍墾、海岸采沙與水產養殖等人類活動加劇了沙壩海岸的侵蝕後退,且使得?湖面積迅速減少,不斷淤淺萎縮,大大加快了海岸體系的演化進程。
  2. As one type of dredging equipment, a cutter suction dredger can dredge material and fill land by continually cutting soil and transporting slurry to the disposal area

    絞吸式挖泥船作為一種疏浚設備,單船作業可疏浚和吹填。它能連續地挖掘和輸送泥漿,因而具有廣泛的適用性和經濟性。
  3. The project is classified as a designated project by virtue of item c reclamation, hydraulic and marine facilities, dredging and dumping, item c. 10 a marine dumping area and c. 12 a dredging operation exceeding 500, 000 m

    運作期間對環境可能造成的影響,並根據這兩項環境影響評估的結果,推薦一項可取的污泥卸置設施
  4. The effect of dredging channel for deposition reduction is related to dredged channel geometry morphology and dredged channel area

    挖河減淤效果與挖槽幾何形態及挖槽面積有關。
  5. Financing investment mode ' s innovation basing on dredging western area ' s capital bottleneck

    基於疏通西部地區資金瓶頸的財政投融資模式的創新
  6. The first - stage construction of dayaowan has formed a region about 1 km2 by dredging. in this area, because the dredging points were set scarcely, soil formed becomes a regional and radial distribution, in which the soft deposits occupies about 40 %

    大窯灣一期工程利用疏浚吹填形成了約1km的區域,在此區域中,由於設置的吹填點較少,形成的土質呈區域性放射形分佈,軟基佔40左右。
  7. For the purpose, yuan government took a series of effective measures to develop agriculture and pasture, industry and commerce, communications etc. in the northwest area and obtained new achievements : forming a new national pattern and multiple economy in the northeast area ; discovering the true source and dredging partial transport of yellow river, which was an important place in the history of yellow river ' s development ; improving unprecedentedly the conditions of local communications by establishing posts and strengthening to run them in the northwest area, which had a great effect on the communication of ming - qing dynasty down to today ; ningxia being named officially in yuan dynasty and ningxia plain becoming beautiful " lush southern - type fields north of the great wall " on the base of the development of yuan dynasty

    為此,採取一系列有效措施,對西北地區的農牧業、工商業、交通等進行比較全面的開發,取得了一些新成果。如西北地區民族新格局及多元經濟的形成;對黃河的開發,發現了真正河源,開通局部黃河漕運,在黃河開發史上佔有重要地位;通過在西北地區設立驛站和加強對所立驛站的管理,使當地交通狀況得到前所未有的改觀,對明清以降直至今天的交通都產生了很大影響;寧夏于元代正式定名,寧夏平原變成美麗的「塞上江南」 ,在元代奠定了基礎。
  8. Despite the marine park status, which should ensure a certain degree of protection from development, currently two developments threaten the area - the reconstruction of a jetty and maintenance dredging for the aviation fuel receiving facilities

    雖然沙洲鼓洲成為海岸公園,獲得一定程度的保護,免受發展工程影響,但該處仍備受兩項發展項目威脅,包括碼頭重建工程及飛機燃料接收設施的保養挖掘工作。
  9. A trailing suction hopper dredger is one of the most popular dredging tools for regulation of waterway and harbors. it is a large self - propelled and self loaded dredger which can be used in wide water area such as an estuary or a river mouth. it is adaptive economical, it is widely used in large dredging projects in most countries in the world

    耙吸式挖泥船是最常用的清理河道港口的疏浚工具之一,它是水力式挖泥船中大型自航、自載式挖泥船,適用於水域開闊的海灣、河口,具有廣泛的適用性和經濟性,為世界上各個國家在較大的疏浚工程中廣泛採用。
  10. Temporary at the dredging area habitats

    生境的損失。
  11. Given the short construction durations about one year for temporary barging point and about 3 months for dredging area, a negative impact on marine ecology is not expected

    由於施工時間短暫臨時停泊點工程為期約一年挖掘區域的則為三個月,預計將不會出現對海洋生態的負面影響。
  12. Under the chosen conditions of testing discharge - sediment and scheme of dredged section, the effect of dredging river for deposition reduction will be considered better when the dredged section ' s wide deep radio is - ^ b ~ nlhn with 6 ~ 9 and dredged section area is about 250 ~ 300m2

    在選定的試驗水沙條件和挖河斷面方案下,認為開挖斷面面積在250 300m 『左右,斷面寬深比vb 。 m在6 9之間挖河減淤效果11 。
  13. Therefore, it is necessary, in view of the specific situations of the three gorges reservoir area, to analyze thoroughly and systemically the stability of the bank landslide, in order to provide the theoretical basis for coming up with the dredging measure of the bank landslide

    因此,有必要針對三峽庫區的實際情況,深入系統分析岸坡滑體的穩定性,為確定岸坡滑體整治工程措施提供理論依據。
分享友人