dual beam 中文意思是什麼

dual beam 解釋
雙波束
  • dual : adj. 二的;二重的;二體的;二元的。 dual personality 雙重人格。n. 【語法】雙數;【數學】對偶。 the D- Monarchy 雙重君主國〈指第一次世界大戰前的奧匈帝國〉。
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  1. Diffraction theory for collinear dual beam z - scan

    掃描的衍射理論
  2. Dichroic beam combiner ( dbc ) used for hwil simulator is the key technique of the mmw / ir dual mode simulation

    毫米波/紅外雙模成像制導模擬用二向色鏡,是用於毫米波/紅外雙模成像模擬技術的關鍵器件。
  3. Abstract : in this paper , a ray - optics analysis is performed to investigate the asymmetry of dual beam scanning field produced by a rotating polygon. some basic equations of dual beam scan are derived , such as , the position vector for the incident point , the scalar expression for reflected ray , scan pattern on observation plane ect. the far - field asymmetry of the scanning field has been discussed

    文摘:應用幾何光學理論研究了多光束轉鏡掃描場的非對稱性,導出多光束掃描入射點位置矢量、反射線標量表達式、觀察面上的掃描軌跡方程,並研究了掃描遠場的非對稱性。
  4. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋結構設計情況,對於五跨梁拱組合橋梁各孔跨合理的跨度比、疊拱的受力行為及連續梁系桿截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續梁系桿的剛度和應力情況、鋼管混凝土拱的應力情況。
  5. We prepare the si - sio2 and ge - sio2 thin film by using the dual ion beam co - sputtering method and the rf co - sputtering technique respectively, adjusting the substrate temperature ( ts ) and the annealing temperature ( ta ). then we analysis the structure of the thin film by using the xrd and tem

    論文採用雙離子束濺射和射頻磁控濺射沉積技術,通過改變薄膜沉積過程中基片溫度( t _ s )以及薄膜制備完成後退火溫度( t _ a )分別制備了si - sio _ 2和ge - sio _ 2薄膜。
  6. In this paper, we reported the structural and luminescent properties of si - based oxide films containing semiconductor si, ge or metal al powders prepared by a dual - ion - beam co - sputtering method ( si - sio2 films and al - si - sio2 films ) or rf magnetron sputtering technique ( ge - sio2 films ), and analyze the pl and el mechanism. 1. the composite films of si - sio2 films were prepared by dual ion beam co - sputtering method from a composite target in argon atmosphere

    我們利用雙離子束共濺射和射頻磁控共濺射技術制備了一系列含有半導體si 、 ge顆粒及金屬顆粒al的薄膜,即si - sio _ 2薄膜、 ge - sio _ 2薄膜和al - si - sio _ 2薄膜,分別對它們的結構、光吸收以及發光性質進行了研究。
  7. In this paper, dual - beam transmission problem that possess to a certainty included angle and gains the nonlinear schrdinger coupled equation ( nnlse ) in self - defocusing media is discussed

    摘要自散焦介質中雙光束斜入射耦合能發生光束偏轉,通過數值模擬發現在非線性折射率不是均勻分佈時光束偏轉能降低抽運光功率並且偏轉角度不減小,在相同的功率條件下,能產生更大的偏轉。
  8. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  9. The results of the experiments show that the ti3al - tcll dual alloys, by vacuum - electron - beam weld, hot die forging and 680c / 12h, ac, heat treatments, have satisfied synthesis properties of intensity, plasticity, hardness. and also it is the feasiblie way. this will establish the supporting technology for the manufacture of the compress disk in the areoengine

    實驗結果表明,經真空電子束焊接ti _ 3al ? tc11雙合金經過熱模鍛造和680 12h , ac或815 1h + 700 8h , ac熱處理后,焊接區組織過渡均勻,可以使得焊縫處強度在室溫拉伸時高於ti _ 3al ,而在600拉伸時高於tc11合金,獲得強度、塑性、硬度均令人滿意的綜合性能,且是一條可行的工藝路線。
  10. Reforming beam pumping unit into dual variable - diameter wheel pumping unit

    由游梁式抽油機改造成的雙變徑輪式抽油機
分享友人