dry construction 中文意思是什麼

dry construction 解釋
乾地施工
  • dry : adj 1 乾的,乾燥的;無水分的,干透了的。2 (井、河等)乾涸的,枯竭的;(氣候)乾旱的;無奶的;無...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Then, main projects and synthetic techniques of ecological agriculture construction are discussed. the results indicate that main projects include fertile soil project, water conservancy, forestation and virescence project, agricultural structure adjustment project, agriculture industrialization project, integrated use of agriculture rejectamenta project, high quality and innoxious farm produce project, livestock breeding project, sight - seeing agriculture project, etc. the suited techniques include ecology location scheme technique, agriculture rejectamenta use technique, energy source regeneration technique, sewage biologic depuration technique, innoxious farm produce technique, soil fertility increase technique, ecological control technique of plant disease and insect pests, economizing water technique of dry farming, agriculture environment reconstruction technique, etc. lastly the study brings forward the countermeasure and advice of ecological agriculture development

    根據我國生態農業建設成功經驗和濟南市目前生態農業建設基礎,提出濟南市生態農業建設重點工程為沃土工程、農田水利工程、造林綠化工程、農業結構調整工程、農業產業化工程、農業廢棄物綜合利用工程、優質和無公害農產品工程、養殖工程、觀光農業工程等;生態農業建設的關鍵技術為生態位配置技術、農業廢棄物資源化綠色技術、能源再生技術、污水生物凈化利用技術、無公害農產品技術、地力持續培肥利用技術、農作物病蟲草害生態控制技術、旱作農業高效節水技術及農業生態環境綜合整治技術等。
  2. The industrial company ausbau pirna gmbh carries out a outstanding quality within the range plumber, dry construction as well as roofer and roof plumber as one of the prominent enterprises

    Ausbau pirna gmbh作為一家具有豐富經驗的經濟型企業,為您提供(修建)屋頂工人、屋面工,屋頂白鐵工,白鐵工,無水建築范圍內效果顯著的、高價值的產品。
  3. With the development of the technology to build tunnels with sunken tubes in china, more and more subaquatic tumiels are built with sunken tubes and construction of the tubes in dry - docks is one of the important factors for building subaquatic tunnels with sunken tubes

    摘要隨著我國沉管法修建隧道技術的發展,越來越多的水下隧道採用沉管法施工,而干塢是沉管隧道修建的重要因素之一。
  4. The construction execution of prestressing work has many advantages such as : dry - work, rapidity, no organic adhesion agent, small space to be taken, the high efficiency of strengthening, so this way can be applied in the structures which request to improve bearing capacity largely and take small space after strengthening as well as other structures which will work in long time and in high temperature

    預應力加固過程是干作業,施工速度快,不使用有機粘結劑,加固后佔用空間小,加固效率高,適用於要求大幅度提高承載力及加固后佔用空間小的混凝土結構,也適用於要求施工速度快,加固后使用年限長,工作環境溫度高的結構。
  5. The industrial company baugeschaeft schlott carries out a outstanding quality within the range bricklayer work, dry construction as well as concrete work and framework reorganization as one of the prominent enterprises

    Baugeschaeft schlott是一家高級企業,該企業使用多種工藝製造混凝土作業,桁架整理,砌墻,無水建築。
  6. Ship ' s keel plate being laid in a construction dry dock at the newport news shipbuilding and dry dock company shipyard, newport news, virginia, 18 april 1949

    1949年4月18日,美國號的龍骨模板才剛在新港紐斯造船廠的乾塢中放下時的畫面。
  7. Development of water - saving agriculture, dry fanning and ecological agriculture, construction of fine quality product centers of gain, cotton, oil and tobacco, well - bred breeding, reform of middle and low yield fields, small watershed control, processing and storage of agricultural and sideline products, production of high - efficiency low toxicity and safe biological pesticide, construction of livestock breeding centers

    節水農業、旱作農業、生態農業開發,糧、棉、油、煙優質產品基地建設,良種繁育,中低產田改造,小流域治理,農副產品加工貯藏,高效、低毒、安全生物農藥及高效有機肥生產、養殖業基地建設等。
  8. Construction and operation of a sewage pumping station with an average dry weather flow of about 12, 100m3 per day

    建造及營辦一個平均旱季流量約為每天12 , 100立方米的污水泵水站。
  9. Various sewerage works were outlined in the east kowloon and north south kowloon sewerage master plans drawn up for the area, and these began to be carried out in the 1990s. they included construction of a number of dry weather flow interceptors along the nullah to intercept polluted storm flow, along with the replacement of worn - out and often overloaded sewerage facilities

    東九和九北部及南部污水收集整體計劃為該區規劃了多項污水工程,這些工程在九十年代陸續動工,當中包括沿啟德明渠建造旱季截流設備以截止污染雨水,以及更換負荷過重又殘舊的污水設施。
  10. The magswitch is suitable for many liquid and gaseous mediums and is used in vacuum technology pump control, refrigeration technology compressor control, gas technology stock monitoring, leak detection, filter monitoring dirt detection, level measurement overfill protection, dry - running protection, and is also used for a whole variety of measurement tasks in hydraulics and pneumatics, in machine construction and in building technology

