duplicate line 中文意思是什麼

duplicate line 解釋
雙線線路
  • duplicate : vt 1 使加倍,使成雙。2 使成雙聯式,使有正副兩份,復制,復寫,列印。3 重疊,雙折。4 重演,重復。ad...
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. Similarly create six more duplicate frames and unhide the third line for these frames

    再復制這六個幀並將框框中的文字顯示為第三段文字。
  2. Based on existing national standards, coercive clauses and related national and regional laws and regulations and by means of the new perspective of engineering supervision of information data, this system helps to achieve a standardized management of engineering supervision and solve problems out of present constructions due to low level engineering supervision and management. it also expands engineering material management scope, settles the problems of duplicate and arduous data processing, heavy workload and pressure, low efficiency due to manual work, poor work quality and delayed information feedback in conventional engineering material management. in the trend of computerization development in construction line, this system makes full use of computer and web technologies, sets up engineering technic and information management system applicable to engineering project supervision, realizes science - realization, standardization and intelligence of engineering supervision and guarantees a scientific and accurate quality evaluation and control of the work

    該系統以國家現行的規范、標準、強制性條文為基礎,結合國家及地方的有關法律、法規和行政規章及地方行政主管部門對工程技術資料的具體要求,用信息化的手段實現了工程施工技術資料檔案管理的規范化和標準化,從一個新的角度提出對工程施工技術資料的管理,成功地解決了目前存在已久的工程施工技術資料管理水平低的難題,拓展了工程施工技術資料管理的范圍,改變傳統的工程施工技術資料管理存在的數據處理重復、繁瑣、工作量大、手工操作效率低、質量差、信息反饋不及時等問題,適應建築行業信息化發展的需要,充分利用計算機技術及網路技術,建立適合於工程項目管理的施工技術資料管理信息系統,實現工程施工技術資料管理的科學化、規范化及智能化,實現對工程質量控制及評定的科學性、準確性。
  3. Duplicate the frame and hide logo and second line to create blink effect

    復制幀,並隱藏公司名字和圖標所在曾形成閃爍效果。
分享友人