drill derrick 中文意思是什麼

drill derrick 解釋
鉆機起重機架
  • drill : n 1 【軍事】操練,演習;(嚴格而有系統的)盤練,訓練;〈英口〉教官。2 【機械工程】鋼鉆,鉆頭;鉆...
  • derrick : n. 1. 【機械工程】動臂起重機,塔式起重機,起貨桅。2. 油井架,鉆(井高)塔;(飛機的)起飛塔。3. 〈美俚〉小偷。
  1. When it has been decided where we are going to drill, we put up at the surface an oil derrick.

    決定了鉆孔位置后,我們就在地面上豎起井架。
  2. With the standardized workshop occupied 11600m2 and 630t hydraulic presses, 315t two axle punch presses, 250 sets of large, middle, small equipments, the company has the whole series production line. main equipments include cut - board machine, incurvate machine, opened incline pressure machine, drill attack machine, auto - moving hang machine, various kinds of moulding plastic machine, lathe, planer, drilling machine, horizontal axis rectangle platform flat grinder, universale lifting platform milling machine, eccentricity axis punching machine, liquid pressure derrick car, etc

    主要設備有: 630噸液壓機315噸雙軸沖壓機250噸沖壓機等大型沖壓機床,剪板機折彎機鉆攻兩用機自動走軌起吊機各式型號注塑機各式車床刨床鉆床臥軸矩臺平面磨床萬能升降臺銑床偏心軸沖床液壓起重車等大中小設備386多臺套,形成具有自動沖壓步進的生產線。
  3. On the basis of analyzing the rock mechanics, the bit working circumstance and property in the bottom hole of 6000m deep well, and making use of the former equipment such as a derrick, platforms etc, the paper demonstrates that the research and design of the mechanical device have been established including the high pressure simulating well bore, the high pressure connector between the static well bore and the rotating drill pipe, the high pressure simulating system of circulating fluid and the high pressure desander etc. the produce, control and dynamic analysis of the bottom hole four - dimensional pressure ( over burden, confined, pore and column pressure ) have been studied

    本文在對井底巖石的受力狀態以及鉆頭的工作環境和特性加以分析的基礎上,藉助原有的井架、平臺等設備,研究設計了模擬6000米井底壓力壞境的高壓模擬井筒、鉆柱高壓轉聯器、鉆井液高壓模擬系統以及高壓除砂器等機械裝置,並研究了井底四維模擬壓力(上覆壓、圍壓、孔隙壓和液柱壓)的產生、控制及其控制的建模與模擬,從而實現井深至6000米的四維井底壓力環境的模擬。
  4. When it has been decided where we are going to drill, we put up at the surface of an oil derrick.

    當決定要在哪裡鉆孔時,我們在那塊地面上豎起一個井架。
  5. When is has been decided where we are going to drill, we put up at the surface an oil derrick

    我是專門搞石油的,尋找石油比其他任何采礦業對改進鉆探作的貢獻都要大。
  6. Since the deeper the well, the higher the lifting force at the upper drill string, the deviation of derrick and the well head ' s eccentricity should be avoided by all means to prevent the severe eccentric wear on the casing which is caused by excessive effective eccentricity

    由於上部鉆柱的提升力隨井深的增加而增加,因此應當盡量避免井口偏心或井架安裝不正,防止有效偏心距過大而造成近井口套管的嚴重偏磨。
分享友人