  1. This paper takes the steel constructions workshop building of bao ji bridge girder plant as background, inquiring into using isothermal level jet airflow to cut off workshop in the middle to organize airflow in it, attempting to resolve the problem of ventilation and dust removal in large space which has changeable dust source

    本文以寶雞橋梁廠鋼結構車間的噴丸打磨廠房為工程背景,探討運用等溫水平射流進行空間隔斷,合理組織室內氣流,嘗試解決具有高大空間、變動塵源特點的高大廠房通風除塵問題。
  2. Reconstruction of dust removal system in active lime plant

    鞍礦活性石灰廠除塵系統改造
  3. From 1996 to 1998, as a project manager, i finished the studies on simple constructed venturi water film scrubber desulphurization technology and equipment for small and medium _ sized coal _ fired power plant. such studies are one of the projects required to rack one ' s brain with emphasis by ministry of science and technology in " ninth _ five _ year " plan. on the basis of the aboved researches, being entrusted with jiangxi provencial electric power bureau and guizhou provincial electric power bureau, we conducted the engineering feasible researches and preliminary design for nanchang power power plant and guixi power plant in jiangxi province, guiyang power plant in guizhou province, yongji power plant and taiyuan thermal power plant no. 2 in shanxi province to use venturi water film scrubber simple constructed desulphurization technology. the major technical targets of above consultation are around 70 % of desulphurization rate and improved dust removal efficiencies comparing with original efficiencies. the key features of this new technology are advanced and practical, low in investment cost, small in land occupied, suit for renovating the existing power plant and suited to chinese conditions

    1998年完成了"九.五"國家科技攻關項目< >的開發工作.在此基礎上,受貴州省電力局,江西省電力局,山西省電力局的委託,分別對貴陽發電廠,南昌發電廠,貴溪發電廠,永濟發電廠,太原第二熱電廠等進行了簡易脫硫技術的工程可行性研究以及初步設計等.上述咨詢內容中的主要技術指標是脫硫效率達到70 %左右,並可提高原除塵器的除塵效率.有投資低,佔地面積小,適合老廠改造,技術先進實用等特點
  4. Reconstruction of dust removal system in finished product ore bunker in sintering plant of lian yuan steel

    漣鋼燒結廠成品倉除塵系統的改造
  5. The refuse incineration plant in nanshan was retrofitted with emission reduction facilities in 2004, using fgd and dust removal technologies. endswednesday, february 2, 2005

    位於南山區的垃圾焚燒廠2004年已設置了空氣污染物減排設備,進行?氣脫硫及除塵。