    磁控開關適用於液體和氣體介質,可以用於真空技術氣泵控制製冷技術壓縮機控制氣體技術貯存量監測泄露探測過濾監測灰塵探測,液位測量過量保護空運行保護,也用於所有機械構造和建造技術中的液壓和氣壓測量任務。
  11. The sc400 is suitable for many liquid and gaseous mediums and is used in vacuum technology pump control, refrigeration technology compressor control, gas technology stock monitoring, leak detection, filter monitoring dirt detection, level measurement overfill protection, dry - running protection, and is also used for a whole variety of measurement tasks in hydraulics and pneumatics, in machine construction and in building technology

    Sc400開關適用於液體和氣體介質,可以用於真空技術氣泵控制製冷技術壓縮機控制氣體技術貯存量監測泄露探測過濾監測灰塵探測,液位測量過量保護空運行保護,也用於所有機械構造和建造技術中的液壓和氣壓測量任務。
  12. Originally in english members of the supreme master ching hai international association from korea working with mr. chandrasiri gajadeera, deputy minister of housing construction industry in matara and ampara launched a relief operation to assist tsunami victims in kalmunai and matara by distributing dry rations, utensils, medicine, tents and infants milk they had brought from korea. here the korean team leader hands a consignment of items for the victims to mrs. ferial ashraff, minister of housing construction industry, eastern province education and irrigation development, during their visit to ampara

    清海無上師世界會韓國救援隊,會同斯里蘭卡住屋營建部副部長全德拉喜瑞加爵迪拉chandrasiri gajadeera ,在馬塔拉matara及安帕拉ampara展開賑災工作,援助卡爾穆奈kalmunai與馬塔拉的災民,救援隊將購自韓國的乾糧用具藥品帳篷及嬰兒奶粉等物資分送給災民。
  13. By direct shear for and normal triaxial shear tests of non - saturated desert sand, the parper studied the effect of water content and dry density on the strength of the non - saturated desert sand, and set up the code of this sand. based on the plane strain test of non - saturated desert sand slope, the paper analysed the destruction way of the excavaion side during the construction by means of adding water, and brough forward a formule that calculates the allowable of excavation and pile hole

    通過非飽和沙漠砂直剪試驗和常規三軸剪切試驗,研究了含水量和干密度對非飽和砂強度的影響,建立了這種砂的強度準則。通過非飽和沙漠砂邊坡室內平面應變試驗,分析了沙漠井場浸法施工中就基坑壁的破壞方式,推導出了基坑和樁孔容許開挖深度的計算公式。
  14. Glock gmbh informs you about metal stand walls as well as about dry construction

    Glock gmbh是一家高效能的企業,該企業生產高精度的金屬立式墻,無水建築。
  15. We research the causes of concrete cracking, develop the high performance anti - cracking additive, optimize the concrete mix and construction techniques, increase the stability of concrete volume by shrinkage compensation, enhance splitting tensile strength, and can meet demand of high workability of fresh concrete. in the study, a thorough investigation of this problem is made from all points of view, with the aid of various modern measurement & testing technology and different theories & methods in surface physical chemistry, structural chemistry, solid - state chemistry, composite materials, fracture mechanics, etc. our research results have shown that the various shrinkage of concrete cause concrete cracking in building engineering, such as autogenous shrinkage, dry shrinkage, temperature shrinkage, plastic shrinkage, carbonized shrinkage, etc

    目前,解決混凝土開裂的方法是綜合的,我們調查研究了混凝土開裂的原因,開發研製了高性能抗裂外加劑,優化混凝土的設計和施工方法,並通過補償收縮達到混凝土體積穩定,提高抗裂強度,滿足混凝土拌和物高工作性能的要求。本研究採用多種測試技術,應用表面物理化學、結構化學、固體化學、復合材料學、斷裂力學等多學科的理論與方法,從不同的角度進行深入的研究和探討。通過調查研究建築工程中出現的混凝土開裂、滲漏問題,發現混凝土在非荷載作用下開裂主要是由混凝土的自收縮、乾燥收縮、溫度收縮、塑性收縮、碳化收縮等各種收縮變形引起的。
  16. On the dry - sticking granite construction quality control

    干掛花崗巖施工質量的控制
  17. Testing method for heat resistance of air dry leather of footwear construction

    製鞋靴的空氣乾燥皮革的耐熱試驗方法
  18. Combining an application case, whole - set underwater rubber fenders ' renew under low water level, was realized under dry construction condition through chemical anchorage of screws

    結合工程實例,在創造干施工環境下,通過化學錨固螺栓的方法,實現了更換低水位以下成套橡膠護舷。
  19. The personnel of atb akustik trockenbau gmbh is pleased if they could give you further data on the exercised fields of activity such as systematic, dry constructions, walls, moreover also on walls of partitions, corners, compile and beyond that also on dry construction and insulation work by mail or telephone

    Atb akustik trockenbau gmbh是一家知名的、誠信的生產商和服務商,該公司提供新型的、專門的產品,例如角,獲得、掙得、賺得、掌握、領會,絕緣工作,隔墻,無水建築,無水建築工作,系統遮蓋,大塊礦石。
  20. Contract procedures for building works - part c : general technical specifications for building works - dry construction works

    建築工程用承包條例.第c部分:建築工程用通用技術規范
分享友人