drilling test 中文意思是什麼

drilling test 解釋
鉆孔試驗
  • drilling : n 1 鉆孔;【礦物】鉆井;〈pl 〉鉆屑,鉆粉。2 操練,訓練。n 【農業】條播。 ridge [furrow] drilling...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. There are the production lines established of intermediate - frequency melting, silicasol shuck, precision casting and metal ceramic, and 250 universal devices suck asvacuum melting electric furnaces, high - temperature and intermediate - temperature heat treatment electric furnaces, digitai - control lathes, milling and drilling machines, coreless millers, spherical surface millers, standing milling machines and so on, lt has established the central measuring roomm physicallab, chemical lab, metallic phase lab, crack detection test lab, seat ring lab, rocker lab and ducgt trestle lab, our esported gas engine valve seat to america was rewarded the second prize in terms of sichuan high - quality product

    建有中頻熔煉真空熔煉硅膠溶模精密鑄造粉末冶金生產線。有中頻電爐真空熔練電爐高中溫熱處理電爐數控車床鉆銑床無芯磨外園磨立磨等通用設備250臺套。有中心計量室物理化學金相探傷檢測及座圈搖臂導管臺架實驗室。
  2. Lab. and field test of hunan sepiolite drilling mud

    湖南永和海泡石的石油鉆井泥漿試驗
  3. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  4. Test and study on vibratile drilling new laminated material by step type variable parameter

    階躍式變參數振動鉆削新型疊層材料的實驗研究
  5. The gas underbalance pressure drilling test for protecting reservoir was carried out in two holes

    開展了2口保護儲層的天然氣欠平衡鉆井試驗。
  6. The stabilities of the accumulations are analyzed by means of geological survey, drilling, exploratory adit, geophysical exploration and scientific research test etc. and then the relevant engineering treatments for various of the accumulations on the project are put forward as well

    在勘察過程中我們採用了地質測繪、鉆探、硐探、物探、科研試驗等多種勘察方法與手段,在勘察成果基礎上對堆積體穩定性進行了分析,並結合對工程的不同影響提出了相應的工程處理措施。
  7. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規鉆孔取樣試驗成果的使用應當慎重,對重要工程宜採用探坑、豎井取樣,或採用雙筒薄壁取土技術。
  8. Specification for the accuracy of machine tools and methods of test - drilling machines, radial type

    機床精度及試驗方法.第10部分:搖臂鉆床
  9. Test conditions for box type vertical drilling machines. testing of the accuracy. part 2 : pratical test

    箱型立式鉆床的試驗條件.精確度試驗.第2部分:實用試驗
  10. Accuracy of machine tools and methods of test - drilling machines, vertical floor mounted column and pillar types

    機床精度及試驗方法.第11部分:落地圓柱立式鉆床
  11. Test conditions for pillar type vertical drilling machines. testing of the accuracy. part 2 : practical test

    柱型立式鉆床的試驗條件.精確度測試.第2部分:實用試驗
  12. Accuracy of machine tools and methods of test - drilling machines, turret and single spindle co - ordinate types

    機床精度及試驗方法.第15部分:轉塔單軸座標鉆床
  13. Through the research on the reducer reliability and optimization design, the design quality of the drilling machine are improved greatly. it is proved that the type zk - 150 drilling machine capability is advanced and operation is reliable by examine and industrial test in coal mine. another advanced equipment provided to users has wide application foreground

    通過可靠性優化設計,使鉆機的設計質量得到很大提高,所研製的zk - 150型鉆機經性能檢測和工業性試驗證明:技術性能先進,機械運轉可靠,為煤礦提供了又一先進設備,具有廣闊的市場前景。
  14. On the other hand, the hydraulic performance of the hole, including flow rate coefficient and uniformity of flow rate, have been tested as standards to evaluate the quality of holes punched by laser drilling machine with much better results than that punched by mechanical drilling machine. the shape of holes taken by a microscope photograph can also give detail and well explanations for this test results

    對噴孔水力學性能的試驗研究表明,本文提出的用噴孔水力學性能指標(流量系數和流量變異系數)來評價微噴帶激光打孔機質量的方法是可行的,並證明微噴帶激光打孔機的質量明顯優于機械打孔的質量,用顯微鏡觀察噴孔的形狀的照片也同樣證明了這一點。
  15. With computer imitation and laboratory physical analog as the lead and on the basis of test ore blocks and industrial blownoff - ore rock tests, study on the enlarged - structure parameters of sublevel caving in meishan iron mine was carried out, which included single tests of drilling and blasting parameters , transition sublevels and equipment complementation. the timely popularization of this enlarging structural parameter technique has greatly improved the performances of the sublevel caving mining and promoted the technological advance of underground mining

    梅山鐵礦加大無底柱分段崩落法采礦結構參數研究,採用計算機模擬、實驗室物理模擬為先導,試驗礦塊、工業放出體試驗為基礎,分別進行了采場鑿巖爆破參數、過渡分段、設備配套等單項試驗,並在全礦及時進行了推廣應用,極大地改善了礦石開采過程中的各項指標,促進了地下礦山開採的技術進步。
  16. Test code for performance and accuracy of numerically controlled turret and single spindle drilling machines with vertical spindle

    數控轉塔和立式單軸鉆床性能和加工精度試驗規程
  17. Around the zifusi low - lying area, the fanjiatai structure and jinjiachang structure have gained some oil streams through drilling well and production test, therefore, this area would be the oil and gas exploration favorable area in jiangling depression in the future

    資福寺窪陷周緣范家臺構造、金家場構造經鉆井試油已獲少量油流,因此是江陵凹陷今後油氣勘探的有利地區。
  18. Test conditions for turret and single spindle co - ordinate drilling machines with vertical spindle. testing of the accuracy

    帶立式主軸的轉塔式和單軸坐標鉆床的試驗條件.精確度試驗
  19. Test conditions for high accuracy turret and single spindle coordinate drilling and boring machines with table of fixed height with vertical spindle - testing of the accuracy - single column type machines

    帶垂直主軸固定高度工作臺的高準確度六角和單軸坐標鉆床和鏜床的試驗條件.準確度的試驗.單柱式機床
  20. Test conditions for high accuracy turret and single spindle coordinate drilling and boring machines with table of fixed height with vertical spindle - testing of the accuracy - portal type machines with moving table

    帶垂直主軸固定高度工作臺的高準確度六角和單軸坐標鉆床和鏜床的試驗條件.準確度的試驗.帶移動工作臺的輕便式機床
分享友人